Over six families without stores
184 HAWTHORNE STREET
BROOKLYN · Prospect Lefferts Gardens-Wingate · BIN 3115701
💬 Discuss this project
2024Year Built
2.5Stories
C1Building Class
R6Zoning
9,128 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 116 AVENUE ASSOCIATES LLC · 3,180 sf lot · 2.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction77p · 1 filing · 20 docs
PenthouseUnder Construction80p · 1 filing · 20 docs
Floor 4Under Construction77p · 1 filing · 20 docs
Floor 3Under Construction81p · 1 filing · 20 docs
Floor 2Under Construction78p · 1 filing · 20 docs
Floor 1Under Construction79p · 2 filings · 20 docs
CellarUnder Construction83p · 1 filing · 20 docs
Site & exteriorUnder Construction104p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE CHIP PAINTING CONTRACTING6307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2023$795K—Private party → 116 AVENUE ASSOCIATES LLC— not available
08/16/2023$795K—Private party → 116 AVENUE ASSOCIATES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.410/27/2025
NIKOLAI KATZ ARCHITECT508/18/2025
KNF SERVICES CROP110/30/2024
BRIAN GOLDMAN, ARCHITECT209/12/2024
KCE CONSULTING ENGINEERING PLLC403/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2803/21/2026
AC EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCKENNEY CONSTRUCTION LLCGeneral Contractor2207/08/2026
RED BRICK PROPERTY MNGMTGeneral Contractor1507/08/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
APEX GROUP NY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161210/27/2025
Building Lifecycle
All (145)Filed (17)Permit Issued (21)Signed Off (11)Violation (12)Inspection (12)Objection (42)Special Inspection (30)
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2026
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-I1
02/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2025
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-S1
11/25/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/17/2025
Permit issued — Plumbing
B00959551-S1-PL
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/10/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/10/2025
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
11/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
11/10/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/10/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
10/27/2025
Filed — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-P6
10/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
10/22/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
10/22/2025
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/22/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
10/22/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/18/2025
Filed — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-P5
07/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/24/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/24/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/24/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/24/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/24/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/24/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
07/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/24/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
07/15/2025
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-S6
07/15/2025
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-S2
07/08/2025
Objection resolved — Addressed
07/07/2025
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-S4
06/20/2025
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-S7
06/18/2025
Filed — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-P3
06/13/2025
Objection resolved — Addressed
06/09/2025
Permit issued — General Construction
B00959551-I1-GC
05/28/2025
Signed off — New Building
PLUMBING & SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B00959551-I1
B00959551-S9
05/28/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
B00951072-I1
05/28/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
B01073884-I1
05/27/2025
Objection raised — Other
05/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Objection raised — Other
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC11/17/2025
DOB NOWGeneral ConstructionPermit IssuedMCKENNEY CONSTRUCTION LLC06/09/2025
DOB NOWGeneral ConstructionPermit IssuedMCKENNEY CONSTRUCTION LLC11/20/2024
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO11/01/2024
DOB NOWSupported ScaffoldSigned-offMCKENNEY CONSTRUCTION LLC11/01/2024
DOB NOWMechanical SystemsSigned-offMCKENNEY CONSTRUCTION LLC09/17/2024
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP07/03/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC06/21/2024
DOB NOWStructuralSigned-offMCKENNEY CONSTRUCTION LLC06/11/2024
DOB NOWGeneral ConstructionPermit IssuedMCKENNEY CONSTRUCTION LLC06/04/2024
DOB NOWFoundationSigned-offMCKENNEY CONSTRUCTION LLC05/31/2024
DOB NOWSupport of ExcavationSigned-offMCKENNEY CONSTRUCTION LLC05/31/2024
DOB NOWFoundationSigned-offMCKENNEY CONSTRUCTION LLC05/31/2024
DOB NOWConstruction FenceSigned-offMCKENNEY CONSTRUCTION LLC05/30/2024
DOB NOWStructuralSigned-offRED BRICK PROPERTY MNGMT05/13/2024
DOB NOWFoundationSigned-offRED BRICK PROPERTY MNGMT05/13/2024
DOB NOWGeneral ConstructionPermit IssuedRED BRICK PROPERTY MNGMT04/15/2024
DOB NOWFoundationSigned-offRED BRICK PROPERTY MNGMT04/10/2024
DOB NOWSupport of ExcavationSigned-offRED BRICK PROPERTY MNGMT04/10/2024
DOB NOWFull DemolitionSigned-offRED BRICK PROPERTY MNGMT01/04/2024
DOB NOWConstruction FenceSigned-offRED BRICK PROPERTY MNGMT10/31/2023
1 project · most recent 10/27/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/27/2025Permit IssuedMCKENNEY CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin 3MXS24RMVJUA 24,000 BTU · Heat Pump Outdoor ×4
4MXS36WMVJU9 36,000 BTU · Heat Pump Outdoor ×2
RXSQ48TBVJUB 49,500 BTU · Vrf Outdoor ×2
5MXS48WVJU9 48,500 BTU · Heat Pump Outdoor ×1
1 project · most recent 10/27/2025
Sprinkler System
FiledStatusContractorScope
10/27/2025Signed-offDOUG'S PLBG & HTG SERV COSprinkler System
1 project · most recent 10/27/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/27/2025Signed-offPLUMB-IT MECHANICAL INCGas, Storm, Water/Sanitary
3 projects · most recent 06/09/2025
General Wiring
FiledStatusContractorScope
06/09/2025CompleteAPPROVED ELECTRIC CORP.General Wiring
07/10/2024CompleteGRX EURO ELECTRIC CORP—
07/08/2024CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 10/27/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/27/2025Signed-offPLUMB-IT MECHANICAL INCSteel, Concrete, Masonry
1 project · most recent 10/27/2025
Scaffold
FiledStatusContractorScope
10/27/2025Signed-offPLUMB-IT MECHANICAL INCScaffold
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
11/10/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/10/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/10/2025Sprinkler SystemsFAHAD FATEHspecial
11/10/2025Seismic Isolation SystemsFAHAD FATEHspecial
11/10/2025Post-installed AnchorsFAHAD FATEHspecial
11/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
11/10/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/10/2025Maintenance informationFAHAD FATEHenergy_progress
11/10/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/22/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/22/2025Maintenance informationFAHAD FATEHenergy_progress
10/22/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/22/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/22/2025Sprinkler SystemsFAHAD FATEHspecial
10/22/2025Seismic Isolation SystemsFAHAD FATEHspecial
10/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
10/22/2025Post-installed AnchorsFAHAD FATEHspecial
10/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/24/2025Maintenance informationFAHAD FATEHenergy_progress
07/24/2025Fenestration air leakageFAHAD FATEHenergy_progress
07/24/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
07/24/2025Fenestration areasFAHAD FATEHenergy_progress
07/24/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/24/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/24/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 85.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/26/2026B00951072-I1Request digital key ↗
08/26/2026B00950746-I1Request digital key ↗
08/24/2026B01073884-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/08/2025322119088Open ↗
01/29/2024340908557Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/29/2024340908557Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00959551-P5Open ↗
08/13/2026B00959551-I1Open ↗
08/13/2026B00959551-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/08/2025322119088Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00959551-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026B01073884-P1Open ↗
08/24/2026B01073884-I1Open ↗
08/23/2026B00959551-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026B00959551-S2Open ↗
08/29/2026B00959551-S2Open ↗
08/27/2026B00959551-S6Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026B00959551-S2Open ↗
08/27/2026B00959551-S6Open ↗
08/26/2026B00959551-P2Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/29/2024340908557Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/29/2024340908557Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B00950746-I1Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00959551-P1Open ↗
08/13/2026B00959551-P2Open ↗
08/13/2026B00959551-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWater Cut-Off1
08/13/2026B00950746-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00950746-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00950746-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00950746-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/23/2026B00959551-P5Open ↗
08/23/2026B00959551-P2Open ↗
08/15/2026B00959551-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
04/16/2024340908557Open ↗
▸BISSTREET TREE CHECKLIST1
01/29/2024340908557Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00959551-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00959551-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00959551-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00950746-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00950746-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/08/2025322119088Open ↗
01/08/2025322119088Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/29/2024340908557Open ↗
▸BISEFILING COVER SHEET1
01/08/2025322119088Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/29/2024340908557Open ↗
▸Other Documents24
▸DOB NOWProperty Ownership Certification5
08/26/2026B00950746-I1Open ↗
08/23/2026B00959551-P2Open ↗
08/23/2026B00959551-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00959551-P1Open ↗
08/13/2026B00959551-I1Open ↗
08/13/2026B00959551-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00959551-P1Open ↗
08/13/2026B00959551-P5Open ↗
08/13/2026B00959551-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
04/16/2024340908557Open ↗
01/29/2024340908557Open ↗
▸DOB NOWFinal Survey2
08/15/2026B00959551-I1Open ↗
08/13/2026B00959551-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00959551-S4Open ↗
08/13/2026B00959551-S5Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/08/2025322119088Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
01/08/2025322119088Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00950746-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00950746-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00950746-I1Open ↗