Large suburban residence
184-38 MIDLAND PARKWAY
QUEENS · Jamaica Estates-Holliswood · BIN 4156070
💬 Discuss this project
1935Year Built
2.5Stories
A3Building Class
R1-2Zoning
3,431 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 6,600 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Attic13p · 2 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 113p · 3 filings · 20 docs
Cellar13p · 3 filings · 20 docs
Site & exterior20p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REMAX CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/23/2021$1.4M—— → —$402/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC610/24/2023
ALPHA ENGINEERING104/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING68601203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REMAX CONSTRUCTION LLCGeneral Contractor1007/08/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
RCM GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252610/24/2023
Building Lifecycle
All (102)Filed (7)Permit Issued (7)Signed Off (3)Violation (2)Inspection (7)Objection (46)Special Inspection (30)
12/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/15/2023
Signed off — Alteration
HEREWITH FILING ALTERATION IN CONJUNCTION WITH ALT # Q00626073-I1FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q00724081-I1
10/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/31/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
10/30/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Admin
10/25/2023
Objection raised — Other
10/24/2023
Filed — Alteration
HEREWITH FILING ALTERATION IN CONJUNCTION WITH ALT # Q00626073-I1FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q00724081-P1
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/24/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
10/16/2023
Signed off — Alteration
Q00636661-I1
10/16/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/10/2023
Permit issued — Plumbing
Q00724081-I1-PL
07/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2023
Signed off — Alteration
FILLING FOR ALTERATION PROPOSED PARTIAL DEMOLITION OF THE EXISTING BUILDING. EXCAVATION, FOUNDATION, AND STRUCTURAL WORK IN CONJUNCTION WITH Q00626073
Q00708402-I1
06/15/2023
Permit issued — Construction Fence
Q00636661-I1-FN
03/03/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/26/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
01/26/2023
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
01/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
01/26/2023
Special inspection requirement — Final
NAVEEN KUMAR
01/26/2023
Special inspection requirement — Permanent certificate
Younes Abouyaala
01/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/26/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
INDARDEO PARBHUNATH
01/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
01/26/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
01/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
01/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/26/2023
Special inspection requirement — Exterior lighting power
Younes Abouyaala
01/26/2023
Special inspection requirement — Fireplaces
Younes Abouyaala
01/26/2023
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
01/26/2023
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
01/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/26/2023
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
01/26/2023
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
01/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/26/2023
Special inspection requirement — Lighting controls
Younes Abouyaala
01/26/2023
Special inspection requirement — Fenestration areas
Younes Abouyaala
01/26/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
01/26/2023
Special inspection requirement — Shutoff dampers
Younes Abouyaala
01/23/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00626073-P2
11/30/2022
Permit issued — General Construction
Q00626073-I1-GC-CX
06/22/2022
Violation issued (ECB, closed)
Site Safety
06/22/2022
Violation issued (ECB, closed)
Construction
06/21/2022
Permit issued — Plumbing
Q00724081-I1-PL
06/17/2022
Permit issued — Structural
Q00708402-I1-GC-CX
06/03/2022
Permit issued — Mechanical Systems
Q00626073-I1-GC-CX
05/19/2022
Permit issued — Construction Fence
Q00636661-I1-FN
05/06/2022
Objection resolved — Addressed
05/03/2022
Objection raised — Scope
05/03/2022
Objection resolved — Addressed
04/26/2022
Objection raised — Admin
04/26/2022
Objection resolved — Addressed
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC10/10/2023
DOB NOWConstruction FenceSigned-offREMAX CONSTRUCTION LLC06/15/2023
DOB NOWGeneral ConstructionPermit IssuedRCM GROUP INC11/30/2022
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC06/21/2022
DOB NOWStructuralSigned-offREMAX CONSTRUCTION LLC06/17/2022
DOB NOWMechanical SystemsPermit IssuedREMAX CONSTRUCTION LLC06/03/2022
DOB NOWConstruction FenceSigned-offREMAX CONSTRUCTION LLC05/19/2022
1 project · most recent 01/23/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/23/2023Permit IssuedRCM GROUP INCHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×8
Heating
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×8
Ventilation
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×8
3 projects · most recent 01/09/2024
General Wiring
FiledStatusContractorScope
01/09/2024CompleteKINGS ELECTRIC CO., INC.1 meters
10/25/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
06/23/2022CompleteKINGS ELECTRIC CO., INC.—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
10/31/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
10/31/2023Maintenance informationYounes Abouyaalaenergy_progress
10/31/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/24/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
10/24/2023Maintenance informationYounes Abouyaalaenergy_progress
10/24/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/26/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/26/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
01/26/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/26/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
01/26/2023FinalNAVEEN KUMARprogress
01/26/2023Insulation placement and R valuesYounes Abouyaalaenergy_progress
01/26/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/26/2023Fenestration areasYounes Abouyaalaenergy_progress
01/26/2023Interior lighting powerYounes Abouyaalaenergy_progress
01/26/2023Maintenance informationYounes Abouyaalaenergy_progress
01/26/2023Shutoff dampersYounes Abouyaalaenergy_progress
01/26/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/26/2023Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
01/26/2023Exterior lighting powerYounes Abouyaalaenergy_progress
01/26/2023FireplacesYounes Abouyaalaenergy_progress
01/26/2023Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
01/26/2023Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
01/26/2023Permanent certificateYounes Abouyaalaenergy_progress
01/26/2023Air barrier - visual inspectionYounes Abouyaalaenergy_progress
Latest 25 of 90.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00636661-I1Request digital key ↗
08/25/2026Q00626073-P2Request digital key ↗
08/15/2026Q00708402-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00626073-P1Open ↗
08/13/2026Q00626073-P2Open ↗
08/13/2026Q00626073-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00626073-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature18
08/29/2026Q00626073-P2Open ↗
08/29/2026Q00626073-P2Open ↗
08/29/2026Q00626073-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026Q00626073-P2Open ↗
08/29/2026Q00626073-P2Open ↗
08/29/2026Q00626073-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00636661-I1Open ↗
08/25/2026Q00626073-I1Open ↗
08/25/2026Q00626073-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00626073-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00626073-P2Open ↗
08/15/2026Q00626073-P1Open ↗
08/14/2026Q00626073-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00626073-I1Open ↗
08/13/2026Q00724081-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00626073-I1Open ↗
08/13/2026Q00626073-P1Open ↗
08/13/2026Q00626073-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00626073-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00626073-I1Open ↗
▸Other Documents11
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00626073-P2Open ↗
08/13/2026Q00708402-I1Open ↗
08/13/2026Q00626073-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/25/2026Q00626073-P2Open ↗
08/15/2026Q00626073-P1Open ↗
08/14/2026Q00626073-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00626073-P2Open ↗
08/13/2026Q00626073-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00708402-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00626073-I1Open ↗