← Back
Two stories - detached, small or mid-size
1843 RYDER STREET
BROOKLYN · BIN 3239345
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3-2Zoning
1,204 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,300 sf lot · 0.52 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2016$665K—— → —$552/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI106/15/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841106/15/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/06/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
B01415899-I1
06/17/2026
Permit issued — Solar
B01415899-I1-SL
06/15/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
B01415899-I1
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
06/11/2026
Special inspection requirement — Final
ROBERT MASONE
06/11/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC06/17/2026
1 project · most recent 06/11/2026
FiledStatusContractorScope
06/11/2026CompleteNY SOLAR ELECTRICAL LLC—
1 project · most recent 06/15/2026
FiledStatusContractorScope
06/15/2026Signed-offNYSS LLC24 panels, 10.56 kw, 1,474 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/11/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/11/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
06/11/2026Energy Code Compliance InspectionsROBERT MASONEprogress
06/11/2026FinalROBERT MASONEprogress
06/11/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01415899-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B01415899-I1Open ↗
09/02/2026B01415899-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01415899-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01415899-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01415899-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026B01415899-I1Open ↗