Primarily 2 family with 1 store or office
1826 FOWLER AVENUE
BRONX · BIN 2045326
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R4Zoning
4,032 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 1826 FOWLER AVE CORP · 3,325 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 27p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2022$995K—— → —$247/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.505/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781505/30/2024
Building Lifecycle
All (17)Filed (5)Permit Issued (3)Violation (1)Inspection (8)
11/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/20/2024
Permit issued — Plumbing
X00974722-S1-PL
12/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/30/2024
Filed — Alteration
MINOR INTERIOR RENOVATION OF EXISTING 2-STORY BUILDING WITH GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00974722-P3
05/17/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/08/2024
Filed — Alteration
MINOR INTERIOR RENOVATION OF EXISTING 2-STORY BUILDING WITH GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00974722-P2
01/31/2024
Filed — Alteration
MINOR INTERIOR RENOVATION OF EXISTING 2-STORY BUILDING WITH GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00974722-P1
12/15/2023
Permit issued — General Construction
X00974722-I1-GC
12/14/2023
Permit issued — Plumbing
X00974722-S1-PL
12/12/2023
Filed — Alteration
MINOR INTERIOR RENOVATION OF EXISTING 2-STORY BUILDING WITH GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00974722-I1
12/12/2023
Filed — Alteration
MINOR INTERIOR RENOVATION OF EXISTING 2-STORY BUILDING WITH GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00974722-S1
01/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.12/20/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC12/15/2023
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.12/14/2023
1 job · most recent 05/30/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/30/2024Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
1 job · most recent 11/21/2024
General Wiring
FiledStatusContractorScope
11/21/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/31/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/31/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/31/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/28/2024Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
05/28/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/28/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/28/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/28/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
05/28/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
05/28/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
05/28/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/11/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/11/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/11/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
03/11/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/11/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/11/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/11/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/08/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/08/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/08/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
03/08/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/08/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/08/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/08/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X00974722-S1Request digital key ↗
08/21/2026X00974722-I1Request digital key ↗
08/21/2026X00974722-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026X00974722-P2Open ↗
08/28/2026X00974722-P2Open ↗
08/26/2026X00974722-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026X00974722-I1Open ↗
08/21/2026X00974722-P3Open ↗
08/21/2026X00974722-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026X00974722-P2Open ↗
08/26/2026X00974722-I1Open ↗
08/24/2026X00974722-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026X00974722-I1Open ↗
08/21/2026X00974722-P3Open ↗
08/21/2026X00974722-P2Open ↗
Showing 3 of 5 on file for this type