Locations of Work
ArchitectureStructuralElectrical
Roof9p · 2 filings · 20 docs
Basement1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRESTIGE HOME DEVELOPMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/14/2021$3.0M—Private party → Private party$828/sf building
01/22/2015$2.3M—PRESTIGE HOME DEVELOPMENT CORP → Private party$643/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM ENGINEERING PC202/25/2026
URBAN INTEGRATIONS303/21/2025
SUNDHOLM ENGINEERING101/15/2025
LOWKEY ARCHITECTURE STUDIO PLLC101/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UNITED SAFETY CONSULTANTS303/21/2026
ANTHONY MORALI ARCHITECT PLLC403/21/2026
BROOKLYN SOLARWORKS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVANT-GRADE CONTRACTING GGeneral Contractor604/09/2026
SPRING SCAFFOLDING LLCGeneral Contractor307/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARUN CORP8842302/25/2026
TWIN PEAKS INC.317201/15/2025
Building Lifecycle
All (62)Filed (7)Permit Issued (8)Signed Off (6)Violation (9)Objection (20)Special Inspection (12)
06/08/2026
Signed off — Alteration
REPLACEMENT OF EXISTING ROOFS AND SUBSTRATE.INSTALLATION OF STRUCTURAL BEAMS ON MAIN ROOF. NOCHANGE OF USE OR EGRESS
B01144504-S1
03/23/2026
Signed off — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B01195263-I1
02/25/2026
Filed — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B01195263-P1
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
02/25/2026
Special inspection requirement — Final
CHRIS KIM
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRIS KIM
02/25/2026
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
12/10/2025
Signed off — Alteration
REPLACEMENT OF EXISTING ROOFS AND SUBSTRATE.INSTALLATION OF STRUCTURAL BEAMS ON MAIN ROOF. NOCHANGE OF USE OR EGRESS
B01144504-I1
11/25/2025
Violation issued (HPD, open)
I
10/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOLD AT THE FRONT ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO PAST THE MAIN ROOF PARAPET WALL AND THE REAR ELEVATION FROM THE TOP OF THE SI
B01195958-S2
10/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOLD AT THE FRONT ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO PAST THE MAIN ROOF PARAPET WALL AND THE REAR ELEVATION FROM THE TOP OF THE SI
B01195958-S1
10/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOLD AT THE FRONT ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO PAST THE MAIN ROOF PARAPET WALL AND THE REAR ELEVATION FROM THE TOP OF THE SI
B01195958-I1
07/10/2025
Permit issued — Structural
B01144504-S1-ST
07/10/2025
Permit issued — General Construction
B01144504-I1-GC
06/05/2025
Permit issued — Solar
B01195263-I1-SL
05/28/2025
Filed — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B01195263-I1
05/06/2025
Permit issued — Structural
B01144504-S1-ST
04/29/2025
Objection resolved — Addressed
04/17/2025
Permit issued — General Construction
B01144504-I1-GC
04/14/2025
Objection resolved — Addressed
03/27/2025
Objection resolved — Addressed
03/21/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOLD AT THE FRONT ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO PAST THE MAIN ROOF PARAPET WALL AND THE REAR ELEVATION FROM THE TOP OF THE SI
B01195958-S2
03/21/2025
Permit issued — Construction Fence
B01195958-S2-FN
03/21/2025
Permit issued — Supported Scaffold
B01195958-S1-SF
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOLD AT THE FRONT ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO PAST THE MAIN ROOF PARAPET WALL AND THE REAR ELEVATION FROM THE TOP OF THE SI
B01195958-S1
03/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PIPE SCAFFOLD AT THE FRONT ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO PAST THE MAIN ROOF PARAPET WALL AND THE REAR ELEVATION FROM THE TOP OF THE SI
B01195958-I1
03/17/2025
Permit issued — Sidewalk Shed
B01195958-I1-SH
03/17/2025
Objection resolved — Addressed
03/11/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
01/23/2025
Objection raised — Admin
01/23/2025
Objection raised — Admin
01/23/2025
Objection raised — Structural
01/23/2025
Objection raised — Structural
01/22/2025
Objection raised — Fire_Protection
01/22/2025
Objection raised — Fire_Protection
01/22/2025
Objection raised — Inspections
01/22/2025
Objection raised — Energy
01/22/2025
Objection raised — Scope
01/22/2025
Objection raised — Mechanical
01/15/2025
Filed — Alteration
REPLACEMENT OF EXISTING ROOFS AND SUBSTRATE.INSTALLATION OF STRUCTURAL BEAMS ON MAIN ROOF. NOCHANGE OF USE OR EGRESS
B01144504-S1
01/14/2025
Filed — Alteration
REPLACEMENT OF EXISTING ROOFS AND SUBSTRATE.INSTALLATION OF STRUCTURAL BEAMS ON MAIN ROOF. NOCHANGE OF USE OR EGRESS
B01144504-I1
12/04/2024
Violation issued (HPD, open)
I
11/26/2024
Special inspection requirement — Final
MAXIM KORNGOLD
11/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
11/26/2024
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
11/26/2024
Special inspection requirement — Masonry
MAXIM KORNGOLD
11/26/2024
Special inspection requirement — Structural Steel - Details
MAXIM KORNGOLD
11/26/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MAXIM KORNGOLD
11/26/2024
Special inspection requirement — Structural Steel - Welding
MAXIM KORNGOLD
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
11/27/2017
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/23/2015
Violation issued (HPD, closed)
I
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAVANT-GRADE CONTRACTING G07/10/2025
DOB NOWGeneral ConstructionSigned-offAVANT-GRADE CONTRACTING G07/10/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC06/05/2025
DOB NOWStructuralSigned-offAVANT-GRADE CONTRACTING G05/06/2025
DOB NOWGeneral ConstructionSigned-offAVANT-GRADE CONTRACTING G04/17/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC03/21/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/21/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/17/2025
BIS—ISSUEDRAPID CONST AND RENOVATIO08/20/2013
3 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteHESO ELECTRICAL INCGeneral Wiring
05/14/2025CompleteBROOKYLN SOLARWORKS, LLC—
03/05/2025CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 01/15/2025
Steel Concrete
FiledStatusContractorScope
01/15/2025Signed-offAVANT-GRADE CONTRACTING GSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/25/2026Fire-Resistant Penetrations and JointsCHRIS KIMspecial
02/25/2026Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
02/25/2026FinalCHRIS KIMprogress
02/25/2026Energy Code Compliance InspectionsCHRIS KIMprogress
02/25/2026Air barrier - visual inspectionCHRIS KIMenergy_progress
11/26/2024FinalMAXIM KORNGOLDprogress
11/26/2024Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
11/26/2024Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
11/26/2024MasonryMAXIM KORNGOLDspecial
11/26/2024Structural Steel - DetailsMAXIM KORNGOLDspecial
11/26/2024Structural Steel - High Strength BoltingMAXIM KORNGOLDspecial
11/26/2024Structural Steel - WeldingMAXIM KORNGOLDspecial
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01144504-S1Request digital key ↗
08/23/2026B01144504-I1Request digital key ↗
08/22/2026B01195958-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
01/15/2015320779877Open ↗
12/12/2013320779877Open ↗
12/04/2013320779877Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
11/07/2013320779877Open ↗
08/28/2013320779877Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/06/2015320779877Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026B01144504-S1Open ↗
08/26/2026B01144504-S1Open ↗
08/26/2026B01144504-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026B01195958-S2Open ↗
08/22/2026B01195958-S1Open ↗
08/22/2026B01195958-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
01/23/2015320779877Open ↗
01/23/2015320779877Open ↗
08/28/2013320779877Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026B01144504-S1Open ↗
08/22/2026B01195263-I1Open ↗
08/22/2026B01195263-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
12/12/2013320779877Open ↗
12/04/2013320779877Open ↗
08/24/2013320779877Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
03/10/2015320779877Open ↗
11/06/2014320779877Open ↗
10/22/2014320779877Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/12/2013320779877Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01195263-I1Open ↗
08/13/2026B01195263-P1Open ↗
08/13/2026B01144504-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/12/2013320779877Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/28/2013320779877Open ↗
07/12/2013320779877Open ↗
▸BISEN2 - As Built Energy Analysis1
01/23/2015320779877Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/23/2015320779877Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE2
01/15/2015320779877Open ↗
07/12/2013320779877Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
01/23/2015320779877Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/12/2013320779877Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01195263-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/23/2015320779877Open ↗
01/23/2015320779877Open ↗
07/12/2013320779877Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/12/2013320779877Open ↗
▸BISADDITIONAL INFORMATION1
12/18/2014320779877Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
07/12/2013320779877Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01144504-I1Open ↗