← Back
Multi-story retail building (2+)
183 BOWERY
MANHATTAN · BIN 1005673
💬 Discuss this project
1950Year Built
2Stories
K2Building Class
C6-1Zoning
7,038 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: CHAN & FUNG'S RTY CO,INC · 2,348 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof1p · 1 filing · 6 docs
Floor 211p · 3 filings · 20 docs
Floor 111p · 3 filings · 20 docs
Cellar14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHAN & FUNG'S RTY CO INC103/22/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ISSA KHORASANCHI P.E.1005/30/2026
ARQUITECTURA VARELA206/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALLCITYEXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VERA FORMA LLCGeneral Contractor707/08/2026
ASN CONST & RENOV INCGeneral Contractor307/08/2026
TRISTAR PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252505/30/2026
Building Lifecycle
All (64)Filed (12)Permit Issued (6)Signed Off (3)Violation (2)Inspection (7)Objection (4)Special Inspection (30)
06/17/2026
Objection resolved — Addressed
06/05/2026
Objection raised — Fire_Protection
05/30/2026
Filed — Alteration
INSTALL ONE 10 TON ROOF TOP PACKAGED AC UNIT AND AND A 5 TON HEAT PUMP AS SHOWN ON PLANS.
M01409068-I1
05/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
ISSA KHORASANCHI
05/29/2026
Special inspection requirement — Maintenance information
ISSA KHORASANCHI
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
ISSA KHORASANCHI
05/29/2026
Special inspection requirement — Final
ISSA KHORASANCHI
05/29/2026
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
11/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/09/2025
Violation issued (ECB, open)
Construction
09/01/2025
Filed — No Work
M01202182-P2
09/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Lighting controls
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Interior lighting power
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Insulation placement and R values
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Fenestration air leakage
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Fenestration areas
ISSA KHORASANCHI
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2025
Filed — Alteration CO
INTERIOR WORK FOR A NEW DRINKING ESTABLISHMENT.
M01083458-P5
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/16/2025
Special inspection requirement — Fenestration air leakage
ISSA KHORASANCHI
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ISSA KHORASANCHI
07/16/2025
Special inspection requirement — Lighting controls
ISSA KHORASANCHI
07/16/2025
Special inspection requirement — Fenestration areas
ISSA KHORASANCHI
07/16/2025
Special inspection requirement — Insulation placement and R values
ISSA KHORASANCHI
07/16/2025
Special inspection requirement — Interior lighting power
ISSA KHORASANCHI
07/09/2025
Signed off — Alteration
M01139797-I1
06/02/2025
Signed off — Alteration
REMOVE NON LOAD BEARING PARTITION WALLS AND FINISHES FROM CELLAR, 1ST. AND SECOND FLOOR.
M01068351-I1
05/31/2025
Signed off — Alteration CO
INTERIOR WORK FOR A NEW DRINKING ESTABLISHMENT.
M01083458-S1
05/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2025
Filed — Alteration CO
INTERIOR WORK FOR A NEW DRINKING ESTABLISHMENT.
M01083458-P2
04/09/2025
Filed — No Work
M01202182-I1
04/09/2025
Special inspection requirement — Fenestration areas
ISSA KHORASANCHI
04/09/2025
Special inspection requirement — Fenestration air leakage
ISSA KHORASANCHI
04/09/2025
Special inspection requirement — Insulation placement and R values
ISSA KHORASANCHI
04/09/2025
Special inspection requirement — Lighting controls
ISSA KHORASANCHI
04/09/2025
Special inspection requirement — Interior lighting power
ISSA KHORASANCHI
04/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ISSA KHORASANCHI
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/21/2024
Filed — Alteration CO
INTERIOR WORK FOR A NEW DRINKING ESTABLISHMENT.
M01083458-P1
11/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ISSA KHORASANCHI
11/20/2024
Permit issued — Mechanical Systems
M01139797-I1-MS
11/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ISSA KHORASANCHI
11/11/2024
Filed — Alteration
M01139797-I1
11/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
ISSA KHORASANCHI
09/06/2024
Permit issued — Plumbing
M01083458-S1-PL
09/05/2024
Filed — Alteration CO
INTERIOR WORK FOR A NEW DRINKING ESTABLISHMENT.
M01083458-S1
08/15/2024
Permit issued — General Construction
M01083458-I1-GC
08/01/2024
Objection raised — Scope
08/01/2024
Objection resolved — Addressed
07/23/2024
Filed — Alteration CO
INTERIOR WORK FOR A NEW DRINKING ESTABLISHMENT.
M01083458-I1
06/27/2024
Permit issued — General Construction
M01068351-I1-GC
06/24/2024
Filed — Alteration
REMOVE NON LOAD BEARING PARTITION WALLS AND FINISHES FROM CELLAR, 1ST. AND SECOND FLOOR.
M01068351-I1
06/22/2022
Filed — Alteration
HEREWITH FILING TO ADD NEW GLASS STOREFRONT AS PER PLANS. EXISTING GLASS WINDOWS TO REMAIN. NO CHANGE OF USE, EGRESS OR OCCUPANCY THIS APPLICATION.
M00677795-P1
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVERA FORMA LLC11/20/2024
DOB NOWPlumbingSigned-offTRISTAR PLUMBING & HTG IN09/06/2024
DOB NOWGeneral ConstructionPermit IssuedVERA FORMA LLC08/15/2024
DOB NOWGeneral ConstructionSigned-offVERA FORMA LLC06/27/2024
DOB NOWGeneral ConstructionPermit IssuedASN CONST RENOV06/15/2022
DOB NOWGeneral ConstructionPermit IssuedASN CONST RENOV03/07/2022
BISPLISSUEDCHINATOWN PLBG & HTG INC12/02/1996
BIS—ISSUEDLEEMAN GENERAL CONTRACTOR10/10/1996
BISEQISSUEDLEEMAN GENERAL CONTRACTOR10/10/1996
1 project · most recent 05/30/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/30/2026——Air Conditioning Systems
Cooling
Arcoaire RGV-120 120 BTU · Rooftop Unit ×1
Mitsubishi Electric MXZ-SM60NAM2 60 BTU · Heat Pump Outdoor ×1
1 project · most recent 07/16/2025
Water/Sanitary
FiledStatusContractorScope
07/16/2025Signed-offTRISTAR PLUMBING & HTG INWater/Sanitary
1 project · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteJTE ELECTRICAL SERVICESGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
05/29/2026HVAC-R and service water heating system controlsISSA KHORASANCHIenergy_progress
05/29/2026Maintenance informationISSA KHORASANCHIenergy_progress
05/29/2026Energy Code Compliance InspectionsISSA KHORASANCHIprogress
05/29/2026FinalISSA KHORASANCHIprogress
05/29/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
09/01/2025Public Assembly Emergency LightingISSA KHORASANCHIprogress
07/28/2025Lighting controlsISSA KHORASANCHIenergy_progress
07/28/2025Interior lighting powerISSA KHORASANCHIenergy_progress
07/28/2025Insulation placement and R valuesISSA KHORASANCHIenergy_progress
07/28/2025Fenestration air leakageISSA KHORASANCHIenergy_progress
07/28/2025Fenestration and door U-factor and product ratingsISSA KHORASANCHIenergy_progress
07/28/2025Fenestration areasISSA KHORASANCHIenergy_progress
07/28/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/16/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/16/2025Fenestration air leakageISSA KHORASANCHIenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsISSA KHORASANCHIenergy_progress
07/16/2025Lighting controlsISSA KHORASANCHIenergy_progress
07/16/2025Fenestration areasISSA KHORASANCHIenergy_progress
07/16/2025Insulation placement and R valuesISSA KHORASANCHIenergy_progress
07/16/2025Interior lighting powerISSA KHORASANCHIenergy_progress
04/09/2025Fenestration areasISSA KHORASANCHIenergy_progress
04/09/2025Fenestration air leakageISSA KHORASANCHIenergy_progress
04/09/2025Insulation placement and R valuesISSA KHORASANCHIenergy_progress
04/09/2025Lighting controlsISSA KHORASANCHIenergy_progress
04/09/2025Interior lighting powerISSA KHORASANCHIenergy_progress
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ripple RoomRestaurant / Food ServiceFloors 1, 2
Project M01202182 No Work · PA Certificate of Operation Issued · 04/09/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/02/2026M00677795-I1Request digital key ↗
09/02/2026M00677795-P1Request digital key ↗
08/27/2026M01068351-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026M01202182-P2Request digital key ↗
08/24/2026M01202182-I1Request digital key ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature30
09/29/2026M01202182-P2Open ↗
09/28/2026M01083458-I1Open ↗
09/28/2026M01083458-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00677795-I1Open ↗
08/24/2026M01083458-S1Open ↗
08/24/2026M01083458-P5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026M01083458-I1Open ↗
09/01/2026M01083458-P5Open ↗
08/28/2026M01139797-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026M01083458-P2Open ↗
08/13/2026M01083458-P5Open ↗
08/13/2026M01083458-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026M01083458-P5Open ↗
08/24/2026M01083458-P2Open ↗
08/24/2026M01083458-P1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/24/2026M01083458-P5Open ↗
08/24/2026M01083458-P2Open ↗
08/24/2026M01083458-I1Open ↗