HPD02/04/2020§ 27-2023 ADMIN. CODE: PROVIDE PLACE WITHIN THE BUILDING FOR THE STORAGE OF WASTE RECEPTACLES AND DISINFECT SAME REGULARLY.
HPD02/04/2020§ 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/12/1995VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
ECB02/01/200550A/50B FULTON VT BOILER 15HP NB67663 OIL 1993 50A)IMPROPER ARRANGEMENT OF THE BLOWDOWN VALVES INSTALL A SCREW TYPE(SCOW VAVLES AT THE OUTL ET END OF THE BLOWDOWN LINE 50B)NO DISCHARGE PIPE ON THE SAFETY VALVENothing owed — awaiting certificate of correction
ECB02/01/200550A/50B/6A BURNMAN CR BOILER LP STEAM 50A)SECTION OF FLUE PIPE CORRODED IMMEDIATE REPLACEMENT 6A)SAFETY VALVE DEFECTIVE REPLACE DEVICE 50B)NO DISCHARGE PIPE ON THE SAFETY VALVE.Nothing owed — awaiting certificate of correction
ECB11/28/200016,49.WATER COLUMN DRAIN 2 VALVE TO FIT.2.GAGE GLASS TO FIT WITH STOP VALVE AND RAIN PIPE UNDER NEATHE.3.SUBMIT PROOF OF REGISTERATION FOR THIS BOILER FULTON N.B 67663 YR 1993.Nothing owed — awaiting certificate of correction
Predominantly retail with other uses · 2,000 sf lot · 1.25 FAR built · Flood zone X500