← Back
Auto body / collision or auto repair
184 JAMAICA AVENUE
BROOKLYN · Cypress Hills · BIN 3086807
💬 Discuss this project
1930Year Built
1Stories
G2Building Class
R4Zoning
224 sfGross Floor Area
1Units
9 Open Violations 4 unresolved · 5 paperwork only ▸FDNY Report ↗
Auto body / collision or auto repair · Owner of record: 184 JAMAICA LLC · 1,440 sf lot · 0.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneralOther
Filed — no permit issued41p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
184 JAMAICA LLC603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2024$550K—— → —$2,455/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRATIK JAIN109/03/2026
TAREK M. ZEID, PE, PLLC403/18/2026
JMV ARCHITECT, PLLC107/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES603/21/2026
Building Lifecycle
All (100)Filed (6)Violation (9)Objection (55)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Addressed
09/15/2026
Objection resolved — Resolved
09/03/2026
Filed — New Building
Proposed Mechanical work type.
B01212240-S6
09/03/2026
Special inspection requirement — Sprinkler Systems
09/03/2026
Special inspection requirement — Standpipe Systems
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Addressed
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
04/28/2026
Objection raised — Other
04/09/2026
Objection resolved — Resolved
04/09/2026
Objection resolved — Addressed
04/09/2026
Special inspection requirement — Concrete - Precast
04/09/2026
Special inspection requirement — Concrete - Cast-In-Place
04/09/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
04/09/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/09/2026
Special inspection requirement — Subgrade Inspections
04/09/2026
Special inspection requirement — Structural Steel - Welding
04/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/09/2026
Special inspection requirement — Post-installed Anchors
04/09/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/09/2026
Special inspection requirement — Concrete – Prestressed
04/06/2026
Special inspection requirement — Underpinning
04/01/2026
Objection raised — Other
03/20/2026
Objection raised — Other
03/20/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Other
03/18/2026
Filed — Alteration
PROPOSED CONSTRUCTION FENCE. PLYWOOD FENCE PAINTED HUNTER GREEN. FOR DEMO GARAGE # B01273568 AND NB # B01212240.
B01372070-I1
03/16/2026
Filed — New Building
Proposed Mechanical work type.
B01212240-S1
03/14/2026
Filed — New Building
Proposed Mechanical work type.
B01212240-S2
03/11/2026
Objection resolved — Addressed
03/11/2026
Special inspection requirement — Masonry
03/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/11/2026
Special inspection requirement — Structural Cold-Formed Steel
03/11/2026
Special inspection requirement — Structural Steel - Details
02/09/2026
Objection resolved — Addressed
01/13/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
01/13/2026
Special inspection requirement — Demolition
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
10/07/2025
Objection raised — Other
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
Latest 60 of 100 events.
Nothing on file for this building.
2 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
10/30/2025CompleteWCK ELECTRIC CORP.General Wiring
1 project · most recent 09/03/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/03/2026——Steel, Concrete, Masonry
1 project · most recent 03/18/2026
Fence
FiledStatusContractorScope
03/18/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/03/2026Sprinkler Systems—special
09/03/2026Standpipe Systems—special
09/03/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Fire-Resistance Rated Construction—progress
08/03/2026Energy Code Compliance Inspections—progress
04/09/2026Concrete - Precast—special
04/09/2026Concrete - Cast-In-Place—special
04/09/2026Underpinning and alternate methods of support of buildings and adjacent property—special
04/09/2026Subsurface Conditions – Fill Placement & In-Place Density—special
04/09/2026Subgrade Inspections—special
04/09/2026Structural Steel - Welding—special
04/09/2026Structural Steel - High Strength Bolting—special
04/09/2026Structural Stability – Alterations of existing buildings—special
04/09/2026Post-installed Anchors—special
04/09/2026Excavations - Sheeting, Shoring, and Bracing—special
04/09/2026Concrete – Prestressed—special
04/06/2026Underpinning—special
03/11/2026Masonry—special
03/11/2026Excavations - Sheeting, Shoring, and Bracing—special
03/11/2026Structural Cold-Formed Steel—special
03/11/2026Structural Steel - Details—special
01/13/2026Structural Stability – Alterations of existing Buildings—special
01/13/2026Demolition—special
09/26/2025Electrical motors and elevators—energy_progress
Latest 25 of 42.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/15/2026B01372070-I1Request digital key ↗
08/15/2026B01212240-S1Request digital key ↗
08/14/2026B01212240-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01212240-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01212240-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B01372070-I1Open ↗
08/21/2026B01212240-I1Open ↗
08/21/2026B01212240-S1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWWater Cut-Off1
08/13/2026B01273568-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01273568-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01273568-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/15/2026B01212240-S1Open ↗
08/13/2026B01212240-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01273568-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01273568-I1Open ↗