← Back
Primarily 5-6 family with 1 store or office
1828 NOSTRAND AVENUE
BROOKLYN · BIN 3120051
💬 Discuss this project
1936Year Built
3Stories
S5Building Class
R6Zoning
5,100 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: SHELDASH LLC · 2,008 sf lot · 2.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 1 filing · 6 docs
Floor 1Under Construction4p · 1 filing · 6 docs
CellarUnder Construction16p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHELDASH409/13/2026
TRS707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2023$1.4M—— → —$265/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRAFEDE ARCHITECTURE, PLLC205/06/2026
NMI ARCHITECTURE, PLLC308/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NMI ARCHITECTURE PLLC603/21/2026
GRAFEDE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGLIORE RESTORATION INCGeneral Contractor407/08/2026
ALEXIS PROP MGT AND DELGeneral Contractor107/08/2026
G. ROLLINS PLBG & HTG LLCPlumbing107/02/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAFEDE ARCHITECTURE, PLL8251103/05/2026
NMI ARCHITECTURE, PLLC6825208/14/2024
MB INSPECTIONS, CORP.8703206/21/2024
Building Lifecycle
All (83)Filed (5)Permit Issued (5)Signed Off (2)Violation (60)Inspection (8)Special Inspection (3)
06/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/03/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/22/2026
Permit issued — Plumbing
B01361018-S1-PL
05/06/2026
Filed — Alteration
RENOVATION FOR A COMMERCIAL KITCHEN, INCLUDING DEMOLITION, NEW PARTITION WALLS, AND INSTALLATION OF ALL REQUIRED FIXTURES AND KITCHEN EQUIPMENT.
B01361018-S1
05/05/2026
Violation issued (HPD, closed)
A
04/06/2026
Permit issued — General Construction
B01361018-I1-GC
03/05/2026
Filed — Alteration
RENOVATION FOR A COMMERCIAL KITCHEN, INCLUDING DEMOLITION, NEW PARTITION WALLS, AND INSTALLATION OF ALL REQUIRED FIXTURES AND KITCHEN EQUIPMENT.
B01361018-I1
06/10/2025
Violation issued (HPD, closed)
A
12/12/2024
Signed off — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE AT CELLAR & 1ST FLOOR EX RETAIL STORE, REPAIR SOME AREAS OF THE WALL PARTITIONS, REPAIR THE CEILING & FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00999338-I1
11/15/2024
Signed off — Alteration
THIS APPLICATION IS FILED FOR PLUMBING WORK AT CELLAR & 1ST FLOOR IN CONJUNCTION WITH ALT-2 # B00999338-I1 FOR REPAIR WORK AFTER FIRE DAMAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY
B00999403-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
BORIS BALKHIYEV
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
08/14/2024
Filed — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE AT CELLAR & 1ST FLOOR EX RETAIL STORE, REPAIR SOME AREAS OF THE WALL PARTITIONS, REPAIR THE CEILING & FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00999338-P1
08/12/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/02/2024
Permit issued — Plumbing
B00999403-I1-PL
06/21/2024
Filed — Alteration
THIS APPLICATION IS FILED FOR PLUMBING WORK AT CELLAR & 1ST FLOOR IN CONJUNCTION WITH ALT-2 # B00999338-I1 FOR REPAIR WORK AFTER FIRE DAMAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY
B00999403-I1
05/22/2024
Permit issued — General Construction
B00999338-I1-GC
05/13/2024
Permit issued — General Construction
B00999338-I1-GC
04/19/2024
Violation issued (HPD, closed)
B
04/19/2024
Violation issued (HPD, closed)
B
04/12/2024
Violation issued (HPD, closed)
C
04/12/2024
Violation issued (HPD, closed)
C
04/12/2024
Violation issued (HPD, closed)
B
04/12/2024
Violation issued (HPD, closed)
C
04/12/2024
Violation issued (HPD, closed)
B
03/08/2024
Filed — Alteration
THIS PROJECT IS FILED TO REPAIR FIRE DAMAGE AT CELLAR & 1ST FLOOR EX RETAIL STORE, REPAIR SOME AREAS OF THE WALL PARTITIONS, REPAIR THE CEILING & FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00999338-I1
11/21/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Violation issued (HPD, closed)
A
05/24/2023
Violation issued (HPD, closed)
B
05/24/2023
Violation issued (HPD, closed)
A
05/24/2023
Violation issued (HPD, closed)
B
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Violation issued (HPD, closed)
A
05/18/2023
Violation issued (HPD, closed)
B
05/18/2023
Violation issued (HPD, closed)
A
05/18/2023
Violation issued (HPD, closed)
A
05/18/2023
Violation issued (HPD, closed)
C
05/18/2023
Violation issued (HPD, closed)
B
05/18/2023
Violation issued (HPD, closed)
C
05/18/2023
Violation issued (HPD, closed)
A
05/18/2023
Violation issued (HPD, closed)
C
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2023
Violation issued (HPD, closed)
A
12/08/2022
Violation issued (HPD, closed)
C
12/08/2022
Violation issued (HPD, closed)
C
12/08/2022
Violation issued (HPD, closed)
B
12/08/2022
Violation issued (HPD, closed)
B
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedG. ROLLINS PLBG & HTG LLC05/22/2026
DOB NOWGeneral ConstructionPermit IssuedALEXIS PROP MGT DEL04/06/2026
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING07/02/2024
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC05/22/2024
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC05/13/2024
1 project · most recent 11/17/2020
General Wiring
FiledStatusContractorScope
11/17/2020Permit IssuedDORION NORTON ELECL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/03/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/20/2024Tenant Protection Plan ComplianceBORIS BALKHIYEVspecial
08/20/2024Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
08/20/2024Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B00999338-I1Request digital key ↗
08/25/2026B00999338-P1Request digital key ↗
08/24/2026B00999403-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B00999338-I1Open ↗
08/24/2026B00999403-I1Open ↗
08/17/2026B01361018-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00999338-I1Open ↗
08/25/2026B00999338-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00999338-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B00999338-I1Open ↗
08/24/2026B00999403-I1Open ↗
08/17/2026B01361018-S1Open ↗
Showing 3 of 5 on file for this type