← Back
Public elementary, junior or senior high
P.S. M79 - Horan School
1839 MADISON AVENUE · BIN 1053968
💬 Discuss this project
1962Year Built
3Stories
W1Building Class
R7-2Zoning
97,500 sfGross Floor Area
1Units
LL97 Covered9 Open Violations 4 unresolved · 5 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 81,741 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 10 docs
Floor 3Under Construction18p · 1 filing · 20 docs
Floor 2Under Construction19p · 3 filings · 20 docs
Floor 1Under Construction20p · 2 filings · 20 docs
CellarUnder Construction22p · 1 filing · 20 docs
Sub-BasementUnder Construction1 filing · 6 docs
3 jobs · most recent 10/01/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Refrigeration Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/01/2025Permit IssuedKW TECH CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Refrigeration Systems
Heating
Burnham 4FHL-827-50 5,540 CFM · Boiler ×6
09/05/2023——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 34,000 BTU · Fan Coil Indoor ×9
AOU120RLAVL 120,000 BTU · Condensing Unit ×3
07/19/2021——Air Conditioning Systems
Cooling
Fujitsu ASUB36TLAV1 34,000 BTU · Fan Coil Indoor ×6
AOU120RLAVL 120,000 BTU · Condensing Unit ×2
1 job · most recent 10/01/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/01/2025Permit IssuedFORSYTHE P&H CORPGas, Water/Sanitary
14 jobs · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedKANTA ELECTRIC CORP.General Wiring
07/21/2026Permit IssuedSUNKEEPER SOLAR ELECTRIC LLC—
05/14/2026CompleteGEMINI ELECTRIC CO., INC.—
07/17/2025CompleteFALCON ELEC'L CONTR'G CORGeneral Wiring
06/05/2024CompleteTITAN ELEC'L & ELEV CONTR—
01/03/2024CompleteGEMINI ELECTRIC CO., INC.—
12/06/2022CompleteFALCON ELEC'L CONTR'G COR—
10/19/2022Permit IssuedROBERT CHIMENTI2 meters, 1 new_meters
09/30/2022CompleteFALCON ELEC'L CONTR'G COR—
09/26/2022CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
05/16/2022CompleteCHARAN ELEC'L ENTERP'S IN—
02/23/2022CompleteCHARAN ELEC'L ENTERP'S IN—
10/17/2019CompleteLASER ELEC'L CONTR'G INC—
02/07/2019CompleteCHARAN ELEC'L ENTERP'S IN—
1 job · most recent 10/01/2025
Concrete
FiledStatusContractorScope
10/01/2025Permit IssuedFORSYTHE P&H CORPConcrete
1 job · most recent 12/23/2022
Scaffold
FiledStatusContractorScope
12/23/2022Permit IssuedKW TECH CORPScaffold
Building Lifecycle
All (180)Filed (27)Permit Issued (40)Signed Off (4)Violation (60)Inspection (5)Objection (14)Special Inspection (30)
09/01/2026
Permit issued — Solar
M01435915-I1-SL
08/26/2026
Permit issued — Construction Fence
M01446803-S1-FN
08/25/2026
Filed — Alteration
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01446803-S1
08/21/2026
Permit issued — Supported Scaffold
M01446803-I1-SF
08/20/2026
Filed — Alteration
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01446803-I1
08/18/2026
Signed off — Alteration
M07995435-S1
07/01/2026
Permit issued — Plumbing
M00633271-S5-PL
06/16/2026
Signed off — Alteration
M07995435-I1
05/05/2026
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF EMERGENCY TEMPORARY CONSTRUCTION EQUIPMENT (SHED) 100 LF, IN CONJUNCTION WITH DOBNOW# M0063327, NO CHANGE IN USE, OCCUPANCY OR EGRESS
M07998148-I1
05/05/2026
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF EMERGENCY TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) 700 LF, IN CONJUNCTION WITH DOBNOW# M0063327, NO CHANGE IN USE, OCCUPANCY OR EGRESS
M07998134-I1
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2025
Filed — Alteration
Remove some gas piping replace 1 HWH ,1 Sump pump replacement and provide a new secondary RPZ , Provide gas piping for new boiler pilots.
M00633271-P9
09/26/2025
Special inspection requirement — Electrical motors and elevators
JACOB HAAS
09/26/2025
Special inspection requirement — Mechanical Systems
JACOB HAAS
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
09/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACOB HAAS
09/26/2025
Special inspection requirement — Chimneys and vents
JACOB HAAS
09/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
JACOB HAAS
09/26/2025
Special inspection requirement — Shutoff dampers
JACOB HAAS
09/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB HAAS
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
JACOB HAAS
09/26/2025
Special inspection requirement — Maintenance information
JACOB HAAS
09/26/2025
Special inspection requirement — Final
JACOB HAAS
09/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACOB HAAS
09/26/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
09/08/2025
Violation issued (ECB, open)
Construction
09/08/2025
Violation issued (ECB, open)
Construction
09/08/2025
Violation issued (ECB, open)
Construction
08/27/2025
Permit issued — General Construction
M00633271-S4-GC
08/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/28/2025
Permit issued — Plumbing
M00633271-S5-PL
06/17/2025
Filed — Alteration
Remove some gas piping replace 1 HWH ,1 Sump pump replacement and provide a new secondary RPZ , Provide gas piping for new boiler pilots.
M00633271-P8
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
06/17/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
05/08/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
01/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/14/2025
Objection raised — Other
01/14/2025
Objection resolved — Addressed
01/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACOB HAAS
01/14/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JACOB HAAS
01/14/2025
Special inspection requirement — Maintenance information
JACOB HAAS
01/14/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
01/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB HAAS
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
01/14/2025
Special inspection requirement — Heating Systems
JACOB HAAS
01/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACOB HAAS
01/13/2025
Filed — Alteration
Remove some gas piping replace 1 HWH ,1 Sump pump replacement and provide a new secondary RPZ , Provide gas piping for new boiler pilots.
M00633271-P7
01/13/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JACOB HAAS
01/13/2025
Special inspection requirement — Heating Systems
JACOB HAAS
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
01/13/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACOB HAAS
01/10/2025
Filed — Alteration
Remove some gas piping replace 1 HWH ,1 Sump pump replacement and provide a new secondary RPZ , Provide gas piping for new boiler pilots.
M00633271-P6
12/30/2024
Filed — Alteration
Remove some gas piping replace 1 HWH ,1 Sump pump replacement and provide a new secondary RPZ , Provide gas piping for new boiler pilots.
M00633271-P5
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2024
Permit issued — Boiler Equipment
M00633271-S1-BE
Latest 60 of 180 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERESCO109/02/2026
NYCSCA7707/08/2026
NYC SCHOOL CONSTRUCTION AUTHORITY707/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPT OF EDUCATION/ PS 791203/22/2026
DEPT. OF EDUCATION 0303/22/2026
DEPARTMENT OF EDUCATION303/22/2026
DOE P.S.791103/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE PS 79 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NOMAD R&D LLC208/25/2026
NYC SCHOOL CONSTRUCTION AUTHORITY910/01/2025
NYCSCA306/17/2025
EME CONSULTING ENGINEERING GROUP209/05/2023
NYMS CONSULTING, LLC401/11/2023
MSS ENGINEERING PLLC612/23/2022
NYC SCA101/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1103/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY N403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KW TECH CORPGeneral Contractor4107/08/2026
FORSYTHE P&H CORPPlumbing507/08/2026
HEXAGON GROUP INCGeneral Contractor208/27/2026
NAUM VAYNERMANElectrical203/21/2026
FALCON ELEC'L CONTR'G CORElectrical103/22/2026
VICTOR, ALLANElectrical103/21/2026
SUNKEEPER SOLAR ELECTRICGeneral Contractor109/02/2026
ROBERT CHIMENTIElectrical103/21/2026
JOSEPH VITALEElectrical103/21/2026
LASER ELEC'L CONTR'G INCElectrical103/22/2026
MANZUR FLORES, JORGEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 INSPECTIONS INC14712110/01/2025
JPC LOGISTICS DBA JPCL EN351209/05/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNKEEPER SOLAR ELECTRIC09/01/2026
DOB NOWConstruction FencePermit IssuedHEXAGON GROUP INC08/26/2026
DOB NOWSupported ScaffoldPermit IssuedHEXAGON GROUP INC08/21/2026
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP07/01/2026
DOB NOWGeneral ConstructionPermit IssuedKW TECH08/27/2025
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP07/28/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/21/2024
DOB NOWMechanical SystemsPermit IssuedKW TECH10/01/2024
DOB NOWStructuralPermit IssuedKW TECH10/01/2024
DOB NOWGeneral ConstructionPermit IssuedKW TECH10/01/2024
DOB NOWSidewalk ShedSigned-offKW TECH09/23/2024
DOB NOWConstruction FenceSigned-offKW TECH09/19/2024
DOB NOWGeneral ConstructionPermit IssuedKW TECH09/19/2024
DOB NOWSupported ScaffoldPermit IssuedKW TECH09/03/2024
DOB NOWMechanical SystemsSigned-offKW TECH08/30/2024
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP08/26/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/24/2023
DOB NOWMechanical SystemsPermit IssuedKW TECH10/05/2023
DOB NOWStructuralPermit IssuedKW TECH10/05/2023
DOB NOWGeneral ConstructionPermit IssuedKW TECH10/05/2023
DOB NOWStructuralPermit IssuedKW TECH09/22/2023
DOB NOWGeneral ConstructionPermit IssuedKW TECH09/22/2023
DOB NOWMechanical SystemsPermit IssuedKW TECH09/22/2023
DOB NOWConstruction FenceSigned-offKW TECH09/22/2023
DOB NOWGeneral ConstructionPermit IssuedKW TECH09/22/2023
DOB NOWSidewalk ShedSigned-offKW TECH09/21/2023
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP09/20/2023
DOB NOWConstruction FenceSigned-offKW TECH09/05/2023
DOB NOWSupported ScaffoldPermit IssuedKW TECH08/31/2023
DOB NOWMechanical SystemsSigned-offKW TECH08/31/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/20/2022
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP10/20/2022
DOB NOWStructuralPermit IssuedKW TECH10/13/2022
DOB NOWMechanical SystemsPermit IssuedKW TECH10/06/2022
DOB NOWGeneral ConstructionPermit IssuedKW TECH10/06/2022
DOB NOWGeneral ConstructionPermit IssuedKW TECH10/06/2022
DOB NOWConstruction FenceSigned-offKW TECH10/05/2022
DOB NOWSidewalk ShedSigned-offKW TECH09/30/2022
DOB NOWSupported ScaffoldPermit IssuedKW TECH09/28/2022
DOB NOWMechanical SystemsSigned-offKW TECH09/27/2022
+ 23 more permits on file
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
09/26/2025Chimneys and ventsJACOB HAASspecial
09/26/2025Shutoff dampersJACOB HAASenergy_progress
09/26/2025Maintenance informationJACOB HAASenergy_progress
09/26/2025HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
09/26/2025Electrical motors and elevatorsJACOB HAASenergy_progress
09/26/2025HVAC-R and service water heating system controlsJACOB HAASenergy_progress
09/26/2025HVAC-R and service water heating equipmentJACOB HAASenergy_progress
09/26/2025Fire-Resistance Rated ConstructionJACOB HAASprogress
09/26/2025FinalJACOB HAASprogress
09/26/2025Energy Code Compliance InspectionsJACOB HAASprogress
09/26/2025Post-installed AnchorsJACOB HAASspecial
09/26/2025Mechanical SystemsJACOB HAASspecial
09/26/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
06/17/2025Post-installed AnchorsJACOB HAASspecial
06/17/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
05/08/2025Post-installed AnchorsJACOB HAASspecial
05/08/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
01/14/2025Maintenance informationJACOB HAASenergy_progress
01/14/2025HVAC-R and service water heating system controlsJACOB HAASenergy_progress
01/14/2025Post-installed AnchorsJACOB HAASspecial
01/14/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsJACOB HAASspecial
01/14/2025Heating SystemsJACOB HAASspecial
01/14/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
01/14/2025HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
01/14/2025HVAC-R and service water heating equipmentJACOB HAASenergy_progress
Latest 25 of 66.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/03/2026M00556489-I1Request digital key ↗
09/02/2026M00633271-P7Request digital key ↗
09/02/2026M00633271-P2Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
03/07/2013120807859Open ↗
03/21/2012120807859Open ↗
09/13/2011120807859Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2011120807859Open ↗
▸Seals & Professional Certifications90
▸DOB NOWSpecial Inspector Seal & Signature31
09/29/2026M00633271-P2Open ↗
09/29/2026M00633271-P2Open ↗
09/23/2026M00633271-S1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026M00633271-S1Open ↗
09/23/2026M00633271-S1Open ↗
09/23/2026M00633271-S1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/02/2026M00633271-P1Open ↗
09/02/2026M00633271-S5Open ↗
09/02/2026M00633271-P2Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/13/2011120807859Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/13/2011120807859Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/13/2011120807859Open ↗
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
08/13/2026M07998158-P1Open ↗
08/13/2026M07998134-P1Open ↗
08/13/2026M07998148-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/13/2026M00633271-S1Open ↗
08/13/2026M00633271-I1Open ↗
08/13/2026M00633271-S6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M07995435-S1Open ↗
08/13/2026M07995435-P2Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/13/2011120807859Open ↗
▸Approvals, Objections & Sign-offs70
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/02/2026M00633271-S5Open ↗
09/02/2026M00633271-P1Open ↗
09/02/2026M00633271-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
09/02/2026M00633271-P1Open ↗
09/02/2026M00633271-S5Open ↗
09/02/2026M00633271-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)9
09/01/2026M07995435-I1Open ↗
09/01/2026M07995435-S1Open ↗
08/15/2026M07998134-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter6
08/13/2026M00633271-S1Open ↗
08/13/2026M00633271-I1Open ↗
08/13/2026M00633271-S3Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER2
03/21/2012120807859Open ↗
02/09/2012120807859Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/07/2013120807859Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/13/2011120807859Open ↗
▸Filing & Intake Forms5
▸DOB NOWAI1 Form4
09/02/2026M00633271-S1Open ↗
08/13/2026M00633271-P7Open ↗
08/13/2026M00633271-P6Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
09/13/2011120807859Open ↗
▸Other Documents30
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal24
09/02/2026M00633271-P2Open ↗
09/02/2026M00633271-S5Open ↗
09/02/2026M00633271-P6Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWNYCSCA Exhibit 24
09/01/2026M07995435-I1Open ↗
09/01/2026M07995435-S1Open ↗
08/15/2026M07998134-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWaiver Document2
08/15/2026M00633271-I1Open ↗
Showing 1 of 2 on file for this type