← Back
Two stories - detached, small or mid-size
183-18 DALNY ROAD
QUEENS · BIN 4213205
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
2,008 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: MARILYN CHAPOTEAU TRUST · 8,550 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC205/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272205/19/2026
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Signed Off (2)Special Inspection (10)
07/29/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01403708-I1
05/26/2026
Permit issued — Solar
Q01403708-I1-SL
05/19/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01403708-I1
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/19/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/18/2026
Special inspection requirement — Final
Walid Abdulla
02/11/2026
Signed off — Alteration
Q01267345-I1
08/22/2025
Permit issued — Solar
Q01267345-I1-SL
08/15/2025
Filed — Alteration
Q01267345-I1
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/06/2025
Special inspection requirement — Final
Walid Abdulla
08/06/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/26/2026
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/22/2025
2 projects · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026CompleteSUNRUN SOLAR ELECTL CORP—
08/15/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026Signed-offSUNRUN INSTALLATION SVC5 panels, 3.3 kw, 336.48 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/19/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/19/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/18/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/18/2026FinalWalid Abdullaprogress
08/06/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/06/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/06/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/06/2025FinalWalid Abdullaprogress
08/06/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01267345-I1Request digital key ↗
08/16/2026Q01403708-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01267345-I1Open ↗
09/01/2026Q01267345-I1Open ↗
09/01/2026Q01267345-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01267345-I1Open ↗
09/01/2026Q01267345-I1Open ↗
08/25/2026Q01403708-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01267345-I1Open ↗
08/16/2026Q01403708-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026Q01267345-I1Open ↗
08/16/2026Q01403708-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWUtility Company Final Acceptance Letter2
08/16/2026Q01403708-I1Open ↗
08/13/2026Q01267345-I1Open ↗