HPD05/11/2023§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT METAL HEAT RISER PIPE IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/11/2023§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT METAL HEAT RISER PIPE IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Two family frame · 2,375 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.