← Back
BuildNYC
Elevator apt, semi-fireproof with stores
The Hill
183-03 HILLSIDE AVENUE · BIN 4623287
💬 Discuss this project
2024Year Built
—Stories
D7Building Class
R6AZoning
45,094 sfGross Floor Area
48Units
0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 18303Hillsideave · 13,200 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCiampa Management CORP.Under Construction78p · 6 filings · 20 docs
BulkheadCiampa Management CORP.4p · 3 filings · 20 docs
Floor 7Ciampa Management CORP.67p · 5 filings · 20 docs
Floor 6Ciampa Management CORP.65p · 5 filings · 20 docs
Floor 5Ciampa Management CORP.64p · 4 filings · 20 docs
Floor 4Ciampa Management CORP.61p · 4 filings · 20 docs
Floor 3Ciampa Management CORP.61p · 4 filings · 20 docs
Floor 2Ciampa Management CORP.64p · 4 filings · 20 docs
Floor 1Ciampa Management CORP.67p · 6 filings · 20 docs
CellarPiermont58p · 5 filings · 20 docs
Site & exteriorPiermont PropertiesUnder Construction40p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Piermont Properties2807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/19/2023$5.2M—183-03 HILLSIDE PARTNERS LLC → 18303HILLSIDEAVE LLC— not available
10/15/2019$4.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Marin Architects1502/03/2026
Tohfaz Uddin PE1812/02/2025
Dominick R. Pilla Associates210/14/2025
Stavros I. Malliaros, P.E212/03/2024
Iaq Systems109/25/2024
Ancora Engineering203/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
Spring Scaffolding3203/21/2026
Marin Architects303/21/2026
KM Associates of New York1203/21/2026
Bay Restoration403/21/2026
K & M Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2810/16/2026
Maccarone PlumbingFire Protection707/08/2026
Pav-Lak ContractingScaffold607/08/2026
Pav-Lak ContractingGeneral Contractor607/08/2026
Maccarone PlumbingPlumbing407/08/2026
Racanelli Construction CoScaffold107/08/2026
Bay RestorationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843610/14/2025
HRF Services5616412/03/2024
Ancora Engineering6818203/18/2024
Building Lifecycle
All (188)Filed (42)Permit Issued (44)Signed Off (13)Violation (4)Inspection (16)Objection (36)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
10/15/2026
Permit issued — Protection and Mechanical Methods
Q00914180-S2-PMM
10/15/2026
Permit issued — Construction Fence
Q00914180-S1-FN
05/11/2026
Signed off — Alteration
ALTERATION TYPE 3 - INSTALL SUPPORTED PIPE SCAFFOLDING AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q01099676-I1
05/11/2026
Signed off — Alteration
OUTRIGGER SUSPENDED SCAFFOLDING FOR FACADE AND MASONRY WORK
Q01108855-I1
05/11/2026
Permit issued — Suspended Scaffold
Q01108855-I1-SC
04/29/2026
Signed off — Alteration
installation of new SP/SD system filed in conjunction with NB application#421684868. No change to use, egress or occupancy.
Q00355402-I1
04/29/2026
Signed off — Alteration
Q00713979-I1
04/27/2026
Signed off — Alteration
Mechanical duct work and related fixtures filed in conjunction with NB application #421684868. No change in use, egress or occupancy.
Q00355489-I1
04/16/2026
Signed off — Alteration
Filed herewith Pressurized temporary dry standpipe as per drawings submitted herewith
Q01106933-I1
03/24/2026
Permit issued — Mechanical Systems
Q00355489-I1-MS
02/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
02/03/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING NUMBER 421684868. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00355449-P4
02/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/28/2026
Permit issued — Mechanical Systems
Q00355489-I1-MS
01/27/2026
Permit issued — Construction Fence
Q00713979-I1-FN
12/19/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/10/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/08/2025
Permit issued — Plumbing
Q00355449-I1-PL
12/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00914180-A1
12/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00914180-A2
11/22/2025
Special inspection requirement — HVAC insulation and sealing
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Final
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — HVAC and service water heating system controls
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
11/22/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
11/07/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING NUMBER 421684868. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00355449-P3
11/06/2025
Filed — Alteration
Mechanical duct work and related fixtures filed in conjunction with NB application #421684868. No change in use, egress or occupancy.
Q00355489-P2
11/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00914180-I1
10/31/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00914180-S4
10/31/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
10/21/2025
Signed off — Alteration
Structural work in conjunction with NB application number
Q00353762-I1
10/15/2025
Permit issued — Sidewalk Shed
Q00914180-I1-SH
10/15/2025
Permit issued — Construction Fence
Q00914180-S1-FN
10/15/2025
Permit issued — Protection and Mechanical Methods
Q00914180-S4-PMM
10/15/2025
Permit issued — Protection and Mechanical Methods
Q00914180-S2-PMM
10/14/2025
Filed — Alteration
Structural work in conjunction with NB application number
Q00353762-P2
10/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00914180-S3
10/06/2025
Signed off — Alteration
Q00355376-I1
09/18/2025
Special inspection requirement — Final
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — HVAC insulation and sealing
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — HVAC and service water heating system controls
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding10/15/2026
DOB NOWConstruction FencePermit IssuedSpring Scaffolding10/15/2026
DOB NOWSuspended ScaffoldSigned-offBay Restoration05/11/2026
DOB NOWMechanical SystemsSigned-offPav-Lak Contracting03/24/2026
DOB NOWMechanical SystemsSigned-offPav-Lak Contracting01/28/2026
DOB NOWConstruction FenceSigned-offPav-Lak Contracting01/27/2026
DOB NOWPlumbingSigned-offMaccarone Plumbing12/08/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding10/15/2025
DOB NOWConstruction FencePermit IssuedSpring Scaffolding10/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding10/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding10/15/2025
DOB NOWStructuralSigned-offPav-Lak Contracting06/10/2025
DOB NOWConstruction FenceSigned-offPav-Lak Contracting05/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/22/2025
DOB NOWSprinklersSigned-offMaccarone Plumbing05/09/2025
DOB NOWStandpipeSigned-offMaccarone Plumbing05/09/2025
DOB NOWStandpipeSigned-offMaccarone Plumbing03/28/2025
DOB NOWMechanical SystemsSigned-offPav-Lak Contracting03/25/2025
DOB NOWPlumbingSigned-offMaccarone Plumbing11/25/2024
DOB NOWConstruction FencePermit IssuedSpring Scaffolding10/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding10/25/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding10/25/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding10/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding10/25/2024
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration10/09/2024
DOB NOWSupported ScaffoldSigned-offBay Restoration09/27/2024
DOB NOWSuspended ScaffoldSigned-offBay Restoration09/16/2024
DOB NOWConstruction FenceSigned-offPav-Lak Contracting06/04/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/23/2024
DOB NOWSprinklersSigned-offMaccarone Plumbing05/09/2024
DOB NOWStandpipeSigned-offMaccarone Plumbing05/09/2024
DOB NOWMechanical SystemsSigned-offPav-Lak Contracting04/05/2024
DOB NOWPlumbingSigned-offMaccarone Plumbing03/28/2024
DOB NOWPlumbingSigned-offMaccarone Plumbing03/27/2024
DOB NOWSprinklersSigned-offMaccarone Plumbing02/22/2024
DOB NOWStandpipeSigned-offMaccarone Plumbing02/22/2024
DOB NOWSupport of ExcavationSigned-offPav-Lak Contracting12/27/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding10/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding10/30/2023
DOB NOWConstruction FencePermit IssuedSpring Scaffolding10/30/2023
+ 16 more permits on file
1 project · most recent 08/06/2025
FiledStatusContractorScope
08/06/2025Signed-offMaccarone Plumbing590 heads, 590 outlets
2 projects · most recent 02/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/03/2026Signed-offMaccarone PlumbingGas, Storm, Water/Sanitary
08/06/2025———
6 projects · most recent 03/21/2026
General Wiring
FiledStatusContractorScope
03/21/2026CompleteS & D Electric NYGeneral Wiring
11/08/2024CompleteTuxedo Electrical Contracting—
10/02/2024CompleteTop Shelf Electric—
05/05/2024CompleteS & D Electric NY—
10/03/2023CompleteTop Shelf Electric—
08/22/2023CompleteS & D Electric NY1 meters, 1 new_meters
2 projects · most recent 12/02/2025
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
12/02/2025Permit IssuedSpring ScaffoldingFence, Sidewalk Shed
12/03/2024Signed-offBay RestorationScaffold
1 project · most recent 09/27/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
09/27/2024Signed-offBay RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
12/19/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/10/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/22/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/01/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
02/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
02/19/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
02/02/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/22/2025HVAC insulation and sealing JOHN MCMONAGLEenergy_progress
11/22/2025HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
11/22/2025FinalJOHN MCMONAGLEprogress
11/22/2025HVAC and service water heating system controls JOHN MCMONAGLEenergy_progress
11/22/2025Shutoff dampersJOHN MCMONAGLEenergy_progress
11/22/2025Maintenance informationJOHN MCMONAGLEenergy_progress
11/22/2025Heating SystemsJOHN MCMONAGLEspecial
11/22/2025Mechanical SystemsJOHN MCMONAGLEspecial
11/22/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/22/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
09/18/2025FinalJOHN MCMONAGLEprogress
09/18/2025HVAC insulation and sealing JOHN MCMONAGLEenergy_progress
09/18/2025HVAC and service water heating system controls JOHN MCMONAGLEenergy_progress
09/18/2025Shutoff dampersJOHN MCMONAGLEenergy_progress
09/18/2025Maintenance informationJOHN MCMONAGLEenergy_progress
09/18/2025HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
09/18/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/18/2025Heating SystemsJOHN MCMONAGLEspecial
09/18/2025Mechanical SystemsJOHN MCMONAGLEspecial
09/18/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/31/2025Sprinkler SystemsJOHN MCMONAGLEspecial
Latest 25 of 57.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PiermontUnknownCellar
Project Q00355376 Alteration · LOC Issued · 06/23/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch26
08/26/2026Q00713979-I1Request digital key ↗
08/24/2026Q00879277-I1Request digital key ↗
08/22/2026Q00914180-S2Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/28/2026Q00355376-I1Request digital key ↗
08/17/2026Q00355449-P4Request digital key ↗
08/17/2026Q00355449-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/19/2026Q00355402-P1Request digital key ↗
08/19/2026Q00355402-P2Request digital key ↗
08/19/2026Q00355402-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
08/19/2026Q00355402-P2Request digital key ↗
08/19/2026Q00355402-P3Request digital key ↗
08/19/2026Q00355402-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/21/2026Q00355489-I1Request digital key ↗
08/21/2026Q00355489-P2Request digital key ↗
08/21/2026Q00355489-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/18/2026Q00353762-I1Request digital key ↗
08/15/2026Q00353762-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00356934-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
02/19/2026440598863Open ↗
12/28/2023440598863Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/08/2020440598863Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/28/2026Q00356934-I1Open ↗
08/28/2026Q00355376-I1Open ↗
08/24/2026Q00879277-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026Q00879277-I1Open ↗
09/02/2026Q00355489-I1Open ↗
08/31/2026Q00879277-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00355489-I1Open ↗
09/02/2026Q00355489-I1Open ↗
08/25/2026Q00355489-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/14/2020440598863Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/14/2020440598863Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed13
08/24/2026Q00879277-I1Open ↗
08/17/2026Q00355449-P3Open ↗
08/17/2026Q00355449-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026Q00879277-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026Q00355489-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/08/2020440598863Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/08/2020440598863Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/22/2024440598863Open ↗
09/08/2020440598863Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/14/2020440598863Open ↗
▸Other Documents6
▸DOB NOWCalculations2
08/13/2026Q01108855-P1Open ↗
08/13/2026Q01108855-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026Q01108855-I1Open ↗
08/13/2026Q01108855-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/08/2020440598863Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00879277-I1Open ↗