← Back
BuildNYC
One story retail building
1842 HYLAN BOULEVARD
STATEN ISLAND · BIN 5052954
💬 Discuss this project
1958Year Built
1Stories
K1Building Class
R3-2Zoning
3,010 sfGross Floor Area
2Units
0 Active Violations 2 likely answered ▸FDNY Report ↗
One story retail building · Owner of record: 1840 Hylan · 4,847 sf lot · 0.62 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Boulevard Cleaners1p · 1 filing · 3 docs
Filed — no permit issuedAdd second floor residential second floor14p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1838 Hylan110/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Baalbaki & Associates Engineering109/27/2026
HI Tech103/16/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wasoff Plumbing & Utility CoPlumbing107/08/2026
Building Lifecycle
All (29)Filed (2)Permit Issued (1)Violation (10)Special Inspection (16)
09/27/2026
Filed — Alteration CO
PROJECT TO ADD A SECOND FLOOR RESIDENTIAL SECOND FLOOR
S01463126-I1
09/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/24/2026
Special inspection requirement — Energy Code Compliance Inspections
09/22/2026
Special inspection requirement — Structural Cold-Formed Steel
09/22/2026
Special inspection requirement — Structural Steel - Details
09/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/22/2026
Special inspection requirement — Fenestration air leakage
09/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/22/2026
Special inspection requirement — Fenestration areas
09/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/21/2026
Special inspection requirement — Mechanical Systems
09/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/21/2026
Special inspection requirement — Final
09/21/2026
Special inspection requirement — Footing and Foundation
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2022
Permit issued — Boiler Equipment
S00668896-I1-BE
03/16/2022
Filed — Alteration
REPLACEMENT OF BOILER. NO DISTURBANCE OF EXISTING BUILDING
S00668896-I1
12/16/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
07/20/2010
Violation issued (ECB, closed)
Boilers
11/21/2007
Violation issued (ECB, closed)
Construction
11/21/2007
Violation issued (ECB, closed)
Construction
05/09/2007
Violation issued (ECB, closed)
Boilers
07/07/1992
Violation issued (ECB, closed)
Construction
08/08/1988
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedWasoff Plumbing & Utility Co03/23/2022
BISBLISSUEDAll-Rite Plumbing02/09/1999
BISPLISSUEDAll-Rite Plumbing02/09/1999
1 project · most recent 09/27/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/27/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-8C60NA 120,000 BTU · Condensing Unit ×2
Ventilation
Breezcreenbuilder G80 80 CFM · Exhaust Fan ×4
1 project · most recent 09/27/2026
Steel
FiledStatusContractorScope
09/27/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/26/2026Tenant Protection Plan Compliance—special
09/24/2026Fire-Resistant Penetrations and Joints—special
09/24/2026Fire-Resistance Rated Construction—progress
09/24/2026Energy Code Compliance Inspections—progress
09/22/2026Structural Cold-Formed Steel—special
09/22/2026Structural Steel - Details—special
09/22/2026HVAC-R and service water heating equipment—energy_progress
09/22/2026Fenestration air leakage—energy_progress
09/22/2026Fenestration and door U-factor and product ratings—energy_progress
09/22/2026Fenestration areas—energy_progress
09/22/2026HVAC-R and service water heating system controls—energy_progress
09/22/2026HVAC-R and service water piping design and insulation—energy_progress
09/21/2026Mechanical Systems—special
09/21/2026Structural Stability – Alterations of existing buildings—special
09/21/2026Final—progress
09/21/2026Footing and Foundation—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Boulevard CleanersPersonal servicesFloor 1
Project S00668896 Alteration · Permit Entire · 03/16/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026S00668896-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
10/04/2026S01463126-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
10/04/2026S01463126-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
10/04/2026S01463126-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/04/2026S01463126-I1Open ↗
08/24/2026S00668896-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
10/04/2026S01463126-I1Open ↗
08/24/2026S00668896-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
10/04/2026S01463126-I1Open ↗
▸DOB NOWPlot Diagram1
10/04/2026S01463126-I1Open ↗