184-28 MIDLAND PARKWAY
QUEENS · Jamaica Estates-Holliswood · BIN 4156068
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R1-2Zoning
2,779 sfGross Floor Area
1Units
7 Open Violations 3 unresolved · 4 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 7,866 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction37p · 1 filing · 20 docs
Site & exteriorUnder Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIAMOND DEV GROUP2908/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/07/2025$3.0M—Private party → Private party$1,079/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECC SOLUTIONS303/31/2026
R & O ENGINEERING401/16/2026
ARC ARCHITECTURE + DESIGN STUDIO301/08/2026
R AND O ENGINEERING. P.C.109/22/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGB CONSTRUCTION INCGeneral Contractor508/07/2026
IR CONTRACTING INCGeneral Contractor107/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor104/09/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616403/08/2026
R & O ENGINEERING, P.C.2649109/22/2025
Building Lifecycle
All (77)Filed (11)Permit Issued (6)Violation (8)Inspection (6)Objection (16)Special Inspection (30)
08/06/2026
Permit issued — Construction Fence
Q01275648-S5-FN
07/09/2026
Violation issued (ECB, open)
Unknown
07/09/2026
Violation issued (ECB, open)
Unknown
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, open)
Unknown
06/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
04/02/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SHAHRIAR QUAYYUM
04/02/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
04/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
03/31/2026
Filed — Alteration
Partial demolition on exterior and interior from the first and second floor.
Q01275648-S6
03/31/2026
Special inspection requirement — Maintenance information
03/31/2026
Special inspection requirement — Mechanical Systems
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/31/2026
Special inspection requirement — Shutoff dampers
03/31/2026
Special inspection requirement — Ventilation and air distribution system
03/31/2026
Special inspection requirement — Heating Systems
03/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/31/2026
Special inspection requirement — Final
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/23/2026
Violation issued (ECB, open)
Construction
03/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/19/2026
Violation issued (ECB, open)
Unknown
03/19/2026
Violation issued (ECB, open)
Construction
03/08/2026
Filed — Alteration
Partial demolition on exterior and interior from the first and second floor.
Q01275648-P4
02/25/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SHAHRIAR QUAYYUM
02/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
02/25/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
02/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
02/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
02/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/12/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
02/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
01/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
01/31/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
01/16/2026
Filed — Alteration
Partial demolition on exterior and interior from the first and second floor.
Q01275648-P1
01/16/2026
Filed — Alteration
Partial demolition on exterior and interior from the first and second floor.
Q01275648-P3
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/08/2026
Filed — Alteration
Partial demolition on exterior and interior from the first and second floor.
Q01275648-P2
01/02/2026
Permit issued — Plumbing
Q01275648-S4-PL
12/01/2025
Permit issued — Foundation
Q01275648-S2-FO
11/28/2025
Permit issued — General Construction
Q01275648-I1-GC
11/25/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/20/2025
Objection raised — Other
11/20/2025
Objection raised — Admin
11/05/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
10/30/2025
Objection raised — Plumbing
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedUGB CONSTRUCTION INC08/06/2026
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC01/02/2026
DOB NOWFoundationPermit IssuedUGB CONSTRUCTION INC12/01/2025
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC11/28/2025
DOB NOWConstruction FencePermit IssuedIR CONTRACTING INC10/20/2025
DOB NOWStructuralPermit IssuedNORTHEAST SPECIALIST GROUP10/17/2025
BISOTRE-ISSUEDGENCO BUILDERS INC05/27/1998
BIS—ISSUEDN/A10/10/1991
1 project · most recent 03/31/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2026Permit IssuedUGB CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-RVHP36M 3 tons · Heat Pump Outdoor ×2
CH-RVHP48M 4 tons · Heat Pump Outdoor ×2
1 project · most recent 03/31/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/31/2026Permit IssuedPLUMB-IT MECHANICAL INCGas, Storm, Water/Sanitary
3 projects · most recent 04/17/2026
General Wiring
FiledStatusContractorScope
04/17/2026Permit IssuedELECTRICAL SVCS & CONS GPGeneral Wiring
02/19/2026Permit IssuedELECTRICIAN NYC LLCGeneral Wiring
12/17/2025Permit IssuedEXPERT ELECTRIC.CONT NY IGeneral Wiring
1 project · most recent 03/31/2026
Steel Wood
FiledStatusContractorScope
03/31/2026Permit IssuedUGB CONSTRUCTION INCSteel, Wood
1 project · most recent 03/31/2026
Fence
FiledStatusContractorScope
03/31/2026Permit IssuedUGB CONSTRUCTION INCFence
1 project · most recent 03/31/2026
Earthwork
FiledStatusContractorScope
03/31/2026Permit IssuedUGB CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
04/02/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSHAHRIAR QUAYYUMspecial
04/02/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
04/02/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
04/02/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
04/02/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
04/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
03/31/2026HVAC-R and service water heating equipment—energy_progress
03/31/2026HVAC-R and service water piping design and insulation—energy_progress
03/31/2026Duct leakage testing, insulation and design—energy_progress
03/31/2026Shutoff dampers—energy_progress
03/31/2026Ventilation and air distribution system—energy_progress
03/31/2026Mechanical Systems—special
03/31/2026Fire-Resistant Penetrations and Joints—special
03/31/2026Heating Systems—special
03/31/2026Final—progress
03/31/2026HVAC-R and service water heating system controls—energy_progress
03/31/2026Maintenance information—energy_progress
02/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
02/25/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/25/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
02/25/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
02/25/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
02/25/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSHAHRIAR QUAYYUMspecial
02/12/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
02/12/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
Latest 25 of 61.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/17/2026Q01275648-S2Request digital key ↗
08/17/2026Q01275648-S6Request digital key ↗
08/17/2026Q01275648-P4Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/17/2026Q01275648-S6Open ↗
08/13/2026Q01275648-I1Open ↗
08/13/2026Q01275648-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q01275648-S3Open ↗
09/02/2026Q01275648-S3Open ↗
09/02/2026Q01275648-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026Q01275648-S3Open ↗
08/30/2026Q01275648-S2Open ↗
08/28/2026Q01275648-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/17/2026Q01275648-S6Open ↗
08/13/2026Q01275648-S3Open ↗
08/13/2026Q01275648-S2Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01275648-S2Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram2
08/13/2026Q01275648-P1Open ↗
08/13/2026Q01275648-S2Open ↗