← Back
Health center, child center, clinic
18-21 CORNAGA AVENUE
QUEENS · Far Rockaway-Bayswater · BIN 4625630
💬 Discuss this project
2003Year Built
2Stories
I5Building Class
R6Zoning
8,520 sfGross Floor Area
1Units
0 Open Violations
Health center, child center, clinic · Owner of record: 1821 CORNAGA LLC · 8,502 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ON STAR MANAGEMENT103/22/2026
1821 CORNAGA403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC708/19/2026
JFA ARCHITECTS & ENGINEERS DPC808/05/2026
ATLAS ATC ENGINEERING INC107/02/2026
PAUL G. JONES, P.E.305/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ON STAR MANAGEMENT LLCGeneral Contractor909/18/2026
YOSEF BLAUElectrical303/21/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor304/11/2026
RIGHTWAY PLBG AND HTG INCFire Protection207/08/2026
BEST MECHANICAL SVCS INCPlumbing207/08/2026
LUIGI CALIENDO & SONS,INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEXUS INSPECTIONS AND TES96861408/19/2026
Building Lifecycle
All (54)Filed (19)Permit Issued (15)Signed Off (4)Violation (8)Inspection (8)
09/17/2026
Permit issued — Foundation
Q01206655-S3-FO
08/19/2026
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P9
08/05/2026
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P8
08/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/30/2026
Signed off — Alteration
INSTALLATION OF NEW PUMP JACK SCAFFOLD AS PER PLANS
Q01424177-I1
07/30/2026
Signed off — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S2
07/30/2026
Permit issued — Supported Scaffold
Q01424177-I1-SF
07/29/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01375643-S1
07/29/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01375643-I1
07/20/2026
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P7
07/02/2026
Filed — Alteration
INSTALLATION OF NEW PUMP JACK SCAFFOLD AS PER PLANS
Q01424177-I1
06/12/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
06/10/2026
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P6
06/03/2026
Violation issued (ECB, closed)
Unknown
06/03/2026
Violation issued (ECB, closed)
Construction
06/03/2026
Violation issued (ECB, closed)
Unknown
06/03/2026
Violation issued (ECB, closed)
Construction
06/03/2026
Violation issued (ECB, closed)
Construction
06/03/2026
Violation issued (ECB, closed)
Unknown
06/03/2026
Violation issued (ECB, closed)
Construction
05/12/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
05/07/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01375643-P1
04/09/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01375643-S1
04/09/2026
Permit issued — Protection and Mechanical Methods
Q01375643-S1-PMM
04/01/2026
Permit issued — Sidewalk Shed
Q01375643-I1-SH
04/01/2026
Permit issued — Supported Scaffold
Q01375643-I1-SF
03/31/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01375643-I1
03/31/2026
Permit issued — General Construction
Q01206655-I1-GC
03/19/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/18/2026
Permit issued — Support of Excavation
Q01206655-S2-SE
03/11/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2026
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P3
02/12/2026
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P2
02/03/2026
Violation issued (ECB, closed)
Construction
01/21/2026
Permit issued — Support of Excavation
Q01206655-S2-SE
01/14/2026
Permit issued — Plumbing
Q01206655-S5-PL
01/13/2026
Permit issued — Foundation
Q01206655-S3-FO
01/12/2026
Permit issued — Structural
Q01206655-S4-ST
01/12/2026
Permit issued — Sprinklers
Q01206655-S7-EW-SP
01/12/2026
Permit issued — Standpipe
Q01206655-S8-EW-SD
01/05/2026
Permit issued — Support of Excavation
Q01206655-S2-SE
01/02/2026
Permit issued — Mechanical Systems
Q01206655-S6-MS
11/26/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-P1
08/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S5
08/01/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S6
07/24/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S8
07/22/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S7
06/27/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S2
06/27/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S4
06/27/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-S3
06/03/2025
Filed — New Building
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB # Q01206655-I1
Q01206655-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedON STAR MANAGEMENT LLC09/17/2026
DOB NOWSupported ScaffoldSigned-offON STAR MANAGEMENT LLC07/30/2026
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING04/09/2026
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING04/01/2026
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING04/01/2026
DOB NOWGeneral ConstructionPermit IssuedON STAR MANAGEMENT LLC03/31/2026
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC03/18/2026
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC01/21/2026
DOB NOWPlumbingPermit IssuedBEST MECHANICAL SVCS INC01/14/2026
DOB NOWFoundationPermit IssuedON STAR MANAGEMENT LLC01/13/2026
DOB NOWStructuralPermit IssuedON STAR MANAGEMENT LLC01/12/2026
DOB NOWSprinklersPermit IssuedRIGHTWAY PLBG AND HTG INC01/12/2026
DOB NOWStandpipePermit IssuedRIGHTWAY PLBG AND HTG INC01/12/2026
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC01/05/2026
DOB NOWMechanical SystemsPermit IssuedON STAR MANAGEMENT LLC01/02/2026
BIS—ISSUEDB.O.S.S. ASSOCIATES, INC08/08/2002
BISEQISSUEDB.O.S.S. ASSOCIATES, INC07/29/2002
BISPLISSUEDJ.D. MASTERS PLG AND HEATING04/15/2002
BISEQISSUEDB.O.S.S. ASSOCIATES, INC02/14/2002
BIS—ISSUEDB.O.S.S. ASSOCIATES, INC02/14/2002
1 project · most recent 08/19/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedON STAR MANAGEMENT LLCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Daikin RXTA36AAVJU 34,200 BTU · Vrf Outdoor ×66
RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×30
RXTA48AAVJU 45,500 BTU · Vrf Outdoor ×7
Heating
Qmark CSH-07A 7,680 BTU · Baseboard ×60
1 project · most recent 08/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedBEST MECHANICAL SVCS INCGas, Storm, Water/Sanitary
6 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
08/26/2026Permit IssuedS&R ELECTRICAL & MECHANIC1 meters, 1 new_meters
05/28/2026Permit IssuedABZ ELECTRIC INC—
04/14/2026Permit IssuedINTELOGIC ELECTRIC, INC.—
03/19/2026Permit IssuedSOLAS ELECTRICAL CORP—
11/19/2025Permit IssuedS&R ELECTRICAL & MECHANIC—
2 projects · most recent 07/02/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/02/2026Signed-offON STAR MANAGEMENT LLCScaffold
05/07/2026Signed-offCONSOLIDATED SCAFFOLDINGScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/03/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/12/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/12/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/19/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/11/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
08/26/2026Energy Code Compliance InspectionsJunda Qiuprogress
08/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJunda Qiuspecial
08/26/2026Fire-Resistant Penetrations and JointsJunda Qiuspecial
08/26/2026HVAC-R and service water heating system controlsJunda Qiuenergy_progress
08/26/2026HVAC-R and service water heating equipmentJunda Qiuenergy_progress
08/26/2026HVAC-R and service water piping design and insulationJunda Qiuenergy_progress
08/26/2026Maintenance informationJunda Qiuenergy_progress
08/18/2026Energy Code Compliance InspectionsJunda Qiuprogress
08/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJunda Qiuspecial
08/18/2026Fire-Resistant Penetrations and JointsJunda Qiuspecial
08/18/2026HVAC-R and service water heating system controlsJunda Qiuenergy_progress
08/18/2026HVAC-R and service water heating equipmentJunda Qiuenergy_progress
08/18/2026Maintenance informationJunda Qiuenergy_progress
08/18/2026HVAC-R and service water piping design and insulationJunda Qiuenergy_progress
08/04/2026Lighting controlsJunda Qiuenergy_progress
08/04/2026Exterior lighting powerJunda Qiuenergy_progress
08/04/2026Energy Code Compliance InspectionsJunda Qiuprogress
08/04/2026Alternative Materials - OTCR Buildings Bulletin Number—special
08/04/2026Exterior Insulation and Finish Systems (EIFS)Junda Qiuspecial
08/04/2026Fire-Resistant Penetrations and JointsJunda Qiuspecial
08/04/2026VestibulesJunda Qiuenergy_progress
08/04/2026Maintenance informationJunda Qiuenergy_progress
08/04/2026Electrical motors and elevatorsJunda Qiuenergy_progress
08/04/2026Protection of exposed foundation insulationJunda Qiuenergy_progress
08/04/2026Fenestration and door U-factor and product ratingsJunda Qiuenergy_progress
Latest 25 of 85.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/20/2026Q01206655-P9Request digital key ↗
08/19/2026Q01206655-I1Request digital key ↗
08/19/2026Q01206655-P9Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
08/27/2025440824930Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/27/2025440824930Open ↗
▸DOB NOWHPD - Permit Notice1
08/19/2026Q01206655-I1Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026Q01206655-P8Open ↗
08/13/2026Q01206655-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026Q01206655-P8Open ↗
08/13/2026Q01206655-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/04/2026421134472Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/04/2026421134472Open ↗
▸BISRESOLVE ZONING DISCREPANCY1
11/05/2025440824930Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/04/2026421134472Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/04/2026421134472Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/19/2026Q01206655-P8Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01206655-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/19/2026Q01206655-I1Open ↗
08/19/2026Q01206655-S3Open ↗
08/19/2026Q01206655-P9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/18/2026Q01206655-P8Open ↗
09/18/2026Q01206655-P8Open ↗
09/18/2026Q01206655-P8Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/24/2026Q01206655-P7Open ↗
09/18/2026Q01206655-P8Open ↗
09/18/2026Q01206655-P8Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/27/2025440824930Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/27/2025440824930Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/19/2026Q01206655-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/19/2026Q01206655-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/19/2026Q01206655-I1Open ↗
08/19/2026Q01206655-P8Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/05/2025440824930Open ↗
▸BISSTREET TREE CHECKLIST1
11/05/2025440824930Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01206655-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026Q01206655-S2Open ↗
08/13/2026Q01206655-S3Open ↗
08/13/2026Q01206655-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01206655-S3Open ↗
08/13/2026Q01206655-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸BISDOT APPROVAL FOR ADA RAMPS AT CORNERS/ PEDSCROSSINGS1
11/05/2025440824930Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/27/2025440824930Open ↗
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION3
11/06/2025440824930Open ↗
11/05/2025440824930Open ↗
08/27/2025440824930Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026Q01206655-P8Open ↗
08/13/2026Q01206655-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01206655-I1Open ↗
08/19/2026Q01206655-P8Open ↗
▸DOB NOWSite Survey: Initial2
08/19/2026Q01206655-P8Open ↗
08/13/2026Q01206655-I1Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
11/06/2025440824930Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
11/05/2025440824930Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/05/2025440824930Open ↗
▸BISBPP: GRADE STUDY1
11/06/2025440824930Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/04/2026421134472Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01206655-S2Open ↗