← Back
Over six families without stores
183 THOMPSON STREET
MANHATTAN · BIN 1008249
💬 Discuss this project
1908Year Built
7Stories
C1Building Class
R7-2Zoning
28,623 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized142 Open Violations 137 unresolved · 5 paperwork only ▸FISP: UNSAFE
Over six families without stores · Owner of record: TOM SULLIVAN LLC · 5,708 sf lot · 5.01 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 5 docs
Bulkhead1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1107/08/2026
STEEL CONSTRUCTION407/08/2026
15TH ASSOCIATES1507/08/2026
KINGS GROUP NY404/09/2026
SULLIVAN103/22/2026
ST. 183 ASSOCIATES103/22/2026
TOM SULLIVAN REALTY403/21/2026
TWIN PARK EQUITES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP207/02/2025
LU ENGINEERING SERVICE PC306/16/2025
MJE PROFESSIONAL SERVICES103/11/2024
MERRITT ENGINEERING CONSULTANTS, DPC108/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY603/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
GREEN STUDIO203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor1107/08/2026
HENG TAI CONSTRUCTION INCGeneral Contractor303/21/2026
FAMOUS RESTORATION INCGeneral Contractor307/08/2026
WING TAI CONSTRUCTION INCGeneral Contractor303/21/2026
KINGS GROUP NY CORPGeneral Contractor104/09/2026
STEEL CONSTRUCTION LLCGeneral Contractor107/08/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LU ENGINEERING SERVICE PC6575306/16/2025
AA BUILDING & INSPECTION1519108/21/2023
BUTTERFIELD & O'CONNOR4189108/21/2023
MERRITT ENGINEERING CONSU460108/21/2023
Building Lifecycle
All (124)Filed (9)Permit Issued (16)Signed Off (5)Facade (FISP) (24)Violation (60)Inspection (6)Special Inspection (4)
08/26/2026
Signed off — Alteration
FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, STONE PATCHING, & PARAPET RECONSTRUCTION.THE SCOPE OF WORK ALSO INCLUDE CAULKING, WINDOW SILL, LINTEL, BULKHEAD ROOF, BULKHEAD SKYLIGH REPLACEMENT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00922018-I1
07/20/2026
Violation issued (HPD, open)
C
06/01/2026
Cycle 9 facade report signed — UNSAFE
05/19/2026
Cycle 9 facade report submitted
05/11/2026
Cycle 9 facade inspection completed
04/23/2026
Violation issued (ECB, open)
Construction
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Permit issued — Sidewalk Shed
M00677805-I1-SH
12/08/2025
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01241794-I1
11/18/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF APT. #D8 ON 4TH FLOOR. WITH REPAIRING FLOORING, CEILING, PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01230594-I1
11/18/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF APT. #D8 ON 4TH FLOOR. WITH REPAIRING FLOORING, CEILING, PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01230594-S1
11/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/12/2025
Permit issued — General Construction
M00922018-I1-GC
10/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Violation issued (HPD, closed)
B
08/28/2025
Permit issued — Plumbing
M01230594-S1-PL
07/09/2025
Violation issued (HPD, closed)
B
07/09/2025
Violation issued (HPD, closed)
C
07/02/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01241794-I1
07/02/2025
Permit issued — Sidewalk Shed
M01241794-I1-SH
06/20/2025
Permit issued — General Construction
M01230594-I1-GC
06/16/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF APT. #D8 ON 4TH FLOOR. WITH REPAIRING FLOORING, CEILING, PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01230594-S1
06/02/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF APT. #D8 ON 4TH FLOOR. WITH REPAIRING FLOORING, CEILING, PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01230594-I1
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
DONGSHENG LU
05/21/2025
Cycle 9 facade report submitted
05/21/2025
Cycle 9 facade report signed — UNSAFE
05/05/2025
Cycle 9 facade inspection completed
04/10/2025
Permit issued — Suspended Scaffold
M01033019-I1-SC
01/21/2025
Permit issued — Sidewalk Shed
M00677805-I1-SH
11/04/2024
Permit issued — General Construction
M00922018-I1-GC
10/09/2024
Violation issued (HPD, closed)
C
10/09/2024
Violation issued (HPD, closed)
C
10/09/2024
Violation issued (HPD, closed)
C
09/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2024
Violation issued (HPD, closed)
C
06/13/2024
Cycle 9 facade report signed — UNSAFE
05/09/2024
Cycle 9 facade report submitted
05/06/2024
Cycle 9 facade inspection completed
04/25/2024
Permit issued — Suspended Scaffold
M01033019-P1-SC
04/25/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
BRIAN T. O'CONNOR
04/15/2024
Violation issued (HPD, closed)
C
04/10/2024
Filed — Alteration
renew application.
M01033019-P1
04/10/2024
Permit issued — Suspended Scaffold
M01033019-I1-SC
04/10/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
BRIAN T. O'CONNOR
04/09/2024
Filed — Alteration
renew application.
M01033019-I1
03/15/2024
Permit issued — Sidewalk Shed
M01018014-I1-SH
03/11/2024
Filed — Alteration
M01018014-I1
02/07/2024
Violation issued (HPD, closed)
C
01/26/2024
Permit issued — Sidewalk Shed
M00677805-I1-SH
11/01/2023
Permit issued — General Construction
M00922018-I1-GC
08/21/2023
Filed — Alteration
FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, STONE PATCHING, & PARAPET RECONSTRUCTION.THE SCOPE OF WORK ALSO INCLUDE CAULKING, WINDOW SILL, LINTEL, BULKHEAD ROOF, BULKHEAD SKYLIGH REPLACEMENT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00922018-I1
05/11/2023
Cycle 9 facade report submitted
05/10/2023
Cycle 9 facade inspection completed
05/10/2023
Cycle 9 facade report signed — UNSAFE
02/14/2023
Permit issued — Sidewalk Shed
M00677805-I1-SH
11/21/2022
Violation issued (HPD, open)
C
11/17/2022
Violation issued (HPD, closed)
C
07/22/2022
Violation issued (ECB, open)
Construction
05/18/2022
Violation issued (HPD, closed)
B
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/12/2026
DOB NOWGeneral ConstructionSigned-offSE ENERGY11/12/2025
DOB NOWPlumbingSigned-offS & L PLUMBING INC08/28/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/02/2025
DOB NOWGeneral ConstructionSigned-offWING TAI CONSTRUCTION INC06/20/2025
DOB NOWSuspended ScaffoldPermit IssuedFAMOUS RESTORATION INC04/10/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/21/2025
DOB NOWGeneral ConstructionSigned-offSE ENERGY11/04/2024
DOB NOWSuspended ScaffoldPermit IssuedFAMOUS RESTORATION INC04/25/2024
DOB NOWSuspended ScaffoldPermit IssuedFAMOUS RESTORATION INC04/10/2024
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC03/15/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/26/2024
DOB NOWGeneral ConstructionSigned-offSE ENERGY11/01/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/14/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/28/2022
DOB NOWGeneral ConstructionSigned-offHENG TAI CONSTRUCTION INC09/13/2021
BISOTISSUEDHENG TAI CONSTRUCTION INC03/04/2019
BISOTISSUEDHUA TAI CONSTRUCTION INC10/06/2017
BISOTISSUEDHUA TAI CONSTRUCTION INC07/21/2017
BISOTISSUEDHUA TAI CONSTRUCTION INC06/24/2016
BISOTISSUEDYAN TAI CONSTRUCTION INC01/29/2014
BISOTISSUEDPHENIX INNOVATION INC05/02/2013
BISOTISSUEDYAN TAI CONSTRUCTION INC11/30/2012
BISOTISSUEDYAN TAI CONSTRUCTION INC09/27/2012
BISOTISSUEDYAN TAI CONSTRUCTION INC04/11/2012
BISOTISSUEDYAN TAI CONSTRUCTION INC05/04/2010
BISOTISSUEDHOY TAI CONSTRUCTION07/11/2008
BISOTISSUEDHOY TAI CONSTRUCTION06/17/2008
BISOTISSUEDHOY TAI CONSTRUCTION INC08/01/2006
BISOTISSUEDHOI TAI CONSTRUCTIONINC07/10/2006
BISOTISSUEDHOI TAI CONSTRUCTIONINC06/27/2006
BISOTISSUEDHOY TALCONSTRUCTION INC.07/29/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP10/17/2003
4 projects · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025CompleteKWONG MING ELECTRIC INCGeneral Wiring
07/02/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
03/11/2024Permit IssuedRICHARD NEU—
02/10/2022Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 04/10/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/10/2024Permit IssuedFAMOUS RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2021Pass-Final General Construction Non-Directive 14PassView ↗
11/16/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/28/2025Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
05/28/2025Tenant Protection Plan ComplianceDONGSHENG LUspecial
04/25/2024Alternative Materials - OTCR Buildings Bulletin NumberBRIAN T. O'CONNORspecial
04/10/2024Alternative Materials - OTCR Buildings Bulletin NumberBRIAN T. O'CONNORspecial
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00577690-I1Request digital key ↗
09/02/2026M00677805-I1Request digital key ↗
08/29/2026M00922018-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION13
04/01/2019123110757Open ↗
03/26/2019123110757Open ↗
02/19/2019123681827Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION11
03/05/2019123681827Open ↗
10/10/2017123110757Open ↗
07/26/2017123330733Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit4
09/03/2026M00577690-I1Open ↗
08/13/2026M00922018-I1Open ↗
08/13/2026M01230594-S1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
05/03/2019123681827Open ↗
04/01/2019123110757Open ↗
02/19/2019123681827Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
02/19/2019123681827Open ↗
09/20/2017123110757Open ↗
07/28/2017123330733Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00577690-I1Open ↗
09/02/2026M00677805-I1Open ↗
08/29/2026M00922018-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/19/2019123681827Open ↗
09/20/2017123110757Open ↗
07/25/2017123330733Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/03/2013121605815Open ↗
11/30/2012121447087Open ↗
09/28/2012121391528Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026M01230594-I1Open ↗
09/25/2026M01230594-I1Open ↗
08/23/2026M01033019-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/21/2016140511603Open ↗
01/28/2014140157363Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/21/2016140511603Open ↗
01/28/2014140157363Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
02/19/2019123681827Open ↗
09/20/2017123110757Open ↗
07/25/2017123330733Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
02/19/2019123681827Open ↗
09/20/2017123110757Open ↗
07/28/2017123330733Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
03/22/2012121012251Open ↗
06/07/2010120332274Open ↗
06/11/2008110200363Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00577690-I1Open ↗
08/23/2026M01230594-I1Open ↗
08/23/2026M01230594-S1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/29/2026M00922018-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
05/03/2019123681827Open ↗
04/01/2019123110757Open ↗
02/19/2019123681827Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/03/2019123681827Open ↗
04/01/2019123110757Open ↗
02/22/2018123330733Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
04/13/2012121012251Open ↗
03/22/2012121012251Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/21/2016140511603Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/21/2016140511603Open ↗
▸BISNYCECC ANALYSIS1
06/21/2016140511603Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00577690-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/21/2016140511603Open ↗
06/21/2016140511603Open ↗
01/28/2014140157363Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/01/2019123110757Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/03/2019123681827Open ↗
04/01/2019123110757Open ↗
02/22/2018123330733Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL6
02/19/2019123681827Open ↗
02/19/2019123681827Open ↗
10/10/2017123110757Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/03/2013121605815Open ↗
11/30/2012121447087Open ↗
03/22/2012121012251Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/24/2016140511603Open ↗
01/28/2014140157363Open ↗
07/29/2013121012251Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT18
05/03/2019123681827Open ↗
04/01/2019123110757Open ↗
02/19/2019123681827Open ↗
Showing 3 of 18 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
01/28/2014140157363Open ↗
05/03/2013121605815Open ↗
11/30/2012121447087Open ↗
Showing 3 of 4 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
06/24/2016140511603Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET9
02/19/2019123681827Open ↗
09/20/2017123110757Open ↗
07/25/2017123330733Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
05/03/2019123681827Open ↗
04/01/2019123110757Open ↗
03/26/2019123110757Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
03/08/2019123681827Open ↗
01/15/2019123110757Open ↗
07/26/2016140511603Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/21/2016140511603Open ↗
01/28/2014140157363Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/13/2026M01033019-I1Open ↗
08/13/2026M01033019-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01033019-P1Open ↗
08/13/2026M01033019-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00922018-I1Open ↗
▸DOB NOWDHCR Document1