← Back
BuildNYC
Three families
1825 ANDREWS AVENUE SOUTH
BRONX · BIN 2009167
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
4,887 sfGross Floor Area
3Units
3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Three families · 2,989 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issuedResidential building conversion to 5 units1p · 1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Envision Engineering Services110/26/2026
Building Lifecycle
10/26/2026
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 5 units to an existing 2 story + basement building.
X01473815-I1
10/14/2026
Special inspection requirement — Permanent certificate
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/14/2026
Special inspection requirement — Energy Code Compliance Inspections
10/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
17 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/19/2022
FiledStatusContractorScope
10/19/2022Permit IssuedTriple T Electric—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/14/2026Permanent certificate—energy_progress
10/14/2026Fire-Resistant Penetrations and Joints—special
10/14/2026Energy Code Compliance Inspections—progress
10/14/2026Fire-Resistance Rated Construction—progress
10/14/2026Fenestration air leakage—energy_progress
10/14/2026Maintenance information—energy_progress
10/14/2026Fenestration and door U-factor and product ratings—energy_progress
10/14/2026Insulation placement and R values—energy_progress
10/14/2026Fenestration areas—energy_progress
10/14/2026Metering—energy_progress
10/14/2026Interior lighting power—energy_progress
10/14/2026Air barrier - visual inspection—energy_progress
10/13/2026Structural Stability – Alterations of existing buildings—special
1 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account