DOB03/27/2024A 2 STORY ENLARGEMENT IN PROGRESS AT REAR CORNER EXPOSURE 2/3. PRESENTLY AT FRAMING STAGE, NO ROOF. NO PLANS OR PERMITS AT DOB
ECB11/10/2025WORK WITHOUT A PERMIT. NOTED : AT TIME OF INSPECTION ,OBSERVED AT EXPOSURE 2&3 AN ENLARGEMENT IS IN THE FRAMING STAGE , THERE IS NO PERMIT IN DEPT RECORDS FOR THIS WORK ., OBTAIN PERMITNothing owed — awaiting certificate of correction
Two family frame · 3,000 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)