ECB04/21/2026AT THE TIME OF INSPECTION OF THE 3-STORY NEW BUILDING, I OBSERVED THAT THE EARTHWORK WAS COMPLETED. FURTHER RESEARCH OF THE DOB RECORDS SHOWED THAT NO NOTIFICATION OF COMMENCEMENT HAD BEEN PROVIDED TO THE DOB P$2K due
ECB09/09/2025AT THE 2ND FLOOR OF THE BUILDING IN MULTIPLE LOCATIONS, OPENING SPANNING ABOUT 5' WIDE AND LARGER WITH NO GUARDRAILS INSTALLED TO PREVENT WORKERS FROM FALLING. EVERY WINDOW OPENINGS THAT WAS FRAMED HAD NO GUARD$12K due
ECB09/09/2025PROPOSED 3 STORY ALT BUILDING CURRENTLY UP TO 2 FL. OBSERVED AT TIME OF INSPECTION NEW FOUNDATION WALLS WAS BUILT AROUND ENTIRE SITE LEAVING NO EXISTING FOUNDATION WALL OR PARTITION WALLS IN THE BASEMENT REMAIN$1K due
Two family brick · 4,350 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.