4 Open Violations 2 unresolved · 2 paperwork only▸
DOB09/07/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/07/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB06/06/2016FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM(TESTED)ON THE ABOVE DATE AT APPROX 8:45AM I OBSERVED NEW GAS PIPING INSTALLED W/NO TESTING ONFILE W/DOB(GAS PIPING INSTALLED BY GAS METERS). REMEDY: PERFORM TEST.Nothing owed — awaiting certificate of correction
ECB06/06/2016GAS BEING SUPPLIED TO BLDG W/O INSPECTION & CERTIFICATION BY DOB. ON THE ABOVE DATE AT APPROX 8:40AM I OBSERVED NEW GAS PIPING INSTALLED & FEEDING GAS TO BLDG W/NO INSPECTIONS & CERTIFICATIONS BY DOB.(GAS PIPINNothing owed — awaiting certificate of correction
Two family frame · 2,003 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.