← Back
Three families
1844 ANDREWS AVENUE SOUTH
BRONX · BIN 2009039
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
4,312 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸
Three families · Owner of record: 1844 BX REALTY LLC · 3,330 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
Floor 2Under Construction1p · 1 filing · 8 docs
Floor 1Under Construction1p · 1 filing · 8 docs
Sub-BasementUnder Construction1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1844 BX REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/23/2025$1.2M—— → —$283/sf building
07/26/2018$670K—— → —$155/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL SOLUTIONS304/14/2026
COBBLE COURT ENGINEERING101/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUEST HOME IMPROVEMENT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUEST HOME IMPROVEMENT INGeneral Contractor104/09/2026
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL SOLUTIONS3959304/14/2026
COBBLE COURT ENGINEERING7825101/27/2026
Building Lifecycle
All (45)Filed (4)Permit Issued (2)Violation (15)Inspection (5)Objection (11)Special Inspection (8)
04/29/2026
Violation issued (HPD, open)
A
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jorge Lee
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Jorge Lee
04/14/2026
Filed — Alteration
RELOCATION OF KITCHEN AND BATHROOM IN BASEMENT, RELOCATE GAS METER. INSTALLATION OF WATER HEATER AND TANKLESS WATER BOILER. RENOVATE KITCHENS AND CONSTRUCTION OF NEW BATHROOM ON FIRST AND SECOND FLOOR
X01265272-P1
04/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2026
Permit issued — Solar
X01351631-I1-SL
01/27/2026
Filed — Alteration
X01351631-I1
12/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/20/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
10/16/2025
Objection raised — Admin
10/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2025
Objection resolved — Resolved
08/29/2025
Objection resolved — Resolved
08/25/2025
Objection raised — Admin
08/25/2025
Objection raised — Cost
08/20/2025
Permit issued — Plumbing
X01265272-I1-PL
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Fire_Protection
08/11/2025
Objection raised — Admin
08/11/2025
Objection raised — Scope
08/07/2025
Filed — Alteration
RELOCATION OF KITCHEN AND BATHROOM IN BASEMENT, RELOCATE GAS METER. INSTALLATION OF WATER HEATER AND TANKLESS WATER BOILER. RENOVATE KITCHENS AND CONSTRUCTION OF NEW BATHROOM ON FIRST AND SECOND FLOOR
X01265272-I1
08/07/2025
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 3 FAMILY DWELLING. REMOVE INTERIOR STAIR AND PROVIDE FRONT ENTRANCE AT BASEMENT LEVEL. INSTALL REAR BALCONY AND SECOND MEANS OF EGRESS FOR FIRST AND SECON FLOOR. NEW BATHROOMS, PARTITIONS AND INTERIOR FINISHES.
X01265180-I1
08/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jorge Lee
08/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jorge Lee
08/01/2025
Special inspection requirement — Interior lighting power
Jorge Lee
08/01/2025
Special inspection requirement — Insulation placement and R values
Jorge Lee
08/01/2025
Special inspection requirement — Lighting in dwelling units
Jorge Lee
08/01/2025
Special inspection requirement — Permanent certificate
Jorge Lee
06/04/2025
Violation issued (HPD, open)
A
04/02/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, open)
C
03/08/2022
Violation issued (HPD, open)
C
02/16/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedQUEST HOME IMPROVEMENT IN02/03/2026
DOB NOWPlumbingPermit IssuedIPS PLUMBING CORP08/20/2025
1 project · most recent 04/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/14/2026Permit IssuedIPS PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026CompleteLUNA NYC ELECTRIC CORP—
07/11/2025Permit IssuedTRIPLE H ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/27/2026Fire-Resistant Penetrations and JointsJorge Leespecial
04/27/2026Energy Code Compliance InspectionsJorge Leeprogress
08/01/2025Structural Stability – Alterations of existing buildingsJorge Leespecial
08/01/2025Fire-Resistant Penetrations and JointsJorge Leespecial
08/01/2025Interior lighting powerJorge Leeenergy_progress
08/01/2025Insulation placement and R valuesJorge Leeenergy_progress
08/01/2025Lighting in dwelling unitsJorge Leeenergy_progress
08/01/2025Permanent certificateJorge Leeenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026X01351631-I1Request digital key ↗
08/17/2026X01265272-P1Request digital key ↗
08/17/2026X01265272-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01351631-I1Open ↗
08/17/2026X01265272-P1Open ↗
08/13/2026X01265272-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026X01265272-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X01265272-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026X01351631-I1Open ↗
08/17/2026X01265272-P1Open ↗
08/13/2026X01265272-I1Open ↗