183-37 ELMIRA AVENUE
QUEENS · St. Albans · BIN 4220453
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R2Zoning
1,260 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 15 docs
Floor 11 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kojo Simpson Architect208/01/2025
Building Lifecycle
03/31/2026
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
09/03/2025
Objection resolved — Addressed
08/28/2025
Objection raised — Energy
08/01/2025
Filed — Alteration CO
Proposed alteration to convert an existing one story and attic building to a two story & one family residential use building.
Q01242150-S1
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 08/01/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/01/2025——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 10/12/2026
General Wiring
FiledStatusContractorScope
10/12/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/31/2025Lighting in dwelling units—energy_progress
07/31/2025Fire-Resistant Penetrations and Joints—special
07/31/2025Fire-Resistance Rated Construction—progress
07/31/2025Fenestration areas—energy_progress
07/31/2025Insulation placement and R values—energy_progress
07/31/2025Fenestration air leakage—energy_progress
07/31/2025Fenestration and door U-factor and product ratings—energy_progress
07/31/2025Air barrier - visual inspection—energy_progress
07/31/2025Energy Code Compliance Inspections—progress
06/19/2025HVAC-R and service water piping design and insulation—energy_progress
06/19/2025HVAC-R and service water heating system controls—energy_progress
06/19/2025HVAC-R and service water heating equipment—energy_progress
06/19/2025Structural Stability – Alterations of existing buildings—special
06/16/2025Mechanical Systems—special
06/16/2025Final—progress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account