← Back
BuildNYC
Single or multiple dwelling with stores or offices
1844 BATH AVENUE
BROOKLYN · Bath Beach · BIN 3168656
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R5Zoning
7,174 sfGross Floor Area
6Units
Rent Stabilized49 Active Violations 47 unresolved · 2 paperwork only 4 old, status unconfirmed ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 3,692 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarM. Spinelli PLB & HTG3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chen Sue IL Loan Department 2103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J&R Design and Inspection305/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 338603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VMC Plumbing & HeatingPlumbing207/08/2026
Farella MichaelElectrical103/21/2026
Farella ElectricElectrical103/21/2026
Wise Electric SolutionsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R Design and Inspection6637305/27/2022
Building Lifecycle
All (77)Filed (3)Permit Issued (2)Signed Off (1)Violation (60)Inspection (1)Special Inspection (10)
01/28/2026
Violation issued (HPD, open)
C
01/28/2026
Violation issued (HPD, open)
C
01/28/2026
Violation issued (HPD, open)
C
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
A
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
C
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
06/07/2022
Signed off — Alteration
TO FILE BOILER WORK TYPE AS PER PLAN IN CONJUNCTION WITH PLUMBING WORK#B00627494. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00626278-I1
05/31/2022
Special inspection requirement — Heating Systems
Robert Truskosky
05/31/2022
Special inspection requirement — Maintenance information
Robert Truskosky
05/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
05/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
05/27/2022
Filed — Alteration
TO FILE BOILER WORK TYPE AS PER PLAN IN CONJUNCTION WITH PLUMBING WORK#B00627494. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00626278-P1
05/27/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
12/22/2021
Permit issued — Boiler Equipment
B00626278-I1-BE
12/17/2021
Permit issued — Plumbing
B00627494-I1-PL
12/01/2021
Filed — Alteration
TO FILE BOILER WORK TYPE AS PER PLAN IN CONJUNCTION WITH PLUMBING WORK#B00627494. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00626278-I1
12/01/2021
Filed — Alteration
INTERIOR RENOVATION ON EXIST. MIX-USED HOUSE WITH, REPLACE/NEW H.W.H AND BOILER AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00627494-I1
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
11/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
11/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
11/09/2021
Special inspection requirement — Maintenance information
Robert Truskosky
11/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
11/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
12/13/2019
Violation issued (HPD, closed)
C
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, closed)
C
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
B
12/13/2019
Violation issued (HPD, open)
B
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
B
12/13/2019
Violation issued (HPD, open)
C
11/15/2018
Violation issued (ECB, open)
Construction
10/15/2018
Violation issued (HPD, closed)
I
06/01/2018
Violation issued (HPD, open)
A
06/01/2018
Violation issued (HPD, open)
B
06/01/2018
Violation issued (HPD, open)
B
06/01/2018
Violation issued (HPD, open)
B
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offM. Spinelli PLB & Heating12/22/2021
DOB NOWPlumbingPermit IssuedM. Spinelli PLB & Heating12/17/2021
BISBLISSUEDQMB Plumbing & Heating03/02/2005
BISPLISSUEDQMB Plumbing & Heating03/02/2005
BISPLISSUEDAmok09/03/1992
BISMHISSUEDAmok09/03/1992
BISBLISSUEDAmok09/03/1992
1 project · most recent 12/01/2021
Gas
FiledStatusContractorScope
12/01/2021Permit IssuedVMC Plumbing & HeatingGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/27/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/31/2022Heating SystemsRobert Truskoskyspecial
05/31/2022Maintenance informationRobert Truskoskyenergy_progress
05/31/2022HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
05/31/2022HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
11/09/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
11/09/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
11/09/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
11/09/2021Maintenance informationRobert Truskoskyenergy_progress
11/09/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
11/09/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
M. Spinelli PLB & HTGIndustrial / WarehouseCellar
Project B00626278 Alteration · LOC Issued · 12/01/2021
Project B00627494 Alteration · Permit Entire · 12/01/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00627494-I1Request digital key ↗
08/31/2026B00626278-P1Request digital key ↗
08/31/2026B00626278-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B00627494-I1Open ↗
09/02/2026B00627494-I1Open ↗
09/02/2026B00627494-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00626278-I1Open ↗
08/31/2026B00626278-P1Open ↗
08/13/2026B00627494-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00627494-I1Open ↗
08/24/2026B00626278-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00626278-P1Open ↗
08/31/2026B00626278-I1Open ↗
08/13/2026B00627494-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00626278-I1Open ↗