Multi-story retail building (2+)
184 BEDFORD AVENUE
BROOKLYN · BIN 3062080
💬 Discuss this project
2024Year Built
2Stories
K2Building Class
R6BZoning
24,360 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: RS JZ BEDFORD - N 6TH, LLC · 8,400 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof70p · 1 filing · 20 docs
Floor 269p · 1 filing · 20 docs
Floor 1Under Construction65p · 3 filings · 20 docs
Cellar68p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L3 CAPITAL9209/17/2026
JLL304/09/2026
PLATINUM SERVICES NY604/09/2026
184 BEDFORD AVE1203/22/2026
RS JZ BEDFORD - N 6TH403/21/2026
RSJ BEDFORDN6LLCC OL3CAPITAL203/21/2026
RS JZ 184 204 BEDFORD303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GENSLER308/19/2026
HNY CONSULTING ENGINEERS LLC404/20/2026
ASDA ARCHITECTURE + DESIGN102/13/2026
KMB DESIGN GROUP, LLC810/22/2025
BUILDING STUDIO ARCHITECTS410/20/2025
ASHRAF CORP109/13/2024
ANCORA ENGINEERING, PLLC806/25/2024
CPENGINEERING PC201/02/2024
KZ ENGINEERING, P.C309/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS3803/21/2026
RICHARD WAINER ARCHITECT, PLLC603/21/2026
CASA GROUP403/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
PERCIBALLI INDUSTRIES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MC GOWAN BUILDERS INCGeneral Contractor1607/08/2026
SHAPEL GENERAL CONTRACTINGeneral Contractor508/30/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
J. CAIAZZO PLBG & HTG CORPlumbing307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor304/09/2026
CAVAN BUILDERS CORPGeneral Contractor209/17/2026
PERCIBALLI INDUSTRIES INC.General Contractor203/21/2026
ARTUR KRZYSElectrical103/21/2026
SERVICE SIGN ERECTORSScaffold107/08/2026
STAN LYUBOMUDROVElectrical103/21/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
KEY CIVIL ENGINEERING, PCGeneral Contractor103/22/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
UNIVERSAL FIRE SPRPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983404/20/2026
MT GROUP7981510/22/2025
ANCORA ENGINEERING, PLLC6818606/25/2024
Building Lifecycle
All (205)Filed (34)Permit Issued (26)Signed Off (10)Violation (14)Inspection (11)Objection (80)Special Inspection (30)
09/16/2026
Permit issued — General Construction
B01456803-I1-GC
09/16/2026
Permit issued — Mechanical Systems
B01456803-S1-MS
08/27/2026
Permit issued — General Construction
B01413967-I1-GC
08/19/2026
Filed — Alteration
SCOPE OF WORK IS AN ADDITION OF NEW INTERIOR DOOR IN AN EXISTING OPENING ON A NON-RATED PARTITION WALL. NO CHANGE IN EGRESS, USE OR OCCUPANCY
B01413967-I1
08/14/2026
Special inspection requirement — Final
Thomas Lanzelotti
07/13/2026
Signed off — Alteration
Filing for Construction Fence in conjunction with New Building Application B00563137
B00966127-I1
04/28/2026
Signed off — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-S2
04/28/2026
Signed off — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-I1
04/28/2026
Signed off — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-S1
04/21/2026
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — Metering
ALEXIS SCHLESSINGERMAN
04/21/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/20/2026
Filed — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-P1
04/20/2026
Filed — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-P2
04/20/2026
Filed — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-P3
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
04/20/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
04/20/2026
Special inspection requirement — Sprayed fire-resistant materials
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Sprayed fire-resistant materials
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Metering
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
04/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
03/25/2026
Signed off — New Building
Mechanical systems alterations related to proposed lot merger and construction of new 2-story commercial building with cellar; related work as per plan
B00563137-S6
03/25/2026
Signed off — New Building
Mechanical systems alterations related to proposed lot merger and construction of new 2-story commercial building with cellar; related work as per plan
B00563137-S2
03/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/19/2026
Permit issued — Sign
B01358285-I1-SG
02/13/2026
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B01358285-I1
02/11/2026
Special inspection requirement — Final
Alfonso DElia
02/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2026
Permit issued — Plumbing
B01318445-S1-PL
01/05/2026
Permit issued — Mechanical Systems
B00563137-S2-MS
01/05/2026
Permit issued — General Construction
B01318445-I1-GC
01/05/2026
Permit issued — Mechanical Systems
B01318445-S2-MS
12/22/2025
Filed — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-S2
12/22/2025
Filed — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-S1
12/15/2025
Filed — Alteration
Renovation of the 1st floor for retail build out, minor partition work, replace wall finishes, floor and ceiling. Subsequent filings for plumbing and mechanical to be filed. No change in use, egress or occupancy
B01318445-I1
11/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/12/2025
Objection resolved — Addressed
11/04/2025
Signed off — Alteration
B01109630-I1
10/29/2025
Objection raised — Other
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCAVAN BUILDERS CORP09/16/2026
DOB NOWMechanical SystemsPermit IssuedCAVAN BUILDERS CORP09/16/2026
DOB NOWGeneral ConstructionPermit IssuedSHAPEL GENERAL CONTRACTIN08/27/2026
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO02/19/2026
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR01/06/2026
DOB NOWMechanical SystemsSigned-offMC GOWAN BUILDERS INC01/05/2026
DOB NOWGeneral ConstructionSigned-offSHAPEL GENERAL CONTRACTIN01/05/2026
DOB NOWMechanical SystemsSigned-offSHAPEL GENERAL CONTRACTIN01/05/2026
DOB NOWGeneral ConstructionPermit IssuedMC GOWAN BUILDERS INC08/12/2025
DOB NOWMechanical SystemsSigned-offMC GOWAN BUILDERS INC12/03/2024
DOB NOWSupport of ExcavationPermit IssuedMC GOWAN BUILDERS INC12/03/2024
DOB NOWPlumbingSigned-offUNIVERSAL FIRE SPR LLC10/30/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC09/13/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC09/13/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC09/13/2024
DOB NOWSprinklersSigned-offMETROTECH MECHANICAL CORP08/28/2024
DOB NOWStructuralSigned-offMC GOWAN BUILDERS INC08/14/2024
DOB NOWGeneral ConstructionPermit IssuedMC GOWAN BUILDERS INC08/13/2024
DOB NOWGeneral ConstructionSigned-offMC GOWAN BUILDERS INC12/14/2023
DOB NOWConstruction FenceSigned-offMC GOWAN BUILDERS INC12/08/2023
DOB NOWSupport of ExcavationPermit IssuedMC GOWAN BUILDERS INC12/05/2023
DOB NOWMechanical SystemsSigned-offMC GOWAN BUILDERS INC12/05/2023
DOB NOWGeneral ConstructionPermit IssuedMC GOWAN BUILDERS INC11/14/2023
DOB NOWConstruction FenceSigned-offPERCIBALLI INDUSTRIES INC.07/28/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC07/09/2022
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC07/09/2022
BISEQISSUEDPERCIBALLI INDUSTRIES INC.09/15/2022
BIS—ISSUEDPERCIBALLI INDUSTRIES INC.09/08/2022
BISOTISSUEDECLIPSE DEVELOPMENT INC03/24/2016
BISMHISSUEDMAR REF. INC08/26/2008
BISOTISSUEDGEORGE CHO CONTRS INC04/25/2006
BISPLISSUEDSPEEDWAY PLUMBING CORP06/08/2005
BISFPISSUEDIDEAL FIRE SYSTEMS INC08/06/2002
BISPLISSUEDTHEODORE WAGNER PLBG & HTG CORP06/03/2002
BISPLISSUEDTHEODORE WAGNER PLBG & HTG CORP05/28/2002
BIS—ISSUEDHOME IS WHERE THE HART IS05/24/2002
BIS—ISSUEDHOME IS WHERE THE HART IS12/17/2001
BIS—ISSUEDACIERNO CONSTRUCTION CORP.03/30/2001
BISFPISSUEDIDEAL FIRE CONTROL07/01/1994
1 project · most recent 10/22/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/22/2025Signed-offMC GOWAN BUILDERS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXMQ72MVJU 72,000 BTU · Vrf Indoor ×9
FXMQ96MVJU 96,000 BTU · Vrf Indoor ×9
REYQ120AATJA 120,000 BTU · Vrf Outdoor ×6
FTXC09AXVJU 9,000 BTU · Ahu ×6
FTXV12AVJU9 11,500 BTU · Ahu ×6
RXC09AXVJU 9,000 BTU · Condensing Unit ×6
3MXM24AVJU9 23,000 BTU · Condensing Unit ×3
DPSC18B 230,416 BTU · Rooftop Unit ×3
FXMQ48PBVJU 48,000 BTU · Vrf Indoor ×3
REYQ168AATJA 168,000 BTU · Vrf Outdoor ×2
REYQ360AATJA 360,000 BTU · Vrf Outdoor ×2
REYQ120AATJB 120,000 BTU · Vrf Outdoor ×3
REYQ168AATJB 168,000 BTU · Vrf Outdoor ×1
REYQ360AATJB 360,000 BTU · Vrf Outdoor ×1
Qmark MUH0381 350 CFM · Electric Heater ×15
Ventilation
Greenheck CSP-A200 214 CFM · Exhaust Fan ×3
CSP-A410 217 CFM · Exhaust Fan ×3
SP-B150 155 CFM · Exhaust Fan ×3
1 project · most recent 10/22/2025
Sprinkler System
FiledStatusContractorScope
10/22/2025Signed-offUNIVERSAL FIRE SPR LLCSprinkler System
2 projects · most recent 04/20/2026
Water/Sanitary Storm
FiledStatusContractorScope
04/20/2026Signed-offJ. CAIAZZO PLBG & HTG CORWater/Sanitary
10/22/2025Signed-offMETROTECH MECHANICAL CORPStorm, Water/Sanitary
6 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
06/23/2026CompleteM.C. ELECTRICAL NY INCGeneral Wiring
04/02/2026CompleteLEBO ELECTRIC LLCGeneral Wiring
02/13/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
10/14/2024CompleteRICHARD NEU—
07/15/2022CompleteNASH ELECTRIC SERVICES IN—
2 projects · most recent 08/19/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/19/2026Permit IssuedSHAPEL GENERAL CONTRACTIN1 scope_items
10/22/2025Signed-offMC GOWAN BUILDERS INCSteel, Concrete, Masonry
1 project · most recent 01/02/2024
Fence
FiledStatusContractorScope
01/02/2024Signed-offMC GOWAN BUILDERS INCFence
1 project · most recent 10/22/2025
Earthwork
FiledStatusContractorScope
10/22/2025Signed-offMC GOWAN BUILDERS INCEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/14/2026FinalThomas Lanzelottiprogress
04/21/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/21/2026HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/21/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
04/21/2026FinalALEXIS SCHLESSINGERMANprogress
04/21/2026Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
04/21/2026Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
04/21/2026MeteringALEXIS SCHLESSINGERMANenergy_progress
04/21/2026Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
04/21/2026HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/21/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
04/20/2026Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
04/20/2026FinalALEXIS SCHLESSINGERMANprogress
04/20/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
04/20/2026Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
04/15/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
04/15/2026FinalALEXIS SCHLESSINGERMANprogress
04/15/2026Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
04/15/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
04/15/2026HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/15/2026Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
04/15/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/15/2026HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/15/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
04/15/2026Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 150.
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch34
08/29/2026B00762133-I1Request digital key ↗
08/29/2026B00762133-P1Request digital key ↗
08/29/2026B00762132-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION7
09/20/2022322095969Open ↗
09/16/2022322095969Open ↗
09/16/2022322095969Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
03/24/2023340823568Open ↗
08/09/2021322095969Open ↗
03/24/2016321356402Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/28/2023340823568Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026B00563137-P7Open ↗
08/15/2026B00563137-I1Open ↗
08/13/2026B00563137-A3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/26/2026B00563137-P7Open ↗
08/15/2026B00563137-I1Open ↗
08/13/2026B00563137-P5Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/24/2023340823568Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/24/2023340823568Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00563137-I1Open ↗
▸Seals & Professional Certifications101
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/29/2026B00762133-P1Open ↗
08/29/2026B00762133-I1Open ↗
08/29/2026B00762132-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/18/2026B00563137-A4Open ↗
09/18/2026B00563137-A4Open ↗
09/02/2026B01318445-P2Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/18/2026B00563137-A4Open ↗
09/01/2026B00563137-A5Open ↗
08/31/2026B01318445-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/16/2022322095969Open ↗
09/16/2022322095969Open ↗
06/08/2016321356402Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/24/2016321356402Open ↗
08/26/2008310182334Open ↗
▸BISProfessional and Owner Certification (POC3)1
03/24/2016321356402Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/24/2023340823568Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/26/2008310182334Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/26/2026B00563137-P7Open ↗
08/15/2026B00563137-I1Open ↗
08/13/2026B00563137-P5Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/28/2008310182334Open ↗
▸BISEQUIPMENT USE PERMITS1
11/28/2008310182334Open ↗
▸BISSCHEDULE B - PLUMBING1
09/09/2011320353513Open ↗
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist4
08/26/2026B00563137-P7Open ↗
08/15/2026B00563137-I1Open ↗
08/14/2026B00563137-P5Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
03/28/2023340823568Open ↗
09/09/2011320353513Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00563137-S1Open ↗
08/13/2026B00563137-I1Open ↗
▸BISSTREET TREES SITE PLAN1
03/24/2023340823568Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/16/2022322095969Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
03/24/2023340823568Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/24/2023340823568Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
09/16/2022322095969Open ↗
▸BISTenant Protection Plan and Notes1
03/24/2016321356402Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00563137-I1Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/26/2008310182334Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/24/2016321356402Open ↗
▸BISRODENT CONTROL1
09/16/2022322095969Open ↗
▸Energy Compliance5
▸BISAS-BUILT ENERGY ANALYSIS1
06/08/2016321356402Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/09/2011320353513Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/24/2016321356402Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/26/2026B00563137-S2Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/26/2026B00563137-S6Open ↗
▸Inspections & Test Reports1
▸DOB NOWHydrant Flow Test Letter1
08/15/2026B00563137-S3Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/16/2022322095969Open ↗
09/16/2022322095969Open ↗
09/16/2022322095969Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/09/2011320353513Open ↗
08/26/2008310182334Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/08/2016321356402Open ↗
11/28/2008310182334Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/09/2011320353513Open ↗
▸BISLANDMARKS APPROVAL1
09/16/2022322095969Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/28/2023340823568Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT5
06/08/2016321356402Open ↗
03/24/2016321356402Open ↗
09/09/2011320353513Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/20/2022322095969Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00563137-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00563137-I1Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
08/09/2021322095969Open ↗
03/25/2016321356402Open ↗
09/09/2011320353513Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
08/09/2021322095969Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/24/2023340823568Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/24/2023340823568Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial8
08/26/2026B00563137-P7Open ↗
08/15/2026B00563137-I1Open ↗
08/13/2026B00563137-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/26/2026B00563137-P7Open ↗
08/15/2026B00563137-I1Open ↗
08/13/2026B00563137-P5Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/16/2022322095969Open ↗
09/16/2022322095969Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00563137-S1Open ↗
08/13/2026B00563137-S4Open ↗
▸BISPLOT DIAGRAM1
09/09/2011320353513Open ↗
▸DOB NOWHydraulic Calculations1
08/13/2026B00563137-S3Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00563137-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00563137-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00563137-I1Open ↗