← Back
Five to six families
1845 ANDREWS AVENUE SOUTH
💬 Discuss this project
1920Year Built
2Stories
C2Building Class
R5Zoning
4,187 sfGross Floor Area
5Units
Rent Stabilized
Five to six families · Owner of record: 1845 ANDREWS LP · 3,139 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof11p · 3 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 113p · 2 filings · 15 docs
Sub-Basement24p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOOOMI1607/08/2026
307 EAST 162ND STREET1007/08/2026
1845 ANDREWS LP403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/01/2019$555K—— → —$133/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
E4P CONSULTING ENGINEERING PLLC812/23/2021
ALBANNA ENGINEERING PC412/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G & G MECHANICAL GROUPGeneral Contractor707/08/2026
CASE PLUMBING LLCFire Protection107/08/2026
DNA PLUMBING CONTR. INCFire Protection107/08/2026
AGO & ALAUDIN GENERAL CONGeneral Contractor107/08/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061012/23/2021
Building Lifecycle
All (80)Filed (12)Permit Issued (8)Signed Off (4)Objection (26)Special Inspection (30)
07/11/2022
Signed off — Alteration
filing herewith for plumbing modification
X00271669-I1
07/11/2022
Signed off — Alteration
installation of a new sprinkler system
X00271677-I1
06/22/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Mechanical
01/03/2022
Signed off — Alteration
alteration of a mechanical system
X00271675-I1
12/29/2021
Signed off — Alteration
1-REMOVE EXISTING WOOD 'BACK' STAIR AND FILL IN THE OPENINGS WITH NEW FLOOR FRAMING.2- NEW STAIR OPENING FROM 1ST FLOOR DOWN TO BASEMENT3- OPEN EXTERIOR FOUNDATION WALL BELOW A WINDOW, TO CREATE A DOOR OPENING; NO CHANGE TO USE EGRESS OR OCCUPANCY
X00271781-I1
12/28/2021
Special inspection requirement — Structural Wood Frame
EDUARDO LIEVANO
12/28/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDUARDO LIEVANO
12/28/2021
Special inspection requirement — Final
EDUARDO LIEVANO
12/23/2021
Filed — Alteration
1-REMOVE EXISTING WOOD 'BACK' STAIR AND FILL IN THE OPENINGS WITH NEW FLOOR FRAMING.2- NEW STAIR OPENING FROM 1ST FLOOR DOWN TO BASEMENT3- OPEN EXTERIOR FOUNDATION WALL BELOW A WINDOW, TO CREATE A DOOR OPENING; NO CHANGE TO USE EGRESS OR OCCUPANCY
X00271781-P4
12/23/2021
Filed — Alteration
filing herewith for plumbing modification
X00271669-P3
12/23/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/23/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
12/23/2021
Special inspection requirement — Structural Wood Frame
GEORGE GHEBRYAL
12/14/2021
Filed — Alteration
1-REMOVE EXISTING WOOD 'BACK' STAIR AND FILL IN THE OPENINGS WITH NEW FLOOR FRAMING.2- NEW STAIR OPENING FROM 1ST FLOOR DOWN TO BASEMENT3- OPEN EXTERIOR FOUNDATION WALL BELOW A WINDOW, TO CREATE A DOOR OPENING; NO CHANGE TO USE EGRESS OR OCCUPANCY
X00271781-P2
12/03/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
12/03/2021
Special inspection requirement — Structural Wood Frame
GEORGE GHEBRYAL
12/03/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/03/2021
Special inspection requirement — Masonry
GEORGE GHEBRYAL
11/17/2021
Objection resolved — Addressed
11/12/2021
Objection raised — Scope
10/29/2021
Filed — Alteration
filing herewith for plumbing modification
X00271669-P2
10/26/2021
Special inspection requirement — Sprinkler Systems
EDUARDO LIEVANO
10/19/2021
Objection resolved — Addressed
10/14/2021
Special inspection requirement — Mechanical Systems
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — Final
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — HVAC and service water heating equipment
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — Electrical motors
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — Shutoff dampers
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — HVAC insulation and sealing
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — HVAC and service water heating system controls
EDUARDO LIEVANO
10/14/2021
Special inspection requirement — Maintenance information
EDUARDO LIEVANO
10/07/2021
Objection raised — Other
09/30/2021
Filed — Alteration
alteration of a mechanical system
X00271675-P1
09/30/2021
Filed — Alteration
installation of a new sprinkler system
X00271677-P1
09/30/2021
Filed — Alteration
filing herewith for plumbing modification
X00271669-P1
09/14/2021
Special inspection requirement — HVAC and service water heating equipment
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — HVAC and service water heating system controls
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — Electrical motors
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — HVAC insulation and sealing
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
09/14/2021
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
06/01/2021
Permit issued — Mechanical Systems
X00271675-I1-MS
05/12/2021
Permit issued — Sprinklers
X00271677-I1-EW-SP
04/20/2021
Permit issued — Plumbing
X00271669-I1-PL
01/15/2021
Permit issued — Mechanical Systems
X00271675-I1-MS
09/09/2020
Permit issued — Mechanical Systems
X00271675-I1-MS
08/24/2020
Filed — Alteration
1-REMOVE EXISTING WOOD 'BACK' STAIR AND FILL IN THE OPENINGS WITH NEW FLOOR FRAMING.2- NEW STAIR OPENING FROM 1ST FLOOR DOWN TO BASEMENT3- OPEN EXTERIOR FOUNDATION WALL BELOW A WINDOW, TO CREATE A DOOR OPENING; NO CHANGE TO USE EGRESS OR OCCUPANCY
X00271781-P1
07/29/2020
Special inspection requirement — Masonry
GEORGE GHEBRYAL
07/29/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
07/29/2020
Special inspection requirement — Final
GEORGE GHEBRYAL
07/22/2020
Permit issued — Plumbing
X00271669-I1-PL
07/22/2020
Permit issued — Sprinklers
X00271677-I1-EW-SP
06/30/2020
Permit issued — Structural
X00271781-I1-ST
05/07/2020
Objection resolved — Addressed
05/07/2020
Objection resolved — Addressed
05/07/2020
Objection resolved — Addressed
05/07/2020
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offG & G MECHANICAL GROUP06/01/2021
DOB NOWSprinklersSigned-offS & L PLUMBING INC05/12/2021
DOB NOWPlumbingSigned-offS & L PLUMBING INC04/20/2021
DOB NOWMechanical SystemsSigned-offG & G MECHANICAL GROUP01/15/2021
DOB NOWMechanical SystemsSigned-offG & G MECHANICAL GROUP09/09/2020
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC07/22/2020
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC07/22/2020
DOB NOWStructuralSigned-offAGO & ALAUDIN GENERAL CON06/30/2020
BIS—ISSUEDAGO & ALAUDIN GENERAL CON06/23/2020
1 project · most recent 06/24/2020
General Wiring Lighting
FiledStatusContractorScope
06/24/2020CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/28/2021Structural Wood FrameEDUARDO LIEVANOprogress
12/28/2021Structural Stability – Alterations of existing buildingsEDUARDO LIEVANOspecial
12/28/2021FinalEDUARDO LIEVANOprogress
12/23/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/23/2021FinalGEORGE GHEBRYALprogress
12/23/2021Structural Wood FrameGEORGE GHEBRYALprogress
12/03/2021FinalGEORGE GHEBRYALprogress
12/03/2021Structural Wood FrameGEORGE GHEBRYALprogress
12/03/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/03/2021MasonryGEORGE GHEBRYALspecial
10/26/2021Sprinkler SystemsEDUARDO LIEVANOspecial
10/14/2021Mechanical SystemsEDUARDO LIEVANOspecial
10/14/2021FinalEDUARDO LIEVANOprogress
10/14/2021HVAC and service water heating equipment EDUARDO LIEVANOenergy_progress
10/14/2021Electrical motorsEDUARDO LIEVANOenergy_progress
10/14/2021Shutoff dampersEDUARDO LIEVANOenergy_progress
10/14/2021HVAC insulation and sealing EDUARDO LIEVANOenergy_progress
10/14/2021HVAC and service water heating system controls EDUARDO LIEVANOenergy_progress
10/14/2021Maintenance informationEDUARDO LIEVANOenergy_progress
09/14/2021HVAC and service water heating equipment GEORGE GHEBRYALenergy_progress
09/14/2021HVAC and service water heating system controls GEORGE GHEBRYALenergy_progress
09/14/2021Electrical motorsGEORGE GHEBRYALenergy_progress
09/14/2021FinalGEORGE GHEBRYALprogress
09/14/2021Mechanical SystemsGEORGE GHEBRYALspecial
09/14/2021HVAC insulation and sealing GEORGE GHEBRYALenergy_progress
Latest 25 of 31.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026X00271669-I1Request digital key ↗
08/15/2026X00271669-P1Request digital key ↗
08/15/2026X00271669-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/26/2026X00271781-I1Request digital key ↗
08/26/2026X00271781-P2Request digital key ↗
08/26/2026X00271781-P4Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026X00271675-I1Request digital key ↗
08/15/2026X00271675-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/25/2026X00271677-P1Request digital key ↗
08/14/2026X00271677-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION10
11/16/2022220710504Open ↗
10/13/2022220710504Open ↗
08/16/2022220710504Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/27/2021220710504Open ↗
▸BISWORK PERMIT APPLICATION1
06/23/2020220710504Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISFINAL - SUBMIT TOPO STAMP TO VERIFIED ADDRESS OF PROPERTY1
02/02/2023220710504Open ↗
▸BISVERIFY TAX LOT1
06/22/2022220710504Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/14/2022220710504Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/01/2023220710504Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature22
09/19/2026X00271781-I1Open ↗
09/19/2026X00271781-I1Open ↗
09/02/2026X00271781-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026X00271675-I1Open ↗
08/26/2026X00271675-P1Open ↗
08/26/2026X00271781-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/19/2026X00271781-I1Open ↗
09/02/2026X00271781-P4Open ↗
09/01/2026X00271675-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/30/2019220710504Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/30/2023220710504Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
06/22/2020220710504Open ↗
▸BISSTREET TREE SIGNOFF1
08/16/2022220710504Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026X00271675-I1Open ↗
08/26/2026X00271781-I1Open ↗
08/25/2026X00271669-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/18/2020220710504Open ↗
▸Energy Compliance9
▸BISFENESTRATION AIR LEAKAGE1
01/04/2022220710504Open ↗
▸BISINTERIOR LIGHTING POWER1
01/04/2022220710504Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/04/2022220710504Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/22/2020220710504Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/04/2022220710504Open ↗
▸BISELECTRIC MOTORS1
01/04/2022220710504Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/04/2022220710504Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/30/2019220710504Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/04/2022220710504Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/22/2020220710504Open ↗
06/18/2020220710504Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/04/2022220710504Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/04/2022220710504Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE8
11/16/2022220710504Open ↗
10/13/2022220710504Open ↗
08/16/2022220710504Open ↗
Showing 3 of 8 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
09/22/2022220710504Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
08/30/2019220710504Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/18/2022220710504Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION7
06/14/2022220710504Open ↗
06/14/2022220710504Open ↗
06/14/2022220710504Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
08/30/2019220710504Open ↗
▸Other Documents4
▸BISSHUTOFF DAMPERS1
01/04/2022220710504Open ↗
▸BISFINAL - SUBMIT FINAL SURVEY...SURVEY SUBMITTED WAS AN ARCHITECTURAL SURVEY...SUBMIT AI-1 FORM ALSO1
02/02/2023220710504Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/24/2022220710504Open ↗
▸BISPLOT DIAGRAM1
08/30/2019220710504Open ↗