← Back
Single or multiple dwelling with stores or offices
1844 BATH AVENUE
BROOKLYN · BIN 3168656
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R5Zoning
7,174 sfGross Floor Area
6Units
Rent Stabilized56 Open Violations 54 unresolved · 2 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 3,692 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHEN SUE IL LOAN DEPT. 2-103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J&R DESIGN AND INSPECTION CORP.305/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VMC PLUMBING & HEATING INPlumbing207/08/2026
FARELLA MICHAELElectrical103/21/2026
MICHAEL FARELLAElectrical103/21/2026
ROOPCHAND SINGHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637305/27/2022
Building Lifecycle
All (77)Filed (3)Permit Issued (2)Signed Off (1)Violation (60)Inspection (1)Special Inspection (10)
01/28/2026
Violation issued (HPD, open)
C
01/28/2026
Violation issued (HPD, open)
C
01/28/2026
Violation issued (HPD, open)
C
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, closed)
A
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
C
04/05/2024
Violation issued (HPD, open)
A
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
06/07/2022
Signed off — Alteration
TO FILE BOILER WORK TYPE AS PER PLAN IN CONJUNCTION WITH PLUMBING WORK#B00627494. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00626278-I1
05/31/2022
Special inspection requirement — Heating Systems
Robert Truskosky
05/31/2022
Special inspection requirement — Maintenance information
Robert Truskosky
05/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
05/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
05/27/2022
Filed — Alteration
TO FILE BOILER WORK TYPE AS PER PLAN IN CONJUNCTION WITH PLUMBING WORK#B00627494. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00626278-P1
05/27/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
12/22/2021
Permit issued — Boiler Equipment
B00626278-I1-BE
12/17/2021
Permit issued — Plumbing
B00627494-I1-PL
12/01/2021
Filed — Alteration
TO FILE BOILER WORK TYPE AS PER PLAN IN CONJUNCTION WITH PLUMBING WORK#B00627494. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00626278-I1
12/01/2021
Filed — Alteration
INTERIOR RENOVATION ON EXIST. MIX-USED HOUSE WITH, REPLACE/NEW H.W.H AND BOILER AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00627494-I1
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
11/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
11/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
11/09/2021
Special inspection requirement — Maintenance information
Robert Truskosky
11/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
11/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
12/13/2019
Violation issued (HPD, closed)
C
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
B
12/13/2019
Violation issued (HPD, open)
B
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, closed)
C
12/13/2019
Violation issued (HPD, open)
C
12/13/2019
Violation issued (HPD, open)
A
12/13/2019
Violation issued (HPD, open)
B
12/13/2019
Violation issued (HPD, open)
A
11/15/2018
Violation issued (ECB, open)
Construction
10/15/2018
Violation issued (HPD, closed)
I
06/01/2018
Violation issued (HPD, open)
B
06/01/2018
Violation issued (HPD, open)
B
06/01/2018
Violation issued (HPD, open)
B
06/01/2018
Violation issued (HPD, open)
A
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offM. SPINELLI PLB & HTG INC12/22/2021
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC12/17/2021
BISBLISSUEDQMB PLUMBING & HEATING INC03/02/2005
BISPLISSUEDQMB PLUMBING & HEATING INC03/02/2005
BISPLISSUEDAMOK INC09/03/1992
BISMHISSUEDAMOK INC09/03/1992
BISBLISSUEDAMOK INC09/03/1992
1 project · most recent 12/01/2021
Gas
FiledStatusContractorScope
12/01/2021Permit IssuedVMC PLUMBING & HEATING INGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/27/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/31/2022Heating SystemsRobert Truskoskyspecial
05/31/2022Maintenance informationRobert Truskoskyenergy_progress
05/31/2022HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
05/31/2022HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
11/09/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
11/09/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
11/09/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
11/09/2021Maintenance informationRobert Truskoskyenergy_progress
11/09/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
11/09/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00627494-I1Request digital key ↗
08/31/2026B00626278-P1Request digital key ↗
08/31/2026B00626278-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B00627494-I1Open ↗
09/02/2026B00627494-I1Open ↗
09/02/2026B00627494-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00626278-I1Open ↗
08/31/2026B00626278-P1Open ↗
08/13/2026B00627494-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00627494-I1Open ↗
08/24/2026B00626278-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00626278-P1Open ↗
08/31/2026B00626278-I1Open ↗
08/13/2026B00627494-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00626278-I1Open ↗