Miscellaneous educational facility
Joseph Loth & Company Silk Ribbon Mill
1820 AMSTERDAM AVENUE · BIN 1062155
💬 Discuss this project
1886Year Built
3.5Stories
W9Building Class
R7AZoning
66,720 sfGross Floor Area
11Units
LL97 Covered14 Open Violations 12 unresolved · 2 paperwork only ▸
Miscellaneous educational facility · Owner of record: 1818-1838 AMSTERDAM AVE. LLC · 19,900 sf lot · 3.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 7 docs
Floor 32p · 1 filing · 7 docs
Floor 23p · 2 filings · 10 docs
Floor 1Under Construction9p · 4 filings · 20 docs
Cellar2p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JJS BUILDERS307/08/2026
UNITED KING CONSTRUCTION407/08/2026
1818-1838 AMSTERDAM AVE7507/08/2026
4 SEASONS CLEANERS103/22/2026
OWNER OF 1820 AMSTERDAM A103/22/2026
OWNER OF 1828 AMSTERDA203/22/2026
1818-1838 AMSTERDAM1103/22/2026
1818 AMSTERDAM AVENUE903/22/2026
1820-1830 AMSTERDAM EQ103/22/2026
182-1830 AMSTERDAM EQU103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DDT ENGINEERING PLLC105/14/2026
AM ARCHITECT P.C.304/10/2026
SERDAR CEYLAN ARCHITECT, PC212/05/2025
NEW YORK ENGINEERS LLC109/15/2020
GREEN DESIGN103/09/2020
ROYAL ENGINEERING, P.C106/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A K EXPEDITING403/21/2026
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IPS PLUMBING CORPPlumbing707/08/2026
UNITED KING CONSTRUCTIONGeneral Contractor407/08/2026
JJS BUILDERSGeneral Contractor107/08/2026
MAXCO CONTRACTING.INCGeneral Contractor107/08/2026
RAFAEL FARIASElectrical103/21/2026
WELLDONE INSPECTIONS INCGeneral Contractor104/09/2026
HT PLUMBING & HEATING CORPlumbing106/27/2026
STOVALL, DARRYLElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637107/09/2025
NEW YORK ENGINEERS, P.C.3868109/15/2020
Building Lifecycle
All (99)Filed (9)Permit Issued (7)Signed Off (1)Violation (60)Inspection (4)Objection (4)Special Inspection (14)
07/31/2026
Signed off — Alteration
PLUMBING WORK IS FILED IN CONJUNCTION WITH CONSTRUCTION JOB #M01322254A PER PLANS SUBMITTED.
M01322290-I1
05/14/2026
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS IN EXISTING OFFICE SPACE AT THE FIRST FLOOR.
M01322254-S2
04/11/2026
Special inspection requirement — Sprinkler Systems
04/10/2026
Filed — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-P1
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Permit issued — Plumbing
M01322290-I1-PL
01/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2026
Permit issued — General Construction
M01322254-I1-GC
12/23/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2025
Objection raised — Admin
12/22/2025
Objection raised — Admin
12/05/2025
Filed — Alteration
PLUMBING WORK IS FILED IN CONJUNCTION WITH CONSTRUCTION JOB #M01322254A PER PLANS SUBMITTED.
M01322290-I1
12/05/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS IN EXISTING OFFICE SPACE AT THE FIRST FLOOR.
M01322254-I1
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Final
SERDAR CEYLAN
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/03/2025
Permit issued — Plumbing
M01229195-S1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Permit issued — Mechanical Systems
M01229195-I1-MS
07/09/2025
Filed — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-I1
07/09/2025
Filed — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-S1
05/20/2025
Special inspection requirement — Mechanical Systems
Robert Truskosky
05/20/2025
Special inspection requirement — Final
Altagracia Martinez
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/09/2022
Violation issued (ECB, open)
Construction
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2020
Violation issued (ECB, closed)
Elevators
10/01/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Filed — Alteration
Replacement of 16 Roof top units & 1 split unit. Installation of 1 new VRF unit for IT room and new kitchen exhaust, makeup air, and kitchen hood for existing pantry equipment. no change to use, egress or occupancy.
M00344827-I1
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2020
Permit issued — Sidewalk Shed
M00329104-I1-SH
04/27/2020
Special inspection requirement — Mechanical Systems
Michael Tobias
04/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
04/27/2020
Special inspection requirement — Heating Systems
Michael Tobias
04/27/2020
Special inspection requirement — Final
03/11/2020
Permit issued — Sidewalk Shed
M00329104-I1-SH
03/09/2020
Filed — Alteration
M00329104-I1
01/29/2020
Violation issued (ECB, closed)
Construction
01/29/2020
Violation issued (ECB, open)
Construction
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/19/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00182328-I1
06/19/2019
Permit issued — Sidewalk Shed
M00182328-I1-SH
11/13/2018
Violation issued (ECB, closed)
Elevators
11/05/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR02/02/2026
DOB NOWGeneral ConstructionPermit IssuedWELLDONE INSPECTIONS INC01/02/2026
DOB NOWPlumbingSigned-offIPS PLUMBING CORP12/03/2025
DOB NOWMechanical SystemsPermit IssuedMAXCO CONTRACTING.INC10/21/2025
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION07/07/2020
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION03/11/2020
DOB NOWSidewalk ShedPermit IssuedJJS BUILDERS06/19/2019
BISSPISSUEDMETRO FIRE PROTECTION INC09/12/2012
BISMHISSUEDEXCEL INTERIOR CONSTRUCTION08/01/2012
BISOTISSUEDEXCEL INTERIOR CONSTRUCTION08/01/2012
BISOTISSUEDBETANCOURT PRO. MGMT.CORP04/23/2012
BISPLISSUEDTHE PLUMBING COMPANY INC12/30/2011
BISPLISSUEDTHE PLUMBING COMPANY INC12/20/2011
BISPLISSUEDPRIME PIPING & HEATING IN09/27/2011
BISPLISSUEDPRIME PIPING & HEATING IN09/27/2011
BISPLISSUEDTRISTATE PLBG SVCS CORP07/29/2010
BISOTISSUEDEXCEL INTERIOR CONSTRUCTION07/23/2010
BISPLISSUEDJEFFREY VULPIS PLMBNG LLC06/30/2010
BISBLISSUEDJEFFREY VULPIS PLMBNG LLC06/30/2010
BISOTISSUEDKEL-MAR DESIGNS INC05/25/2010
BISPLISSUEDJEFFREY VULPIS PLMBNG LLC04/15/2010
BISPLISSUEDPRIME PIPING & HEATING IN12/02/2009
BISSPISSUEDPRIME PIPING & HEATING IN06/12/2009
BISPLISSUEDPRIME PIPING & HEATING IN06/12/2009
BISOTISSUEDKEL-MAR DESIGNS INC05/21/2009
BISOTISSUEDKEL-MAR DESIGNS INC05/21/2009
BISPLISSUEDJEFFREY VULPIS PLMBNG LLC02/17/2009
BISSPISSUEDTRIANGLE FIRE PROT CORP01/09/2009
BISMHISSUEDKEL-MAR DESIGNS INC11/28/2008
BISOTISSUEDKEL-MAR DESIGNS INC11/28/2008
BISPLISSUEDTRISTATE PLBG SVCS CORP10/29/2008
BIS—ISSUEDA VELEZ COMPANY05/07/2008
BISPLISSUEDPRIME PIPING & HEATING IN02/29/2008
BISMHISSUEDBETANCOURT PROPERTIES MGMT CORP09/14/2007
BIS—ISSUEDEXCEL INTERIOR CONSTRUCTION08/14/2007
BISPLISSUEDKAPNAG HTG & PLBG CORP.06/28/2007
BISMHISSUEDEXCEL INTERIOR CONSTRUCTION06/21/2007
BISOTISSUEDEXCEL INTERIOR CONSTRUCTION06/21/2007
BISPLISSUEDPRIME PIPING & HEATING IN06/15/2007
BISFPISSUEDMASTER FIRE SYSTEMS, INC06/15/2007
+ 17 more permits on file
3 projects · most recent 05/14/2026
Air Conditioning Systems Others Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/14/2026Permit IssuedWELLDONE INSPECTIONS INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Heat Pump Outdoor ×2
04/10/2026Permit IssuedMAXCO CONTRACTING.INCOthers
Other
__Junk__ NA 1 BTU · Kitchen Exhaust ×1
09/15/2020——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Johnson Controls J10ZFN24R2D1FAA1A3 15 tons · Rooftop Unit ×7
J10ZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×2
J25ZJN30R2D1BAAA1 25 tons · Rooftop Unit ×2
J07YCC00A2AAA5 7 tons · Rooftop Unit ×1
J12ZJN24D2A1FAA1A1 10 tons · Rooftop Unit ×1
J15ZFN30D2A1FAA1A1 15 tons · Rooftop Unit ×1
J1OZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×1
J25ZJN30R2D1BAA1A1 25 tons · Rooftop Unit ×1
JI0ZFN24R2D1FAA1A3 10 tons · Rooftop Unit ×1
— J07NLC00B2AA2 96,000 BTU · Condensing Unit ×1
Heating
Johnson Controls J10ZFN24R2D1FAA1A3 15 tons · Rooftop Unit ×7
J10ZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×2
J25ZJN30R2D1BAAA1 25 tons · Rooftop Unit ×2
J12ZJN24D2A1FAA1A1 10 tons · Rooftop Unit ×1
J15ZFN30D2A1FAA1A1 15 tons · Rooftop Unit ×1
J1OZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×1
J25ZJN30R2D1BAA1A1 25 tons · Rooftop Unit ×1
JI0ZFN24R2D1FAA1A3 10 tons · Rooftop Unit ×1
Ventilation
Lg ARNU243SKA4 24 tons · Vrf Indoor ×1
ARUNO24GSS4 2 tons · Vrf Outdoor ×1
1 project · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026——21 heads
2 projects · most recent 04/10/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/10/2026Signed-offIPS PLUMBING CORPGas, Water/Sanitary
12/05/2025Signed-offHT PLUMBING & HEATING CORWater/Sanitary
3 projects · most recent 01/29/2026
General Wiring
FiledStatusContractorScope
01/29/2026Permit IssuedVOLTAGE ELECTRICAL SERVGeneral Wiring
03/09/2020Permit IssuedRICHARD NEU—
06/19/2019Permit IssuedRICHARD NEU—
1 project · most recent 06/19/2019
Sidewalk Shed
FiledStatusContractorScope
06/19/2019Permit IssuedJJS BUILDERSSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/11/2026Sprinkler Systems—special
12/05/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
12/05/2025Insulation placement and R valuesSERDAR CEYLANenergy_progress
12/05/2025Lighting controlsSERDAR CEYLANenergy_progress
12/05/2025Interior lighting powerSERDAR CEYLANenergy_progress
12/05/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
12/05/2025FinalSERDAR CEYLANprogress
12/05/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
05/20/2025Mechanical SystemsRobert Truskoskyspecial
05/20/2025FinalAltagracia Martinezprogress
04/27/2020Mechanical SystemsMichael Tobiasspecial
04/27/2020Fire-Resistant Penetrations and JointsMichael Tobiasspecial
04/27/2020Heating SystemsMichael Tobiasspecial
04/27/2020Final—progress
▾Documents — 397 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/20/2026M01322290-I1Request digital key ↗
08/20/2026M01322254-S2Request digital key ↗
08/20/2026M01322254-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00182328-I1Request digital key ↗
09/05/2026M00329104-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00344827-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION42
07/31/2014122026422Open ↗
07/31/2014122026422Open ↗
06/06/2014122026422Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION29
09/14/2012121143244Open ↗
08/06/2012121081480Open ↗
08/06/2012121081480Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLPC Approval/Permit6
08/17/2026M01229195-P1Open ↗
08/13/2026M01229195-S1Open ↗
08/13/2026M01322254-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY5
09/04/2015110389883Open ↗
04/27/2012110389883Open ↗
03/26/2010110389883Open ↗
Showing 3 of 5 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
04/03/2012110033179Open ↗
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION49
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
Showing 3 of 49 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
07/22/2010120410475Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00182328-I1Open ↗
09/05/2026M00329104-I1Open ↗
08/20/2026M01322254-S2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
07/22/2010120410475Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01229195-I1Open ↗
09/05/2026M01322290-I1Open ↗
09/05/2026M01322290-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01229195-I1Open ↗
08/22/2026M00344827-I1Open ↗
08/22/2026M00344827-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment64
▸BISSCHEDULE B - PLUMBING26
07/24/2012121143244Open ↗
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
Showing 3 of 26 on file for this type
▸BISSELF-CERT PLUMBING NOTICE21
10/26/2012121143244Open ↗
10/09/2012121143244Open ↗
03/22/2012120808705Open ↗
Showing 3 of 21 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
04/03/2013120948065Open ↗
03/01/2013120948065Open ↗
05/09/2012110286798Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/15/2011110339526Open ↗
03/01/2010110324818Open ↗
▸BISEQUIPMENT USE PERMITS2
06/15/2011110339526Open ↗
03/03/2010110324818Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
12/13/2010120254009Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/26/2010120254009Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
07/22/2010120410475Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00329104-I1Open ↗
▸Environmental & Asbestos23
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
01/26/2010120254009Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026M01322254-S2Open ↗
08/17/2026M01229195-P1Open ↗
08/13/2026M01322254-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
09/12/2011120808714Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
08/03/2012121143244Open ↗
07/12/2012121081480Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00344827-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
Showing 3 of 8 on file for this type
▸BISEN2 - As Built Energy Analysis2
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/06/2012121081480Open ↗
▸Approvals, Objections & Sign-offs55
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
04/03/2013120948065Open ↗
12/13/2012121081480Open ↗
05/09/2012110286798Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
08/03/2012120948065Open ↗
07/24/2012121143244Open ↗
07/12/2012121081480Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/10/2012121143244Open ↗
04/27/2012120808714Open ↗
04/03/2012110033179Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS APPROVAL6
12/13/2012121081480Open ↗
08/02/2012121081480Open ↗
08/01/2011120254009Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
01/05/2012120808705Open ↗
12/23/2011120808714Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT31
06/06/2014122026422Open ↗
04/03/2013120948065Open ↗
12/13/2012121081480Open ↗
Showing 3 of 31 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET14
06/06/2014122026422Open ↗
08/03/2012120948065Open ↗
07/24/2012121143244Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION5
09/04/2015110389883Open ↗
Showing 1 of 5 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
05/09/2012110286798Open ↗
04/27/2012120808714Open ↗
04/25/2012110033179Open ↗
Showing 3 of 7 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
05/02/2011120254009Open ↗
▸BISSupporting Document: Fee Exempt1
03/01/2010110324818Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/05/2026M00182328-I1Open ↗