← Back
BuildNYC
Elevator apt, miscellaneous
Johnson (NYCHA)
1840 LEXINGTON AVENUE · BIN 1082330
💬 Discuss this project
1947Year Built
14Stories
D9Building Class
R7-2Zoning
642,489 sfGross Floor Area
724Units
LL97 Covered14 Active Violations 7 unresolved · 7 paperwork only 1 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, miscellaneous · Owner of record: NYC Housing Authority · 262,446 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
CellarNYCHA - Johnson Houses Boiler ReplacementUnder Construction50p · 2 filings · 20 docs
Site & exteriorNYCHA - Johnson Houses Boiler ReplacementUnder Construction49p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rand Engineering & Architecture, DP409/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering & Arch803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kordun ConstructionGeneral Contractor1307/08/2026
Kordun ConstructionPlumbing507/08/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
Trinity Metro ElectricalElectrical103/22/2026
Tri-State Electrical & Mechanical IElectrical103/22/2026
RNW ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106509/04/2025
Building Lifecycle
All (104)Filed (4)Permit Issued (13)Facade (FISP) (12)Violation (22)Inspection (5)Objection (18)Special Inspection (30)
05/29/2026
Permit issued — Mechanical Systems
M00460158-I1-GC
05/29/2026
Permit issued — General Construction
M00460158-I1-MS
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/20/2025
Permit issued — Plumbing
M00460161-I1-PL
11/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
10/23/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Scope
09/15/2025
Objection raised — Plumbing
09/04/2025
Filed — Alteration
Plumbing related work in conjunction with Boiler Replacement. Installation of new hot water heaters, new gas service lines and plumbing components.
M00460161-P1
07/31/2025
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
07/17/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Air barrier - visual inspection
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Chimneys and vents
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
07/11/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
06/16/2025
Filed — Alteration
General construction and mechanical related work in conjunction w/ Boiler replacement. Modification to existing tank room to accommodate installation of new hot water heaters for heating and new chimney steel liner inside of an existing masonry chimney.
M00460158-P2
04/29/2025
Permit issued — Mechanical Systems
M00460158-I1-MS
04/10/2025
Permit issued — Mechanical Systems
M00460158-I1-GC
11/20/2024
Permit issued — Plumbing
M00460161-I1-PL
11/04/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
11/04/2024
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
04/17/2024
Permit issued — General Construction
M00460158-I1-MS
04/11/2024
Violation issued (ECB, open)
Local Law
04/09/2024
Permit issued — Mechanical Systems
M00460158-I1-GC
11/20/2023
Permit issued — General Construction
M00460158-I1-GC
11/20/2023
Permit issued — Plumbing
M00460161-I1-PL
04/21/2023
Permit issued — Plumbing
M00460161-I1-PL
04/18/2023
Permit issued — General Construction
M00460158-I1-MS
04/18/2023
Permit issued — General Construction
M00460158-I1-GC
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2021
Objection raised — Scope
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedKordun Construction05/29/2026
DOB NOWGeneral ConstructionPermit IssuedKordun Construction05/29/2026
DOB NOWPlumbingSigned-offKordun Construction11/20/2025
DOB NOWMechanical SystemsPermit IssuedKordun Construction04/29/2025
DOB NOWMechanical SystemsPermit IssuedKordun Construction04/10/2025
DOB NOWPlumbingSigned-offKordun Construction11/20/2024
DOB NOWGeneral ConstructionPermit IssuedKordun Construction04/17/2024
DOB NOWMechanical SystemsPermit IssuedKordun Construction04/09/2024
DOB NOWGeneral ConstructionPermit IssuedKordun Construction11/20/2023
DOB NOWPlumbingSigned-offKordun Construction11/20/2023
DOB NOWPlumbingSigned-offKordun Construction04/21/2023
DOB NOWGeneral ConstructionPermit IssuedKordun Construction04/18/2023
DOB NOWGeneral ConstructionPermit IssuedKordun Construction04/18/2023
BISOTISSUEDNeelam Construction08/01/2017
BISEQISSUEDTalico Contracting03/29/2017
BISEQISSUEDNeelam Construction03/29/2017
BISOTISSUEDNeelam Construction08/03/2016
BISOTISSUEDNeelam Construction07/18/2016
BISEQISSUEDNeelam Construction03/29/2016
BISEQISSUEDTalico Contracting03/18/2016
BISOTISSUEDTycoon Construction02/19/2016
BISOTISSUEDTycoon Construction01/21/2015
BISPLISSUEDDanco09/22/2014
BISPLISSUEDG & L Plumbing Co01/03/2013
BISEQISSUEDNavtech Construction03/30/2012
BISEQISSUEDNavtech Construction01/13/2012
BISOTISSUEDBeys Specialty12/28/2011
BISOTISSUEDBeys Specialty12/28/2011
BISEQISSUEDBeys Specialty12/28/2011
BISPLISSUEDG & L Plumbing Co07/27/2011
BISEQISSUEDMetropolitan Enterprises05/24/2011
BISEQISSUEDNavtech Construction03/24/2011
BISEQISSUEDBeys Specialty12/30/2010
BISOTISSUEDBeys Specialty12/30/2010
BISOTISSUEDBeys Specialty12/10/2010
BISOTISSUEDBeys Specialty11/05/2010
BISEQISSUEDMetropolitan Enterprises08/19/2010
BISOTISSUEDBeys Specialty08/10/2010
BISOTISSUEDBeys Specialty07/21/2010
BISPLISSUEDG & L Plumbing Co07/09/2010
+ 15 more permits on file
1 project · most recent 06/16/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2025Permit IssuedKordun ConstructionVentilation Systems
Ventilation
Us Draft ISAF12 1,105 CFM ×2
TRV11 970 CFM · Exhaust Fan ×2
1 project · most recent 09/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/04/2025Signed-offKordun ConstructionGas, Water/Sanitary
11 projects · most recent 12/05/2025
General Wiring
FiledStatusContractorScope
12/05/2025Permit IssuedTrinity Metro ElectricalGeneral Wiring
07/24/2024CompleteRNW ElectricGeneral Wiring
10/05/2021CompleteGilston Electrical ContngGeneral Wiring
04/14/2021CompleteMac Fhionnghaile & SonsGeneral Wiring
04/12/2021CancelledMac Fhionnghaile & SonsGeneral Wiring
04/05/2021CompleteTri-State Electrical & Mechanical IGeneral Wiring
03/31/2021CompleteTri-State Electrical & Mechanical IGeneral Wiring
03/09/2021CompleteMac Fhionnghaile & SonsGeneral Wiring
09/12/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
09/10/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
07/10/2019CompleteMac Fhionnghaile & SonsGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
10/31/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/31/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/31/2025Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
10/31/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
10/31/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
10/31/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
10/31/2025Maintenance informationGEORGE GHEBRYALenergy_progress
07/31/2025Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
07/31/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/31/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
07/31/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
07/31/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
07/31/2025Maintenance informationGEORGE GHEBRYALenergy_progress
07/31/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
07/11/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
07/11/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
07/11/2025Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
07/11/2025Maintenance informationGEORGE GHEBRYALenergy_progress
07/11/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
07/11/2025Interior lighting powerGEORGE GHEBRYALenergy_progress
07/11/2025Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
07/11/2025MasonryGEORGE GHEBRYALspecial
07/11/2025Post-installed AnchorsGEORGE GHEBRYALspecial
07/11/2025Chimneys and ventsGEORGE GHEBRYALspecial
07/11/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
Latest 25 of 42.
▾Documents — 224 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - General Construction2
08/23/2026M00460158-P2Request digital key ↗
08/15/2026M00460158-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00460161-I1Request digital key ↗
08/15/2026M00460161-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/23/2026M00460158-P2Request digital key ↗
08/15/2026M00460158-I1Request digital key ↗
▸Applications & Permits51
▸BISWORK PERMIT APPLICATION29
08/08/2017140522691Open ↗
04/06/2017140475439Open ↗
04/05/2017140469507Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
05/25/2017140469507Open ↗
05/11/2017140475439Open ↗
05/11/2017140469507Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/29/2013120355043Open ↗
▸Seals & Professional Certifications68
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
11/27/2017140522691Open ↗
11/27/2017140522691Open ↗
11/16/2017140469507Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
09/15/2010120467002Open ↗
08/20/2010120445143Open ↗
07/28/2010120330828Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00460161-I1Open ↗
09/02/2026M00460161-I1Open ↗
09/02/2026M00460158-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
09/15/2010120467002Open ↗
08/20/2010120445143Open ↗
06/29/2010120394572Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M00460161-I1Open ↗
09/02/2026M00460158-I1Open ↗
09/02/2026M00460158-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/16/2016140522691Open ↗
03/28/2016140475439Open ↗
03/17/2016140469507Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/16/2016140522691Open ↗
03/28/2016140475439Open ↗
03/17/2016140469507Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
07/16/2016140522691Open ↗
03/28/2016140475439Open ↗
03/17/2016140469507Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00460161-I1Open ↗
08/23/2026M00460158-I1Open ↗
08/13/2026M00460161-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING6
09/22/2014140255042Open ↗
09/28/2012120330828Open ↗
09/25/2012120330828Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
01/14/2013120330828Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
05/11/2017140475439Open ↗
07/16/2016140522691Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00460161-I1Open ↗
08/15/2026M00460158-I1Open ↗
08/13/2026M00460161-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
09/03/2026M00460161-I1Open ↗
08/15/2026M00460158-I1Open ↗
08/13/2026M00460158-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
06/29/2010120394572Open ↗
05/15/2010120355043Open ↗
04/21/2010120326566Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/16/2016140522691Open ↗
09/22/2014140255042Open ↗
05/24/2010120330828Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00460158-I1Open ↗
08/13/2026M00460161-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/05/2014140235939Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/20/2010120445143Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/18/2016140522691Open ↗
07/16/2016140522691Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/27/2017140522691Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/16/2016140522691Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/18/2016140522691Open ↗
07/16/2016140522691Open ↗
03/28/2016140475439Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/10/2010120467002Open ↗
08/02/2010120330828Open ↗
04/23/2013120330828Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
12/10/2010120467002Open ↗
07/27/2010120330828Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
11/27/2017140522691Open ↗
11/16/2017140469507Open ↗
10/11/2017140475439Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
09/15/2010120467002Open ↗
08/20/2010120445143Open ↗
06/29/2010120394572Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
09/03/2026M00460161-I1Open ↗
08/15/2026M00460158-I1Open ↗
08/13/2026M00460161-P1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/02/2013120326566Open ↗
07/02/2013120394572Open ↗
12/30/2009120234077Open ↗
▸BISSHED LETTER3
04/05/2012120394572Open ↗
01/23/2012120326566Open ↗
05/05/2011120394572Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
11/27/2017140522691Open ↗
07/16/2016140522691Open ↗
01/13/2015140255042Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/15/2010120467002Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET7
09/15/2010120467002Open ↗
08/20/2010120445143Open ↗
06/29/2010120394572Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
05/30/2017140475439Open ↗
05/25/2017140469507Open ↗
05/25/2017140475439Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/16/2016140522691Open ↗
03/28/2016140475439Open ↗
03/17/2016140469507Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
11/27/2017140522691Open ↗
11/16/2017140469507Open ↗
10/11/2017140475439Open ↗
▸Other Documents1
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
08/05/2014140235939Open ↗