← Back
BuildNYC
Over six families without stores
1820 CROTONA AVENUE
BRONX · BIN 2009946
💬 Discuss this project
1906Year Built
3Stories
C1Building Class
R7-1Zoning
—Gross Floor Area
10Units
1 Active Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: Crotona Equities NY · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof35p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 338p · 1 filing · 20 docs
Floor 235p · 1 filing · 20 docs
Floor 1Pipe scaffold37p · 2 filings · 20 docs
Basement37p · 1 filing · 20 docs
Site & exteriorSidewalk Shed Installation1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Crotona Equities NY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates502/03/2025
EE201/15/2025
Vasilios Artemiou PE112/23/2024
Arquitectura Varela211/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG Group USA803/21/2026
NYC Design File203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Revamp NYCGeneral Contractor207/08/2026
Construction Services Con NYScaffold207/08/2026
NY Genesis BuildersGeneral Contractor103/21/2026
Revamp NYCspecialty_contractor104/09/2026
AmokFire Protection107/08/2026
AmokPlumbing107/08/2026
First Quality ElectricalElectrical103/21/2026
Mac FelderPlumbing103/22/2026
AG Power ElectricElectrical103/21/2026
All Phase Plumbing & HeatingPlumbing109/23/2004
We BuildGeneral Contractor107/30/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616702/03/2025
Shahrish Shuvo Engineering8524101/15/2025
Building Lifecycle
11/09/2026
Ftm bldg in a code compliant manner-obsvd on EXP1 on ground floor (first)window openings a chipped stone window lintel and stone lintel to the…
DOB violation · open
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
09/18/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01058163-I1-GC
06/05/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/25/2025
Signed off — Alteration CO
Filing Structural application subsequent to the primary approved application X01058163-I1
X01058163-S2
156 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedRevamp NYC01/21/2025
DOB NOWSprinklersSigned-offAmok01/15/2025
DOB NOWMechanical SystemsSigned-offRevamp NYC01/10/2025
DOB NOWGeneral ConstructionPermit IssuedRevamp NYC01/09/2025
DOB NOWPlumbingSigned-offAmok01/03/2025
DOB NOWSupported ScaffoldSigned-offConstruction Services Con NY11/26/2021
DOB NOWSidewalk ShedSigned-offConstruction Services Con NY11/26/2021
BIS—ISSUEDNY Genesis Builders05/17/2016
BIS—ISSUEDNY Genesis Builders01/12/2015
BISPLISSUEDA P Plumbing & Heating09/23/2004
BIS—ISSUEDWe Build07/30/2004
1 project · most recent 02/03/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
02/03/2025Permit IssuedRevamp NYCHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 02/03/2025
Sprinkler System
FiledStatusContractorScope
02/03/2025Signed-offAmokSprinkler System
1 project · most recent 02/03/2025
Water/Sanitary
FiledStatusContractorScope
02/03/2025Signed-offAmokWater/Sanitary
3 projects · most recent 04/22/2025
General Wiring
FiledStatusContractorScope
04/22/2025CompleteFirst Quality ElectricalGeneral Wiring
04/09/2025CompleteAG Power Electric—
12/07/2021CompleteBorowide Elect'l Contractors—
1 project · most recent 02/03/2025
Wood
FiledStatusContractorScope
02/03/2025Permit IssuedRevamp NYCWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
02/26/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/26/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/26/2025Maintenance informationFAHAD FATEHenergy_progress
02/26/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/23/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/23/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/23/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/23/2025Maintenance informationFAHAD FATEHenergy_progress
01/23/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/23/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/02/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
01/02/2025Wood – Prefabricated I-JoistsShahrish Shuvospecial
01/02/2025FinalShahrish Shuvoprogress
12/30/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/30/2024Wood – Prefabricated I-JoistsFAHAD FATEHspecial
12/24/2024Fenestration areasFAHAD FATEHenergy_progress
12/24/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/24/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/24/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/24/2024Maintenance informationFAHAD FATEHenergy_progress
12/24/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/24/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/24/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/24/2024MeteringFAHAD FATEHenergy_progress
12/24/2024Permanent certificateFAHAD FATEHenergy_progress
Latest 25 of 44.
83 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account