← Back
BuildNYC
Two family converted from one family
183 FOUNTAIN AVENUE
BROOKLYN · BIN 3094606
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R5BZoning
1,188 sfGross Floor Area
2Units
8 Active Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential solar electric generation array installation1 filing · 4 docs
Cellar5p · 1 filing · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/02/2023$725K—Private party → Private party$610/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Momentum Solar104/27/2026
RLD3 Engineering306/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arcometric Design603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BascombeGeneral Contractor207/08/2026
Village P & H NYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281104/27/2026
Age Engineering6695205/23/2025
Building Lifecycle
08/11/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
B01393356-I1
05/26/2026
Signed off — Alteration
Miscellaneous plumbing work for a three-piece bathroom in the cellar as per plan. There has been no change of use, egress, or occupancy.
B01116141-I1
05/26/2026
Signed off — Alteration
Miscellaneous plumbing work for a three-piece bathroom in the cellar as per plan. There has been no change of use, egress, or occupancy.
B01116141-S1
05/22/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/21/2026
Permit renewed — General Construction
Renewed without changes
B01116141-I1-GC
31 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBascombe05/21/2026
DOB NOWSolarSigned-offMomentum Solar04/30/2026
DOB NOWPlumbingSigned-offVillage P & H NY08/27/2025
DOB NOWGeneral ConstructionSigned-offBascombe07/29/2025
2 projects · most recent 04/27/2026
General Wiring
FiledStatusContractorScope
04/27/2026CompleteIsland Electric—
09/29/2023CompleteV A ElectricGeneral Wiring
1 project · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026Signed-offMomentum Solar—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/22/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/03/2025Fire-Resistant Penetrations and Joints—special
06/03/2025Energy Code Compliance Inspections—progress
06/03/2025Lighting in dwelling units—energy_progress
05/23/2025HVAC-R and service water piping design and insulationROBESPIERRE ARISTILDEenergy_progress
04/13/2025Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
04/13/2025Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
19 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account