← Back
BuildNYC
Five to six families
1845 ANDREWS AVENUE SOUTH
BRONX · BIN 2009161
💬 Discuss this project
1920Year Built
2Stories
C2Building Class
R5Zoning
4,187 sfGross Floor Area
5Units
Rent Stabilized
Five to six families · Owner of record: 1845 Andrews · 3,139 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprinkler alteration for residential building12p · 4 filings · 20 docs
Floor 2Sprinkler alteration for residential building11p · 3 filings · 20 docs
Floor 1Sprinkler alteration for residential building11p · 2 filings · 15 docs
BasementSprinkler alteration for residential building1p · 1 filing · 6 docs
Sub-BasementSprinkler alteration for residential building22p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hooomi1607/08/2026
307 East 162nd Street1007/08/2026
1845 Andrews403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/01/2019$555K—Private party → Private party$133/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
E4P Consulting Engineering812/23/2021
Albanna Engineering412/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G G Mechanical Groupspecialty_contractor707/08/2026
DNA Plumbing Contractorsspecialty_contractor207/08/2026
Ago & Alaudin GeneralGeneral Contractor107/08/2026
S & L PlumbingPlumbing107/08/2026
Case PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering1061012/23/2021
Building Lifecycle
07/11/2022
Signed off — Alteration
filing herewith for plumbing modification
X00271669-I1
07/11/2022
Signed off — Alteration
installation of a new sprinkler system
X00271677-I1
06/22/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Mechanical
01/03/2022
Signed off — Alteration
alteration of a mechanical system
X00271675-I1
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offG & G Mechanical Group06/01/2021
DOB NOWSprinklersSigned-offS & L Plumbing05/12/2021
DOB NOWPlumbingSigned-offS & L Plumbing04/20/2021
DOB NOWMechanical SystemsSigned-offG & G Mechanical Group01/15/2021
DOB NOWMechanical SystemsSigned-offG & G Mechanical Group09/09/2020
DOB NOWPlumbingSigned-offDNA Plumbing Contractors07/22/2020
DOB NOWSprinklersSigned-offDNA Plumbing Contracting07/22/2020
DOB NOWStructuralSigned-offAgo & Alaudin General06/30/2020
BIS—ISSUEDAgo & Alaudin General06/23/2020
1 project · most recent 06/24/2020
General Wiring Lighting
FiledStatusContractorScope
06/24/2020CompleteHI-Rite ElectricGeneral Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/28/2021Structural Stability – Alterations of existing buildingsEDUARDO LIEVANOspecial
12/28/2021Structural Wood FrameEDUARDO LIEVANOprogress
12/28/2021FinalEDUARDO LIEVANOprogress
12/23/2021Structural Wood FrameGEORGE GHEBRYALprogress
12/23/2021FinalGEORGE GHEBRYALprogress
12/23/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/03/2021Structural Wood FrameGEORGE GHEBRYALprogress
12/03/2021FinalGEORGE GHEBRYALprogress
12/03/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/03/2021MasonryGEORGE GHEBRYALspecial
10/26/2021Sprinkler SystemsEDUARDO LIEVANOspecial
10/14/2021Mechanical SystemsEDUARDO LIEVANOspecial
10/14/2021FinalEDUARDO LIEVANOprogress
10/14/2021HVAC and service water heating equipment EDUARDO LIEVANOenergy_progress
10/14/2021Electrical motorsEDUARDO LIEVANOenergy_progress
10/14/2021Shutoff dampersEDUARDO LIEVANOenergy_progress
10/14/2021HVAC insulation and sealing EDUARDO LIEVANOenergy_progress
10/14/2021HVAC and service water heating system controls EDUARDO LIEVANOenergy_progress
10/14/2021Maintenance informationEDUARDO LIEVANOenergy_progress
09/14/2021Mechanical SystemsGEORGE GHEBRYALspecial
09/14/2021HVAC and service water heating system controls GEORGE GHEBRYALenergy_progress
09/14/2021Electrical motorsGEORGE GHEBRYALenergy_progress
09/14/2021FinalGEORGE GHEBRYALprogress
09/14/2021HVAC insulation and sealing GEORGE GHEBRYALenergy_progress
09/14/2021Shutoff dampersGEORGE GHEBRYALenergy_progress
Latest 25 of 31.
116 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account