DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB06/08/2026REISSUE:35691949J DATE OF ISSUE:05.01.25 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR THROUGHT THERE IS SIGNS OF WATER PENETRATION DUE TO POROUS WNothing owed — awaiting certificate of correction
ECB06/08/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED FPSC DOORS ARE NOT SELF CLOSING PROPERLY FOR DIFECTIVE HARDWARE,DOOR CLOSURE OR HINGS AT 4TH FLOOR STAIRWAY B 5Nothing owed — awaiting certificate of correction
ECB06/08/2026REISSUE#35717326X DATE OF ISSUE:05.01.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION OBSERVNothing owed — awaiting certificate of correction
ECB06/08/2026REISSUE#35691948H DATE OF ISSUE:05.01.25 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT ROOF TOP BULKHEAD STAIR CASE D OUTSIDE METAL FLASHING IS MISSING ANNothing owed — awaiting certificate of correction
ECB06/02/2025RE-ISSUE #35672652J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CELLAR THROUGHOUT THERE IS SIGNS OF WATER PENETRATION DUE TO POROUS WALL, WHICH INCLUDES THE ELECTRICAL AND GAS METER ROOMS.Nothing owed — awaiting certificate of correction
ECB06/02/2025RE-ISSUE #35672695P. NOTED: AT ROOF TOP BULKHEAD STAIR CASE D OUTSIDE METAL FLASHING IS MISSING AND IS EXPOSING THE WOOD SHEATHING. REMEDY: REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB06/02/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: IN THE GYMNASIUM TWO LIGHTS ON THE THIRD FLOOR NEXTM TO EXIT D TNothing owed — awaiting certificate of correction
ECB05/23/2024REISSUE #35672692J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT CELLAR LEVEL HAS BECOME POROUS ALLOWING THE RAIN WATER THROUGHOUT THE CELLAR AT GAS AND ELECTRICNothing owed — awaiting certificate of correction
ECB04/14/2023REISSUE#35650986H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FOUNDATION WALL AT CELLAR LEVEL HAS BECOME POROUS ALLOWING THERAIN WATER THROUGHOUT THE CELLAR INCLUDING ELECTRICAL,GAS METER ROOM.RNothing owed — awaiting certificate of correction
ECB04/28/2022RE-ISSUED #35560694R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT CELLAR LEVEL THROUGHOUT FOUNDATION WALLS DAMAGED DUE TO WATER PENETRATION FROM OUTSIDE.REMEDY:REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB04/26/2021REISSUE35495101Y NOTED:@CELLAR LEVEL ELECTRICAL,GAS&BOILERRM:FOUNDATION WALL HAS BECOME POROUS&IS ALLOWING WATER TO ENTER RMS IN VARIOUS AREAS THRUOUT.REPAIR &/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB04/22/2020RE-ISSUE#35414678L FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.NOTED:IN THE CELLAR HAS METER AND ELECTRICAL ROOMS THE FOUNDATION WALL IS POROUS.REM:MAINTAIN EXTERIOR BUILDING WALL.Nothing owed — awaiting certificate of correction
ECB06/12/2019FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES NOTED AT GAS METER ROOM ELECTRICAL CLOSET FOUNDATION WALL ARE POROUS ALLOWING RAIN WATER TO COME IN TO ROOM. REISSUE 353253325. REMEDY:REPAIR AND ORNothing owed — awaiting certificate of correction
ECB03/19/2018FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT ELECTRICAL METER ROOM,FOUNDATION WALL HAS BECOME POROUS ALLOWING THE RAIN WATER IN TO THE ELECTRICAL ROOM ALONG THE RIVERDALE AVE SIDE. REMEDY: MAINTAINothing owed — awaiting certificate of correction
ECB03/19/2018FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AT GAS METER ROOM,FOUNDATION WALL HAS BECOME POROUS ALLOWING THE RAIN WATER IN TO TYHE GAS METER ROOM ALONG THE PLAYGROUND SIDE(BACK OF THE BLDG.).Nothing owed — awaiting certificate of correction