← Back
BRONX
1840 BURKE AVENUE
BRONX · BIN 2802349
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations ▸
Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 1Under Construction38p · 1 filing · 20 docs
1 job · most recent 05/15/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/15/2026Permit IssuedAAH CONTRUCTION CORPAir Conditioning Systems, Heating Systems
Cooling
Fujitsu AOU45RLXFZ - FUJITSU 45,000 BTU · Condensing Unit ×4
Heating
Dayton 804T21 DAYTON 25,600 BTU ×1
1 job · most recent 05/15/2026
Water/Sanitary
FiledStatusContractorScope
05/15/2026——Water/Sanitary
2 jobs · most recent 05/15/2026
Steel Concrete
FiledStatusContractorScope
05/15/2026Permit IssuedAAH CONTRUCTION CORPSteel
06/23/2025——Concrete
1 job · most recent 05/15/2026
Fence
FiledStatusContractorScope
05/15/2026Permit IssuedAAH CONTRUCTION CORPFence
Building Lifecycle
All (64)Filed (12)Permit Issued (3)Violation (2)Inspection (2)Objection (15)Special Inspection (30)
09/17/2026
Permit issued — Structural
X00878009-S4-GC-CX
08/04/2026
Violation issued (ECB, open)
Construction
08/04/2026
Violation issued (ECB, open)
Unknown
05/27/2026
Objection raised — Other
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2026
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-S7
04/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/26/2026
Permit issued — General Construction
X00878009-I1-GC
01/27/2026
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-P4
01/23/2026
Permit issued — Construction Fence
X00878009-S6-FN
01/22/2026
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-S6
10/07/2025
Objection resolved — Addressed
09/24/2025
Objection raised — Structural
09/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES WILSON
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
09/24/2025
Special inspection requirement — Footing and Foundation
JAMES WILSON
09/24/2025
Special inspection requirement — Final
JAMES WILSON
09/24/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JAMES WILSON
09/24/2025
Special inspection requirement — Subgrade Inspections
JAMES WILSON
09/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
09/24/2025
Special inspection requirement — Concrete - Cast-In-Place
JAMES WILSON
09/24/2025
Special inspection requirement — Structural Steel - Details
JAMES WILSON
09/24/2025
Special inspection requirement — Structural Steel - Welding
JAMES WILSON
09/24/2025
Special inspection requirement — Structural Cold-Formed Steel
JAMES WILSON
09/22/2025
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-P3
09/22/2025
Special inspection requirement — Subgrade Inspections
09/22/2025
Special inspection requirement — Concrete - Cast-In-Place
09/22/2025
Special inspection requirement — Structural Cold-Formed Steel
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/22/2025
Special inspection requirement — Structural Steel - Details
09/22/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/22/2025
Special inspection requirement — Structural Steel - Welding
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
09/22/2025
Special inspection requirement — Final
09/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/22/2025
Special inspection requirement — Footing and Foundation
09/19/2025
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-P1
09/19/2025
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-P2
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
09/16/2025
Special inspection requirement — Mechanical Systems
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/16/2025
Special inspection requirement — Maintenance information
09/16/2025
Special inspection requirement — Shutoff dampers
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
06/23/2025
Filed — Alteration
Construction of Foundations for Scoreboard and light poles. Reinforcing the existing retaining wall to support a new climbing wall in the playground.
X01096001-P1
03/03/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Admin
01/16/2025
Objection resolved — Addressed
12/13/2024
Objection raised — Admin
12/02/2024
Objection resolved — Addressed
11/15/2024
Objection raised — Admin
11/08/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Scope
08/26/2024
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-S1
08/20/2024
Filed — Alteration
Construction of Foundations for Scoreboard and light poles. Reinforcing the existing retaining wall to support a new climbing wall in the playground.
X01096001-I1
03/04/2024
Filed — Alteration CO
THE REMOVAL OF ALL EXISTING HVAC EQUIPMENT ANDDUCTWORK. INSTALL NEW FANS, VENTS AND DUCTWORK FOR VENTILATION.INSTALL NEW HEAT PUMP AND ENERGY RECOVERY SYSTEMS FOR HEATING ANDCOOLING OF INTERIOR SPACES FOR YEAR-ROUND USE.
X00878009-S3
Latest 60 of 64 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SEAN P. CUNNINGHAM PE, PC105/15/2026
DEPARTMENT OF PARKS & RECREATIONS701/27/2026
SELF EMPLOYEE101/22/2026
MG MCLAREN ENGINEERING GROUP206/23/2025
NYC PARKS DEPT107/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DEPT OF PARKS & RECREATION603/21/2026
M G MCLAREN ENGINEERING403/21/2026
SELF EMPLOYED103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAH CONTRUCTION CORPGeneral Contractor309/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438501/27/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAAH CONTRUCTION CORP09/17/2026
DOB NOWGeneral ConstructionPermit IssuedAAH CONTRUCTION02/26/2026
DOB NOWConstruction FencePermit IssuedAAH CONTRUCTION01/23/2026
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/30/2026Excavations - Sheeting, Shoring, and Bracing—special
09/24/2025Fire-Resistance Rated ConstructionJAMES WILSONprogress
09/24/2025Energy Code Compliance InspectionsJAMES WILSONprogress
09/24/2025Footing and FoundationJAMES WILSONprogress
09/24/2025FinalJAMES WILSONprogress
09/24/2025Structural Steel - High Strength BoltingJAMES WILSONspecial
09/24/2025Subgrade InspectionsJAMES WILSONspecial
09/24/2025Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
09/24/2025Concrete - Cast-In-PlaceJAMES WILSONspecial
09/24/2025Structural Steel - DetailsJAMES WILSONspecial
09/24/2025Structural Steel - WeldingJAMES WILSONspecial
09/24/2025Structural Cold-Formed SteelJAMES WILSONspecial
09/22/2025Subgrade Inspections—special
09/22/2025Concrete - Cast-In-Place—special
09/22/2025Structural Cold-Formed Steel—special
09/22/2025Structural Stability – Alterations of existing buildings—special
09/22/2025Structural Steel - Details—special
09/22/2025Structural Steel - High Strength Bolting—special
09/22/2025Structural Steel - Welding—special
09/22/2025Energy Code Compliance Inspections—progress
09/22/2025Final—progress
09/22/2025Fire-Resistance Rated Construction—progress
09/22/2025Footing and Foundation—progress
09/19/2025Energy Code Compliance Inspections—progress
09/16/2025Mechanical Systems—special
Latest 25 of 48.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/17/2026X00878009-I1Request digital key ↗
08/17/2026X00878009-P4Request digital key ↗
08/17/2026X00878009-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X00878009-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature10
08/25/2026X00878009-I1Open ↗
08/25/2026X00878009-I1Open ↗
08/25/2026X00878009-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/17/2026X00878009-S7Open ↗
08/17/2026X00878009-P4Open ↗
08/17/2026X00878009-S6Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/25/2026X00878009-I1Open ↗
08/22/2026X00878009-S4Open ↗
08/22/2026X00878009-S4Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026X00878009-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00878009-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/17/2026X00878009-S6Open ↗
08/17/2026X00878009-S4Open ↗
08/17/2026X00878009-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs22
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/15/2026X00878009-S7Open ↗
08/13/2026X00878009-S4Open ↗
08/13/2026X00878009-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/15/2026X00878009-S7Open ↗
08/13/2026X00878009-P1Open ↗
08/13/2026X00878009-S4Open ↗
Showing 3 of 10 on file for this type
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026X00878009-S4Open ↗
08/13/2026X00878009-P3Open ↗
08/13/2026X00878009-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00878009-P3Open ↗
08/13/2026X00878009-I1Open ↗
08/13/2026X00878009-S4Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026X01096001-P1Open ↗
08/13/2026X01096001-I1Open ↗