← Back
Two family frame
183-02 90 AVENUE
QUEENS · BIN 4211957
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4-1Zoning
1,968 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family frame · 5,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Roof5p · 1 filing · 8 docs
Cellar3p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/11/2026
STUDIO 51 ARCHITECTURE, PLLC506/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FADJOL KOLAGeneral Contractor407/08/2026
GW MECHANICAL CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/11/2026
HRF SERVICES CORP5616104/30/2022
Building Lifecycle
All (52)Filed (6)Permit Issued (5)Signed Off (3)Violation (12)Inspection (11)Objection (2)Special Inspection (13)
05/28/2026
Violation issued (HPD, open)
I
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
B
05/15/2026
Permit issued — Solar
Q01399392-I1-SL
05/11/2026
Filed — Alteration
Q01399392-I1
05/11/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/08/2026
Special inspection requirement — Final
Walid Abdulla
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/20/2024
Signed off — Alteration
Make changes to the approved drawing to match the as-built condition.
Q00727037-S1
12/18/2024
Signed off — Alteration
Make changes to the approved drawing to match as-built condition.
Q00727051-S1
12/18/2024
Signed off — Alteration
Make changes to the approved drawing to match the as-built condition.
Q00727037-I1
12/28/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/25/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2023
Filed — Alteration
Make changes to the approved drawing to match as-built condition.
Q00727051-P1
06/20/2023
Permit issued — General Construction
Q00727037-S1-GC
06/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/05/2023
Permit issued — Plumbing
Q00727051-S1-PL
05/31/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/06/2022
Objection raised — Scope
12/06/2022
Objection resolved — Addressed
12/01/2022
Filed — Alteration
Make changes to the approved drawing to match the as-built condition.
Q00727037-S1
12/01/2022
Filed — Alteration
Make changes to the approved drawing to match as-built condition.
Q00727051-S1
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2022
Permit issued — Plumbing
Q00727051-I1-PL
08/03/2022
Permit issued — General Construction
Q00727037-I1-GC
05/01/2022
Filed — Alteration
Make changes to the approved drawing to match the as-built condition.
Q00727037-I1
05/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/01/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/30/2022
Filed — Alteration
Make changes to the approved drawing to match as-built condition.
Q00727051-I1
04/27/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/27/2022
Special inspection requirement — Final
FAHAD FATEH
04/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/22/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2011
Violation issued (ECB, closed)
Construction
12/08/2011
Violation issued (ECB, closed)
Unknown
05/19/2008
Violation issued (ECB, closed)
Quality of Life
05/19/2008
Violation issued (ECB, closed)
Quality of Life
03/07/2005
Violation issued (ECB, closed)
Construction
01/24/2005
Violation issued (ECB, closed)
Zoning
01/12/2005
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedBRUCHE MECHANICAL NY LLC05/15/2026
DOB NOWGeneral ConstructionSigned-offFADJOL KOLA06/20/2023
DOB NOWPlumbingSigned-offGW MECHANICAL CORP06/05/2023
DOB NOWPlumbingPermit IssuedGW MECHANICAL CORP08/04/2022
DOB NOWGeneral ConstructionSigned-offFADJOL KOLA08/03/2022
BISPLISSUEDPRECISION PLBG SVCS., INC02/03/2012
BISOTISSUEDAIRITAN CONSTR CORP02/02/2012
2 projects · most recent 05/11/2026
General Wiring
FiledStatusContractorScope
05/11/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
09/26/2023CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/28/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/11/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/11/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/08/2026FinalWalid Abdullaprogress
05/08/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/08/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/01/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/01/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/01/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/01/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/01/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
04/27/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
04/27/2022FinalFAHAD FATEHprogress
04/27/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00727037-I1Request digital key ↗
08/24/2026Q00727051-P1Request digital key ↗
08/24/2026Q00727051-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION3
02/07/2012420525667Open ↗
02/03/2012420525667Open ↗
02/03/2012420525667Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/05/2024420525667Open ↗
01/24/2012420525667Open ↗
▸BISIntent to Revoke Approval/Permit1
11/15/2013420525667Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/12/2012420525667Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026Q01399392-I1Open ↗
08/13/2026Q00727051-P1Open ↗
08/13/2026Q00727037-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01399392-I1Open ↗
09/02/2026Q01399392-I1Open ↗
09/02/2026Q01399392-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q01399392-I1Open ↗
09/02/2026Q01399392-I1Open ↗
09/01/2026Q00727051-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/12/2012420525667Open ↗
01/24/2012420525667Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/24/2012420525667Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/24/2012420525667Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
02/15/2012420525667Open ↗
▸BISSCHEDULE B - PLUMBING1
01/24/2012420525667Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026Q01399392-I1Open ↗
08/13/2026Q00727037-I1Open ↗
08/13/2026Q00727037-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/24/2012420525667Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY1
01/24/2012420525667Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/12/2012420525667Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/12/2012420525667Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00727037-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/15/2013420525667Open ↗
12/12/2012420525667Open ↗
12/12/2012420525667Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/24/2012420525667Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/13/2012420525667Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/12/2012420525667Open ↗
01/24/2012420525667Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/24/2012420525667Open ↗