← Back
BuildNYC
Three families
1847 BAY RIDGE PARKWAY
BROOKLYN · Bensonhurst · BIN 3159710
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
3,298 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · Owner of record: Bay Ridge 111 · 4,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Great Ravine basement, 1st, and 2nd floor renovation6p · 2 filings · 20 docs
Floor 1Great Ravine basement, 1st, and 2nd floor renovation7p · 2 filings · 20 docs
BasementGreat Ravine basement, 1st, and 2nd floor renovation3p · 1 filing · 8 docs
Sub-BasementGreat Ravine basement, 1st, and 2nd floor renovation5p · 2 filings · 20 docs
Site & exteriorGreat Ravine basement, 1st, and 2nd floor renovation5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bay Ridge 111203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2025$1.9M—Private party → BAY RIDGE 111 LLC$591/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri810/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KJK ElectricElectrical103/22/2026
Kale ConstructionGeneral Contractor107/08/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394410/10/2025
Building Lifecycle
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
10/30/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, BOILERS AND HOT WATER HEATERS IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01185516-I1
10/16/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01185473-I1
10/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01185473-P3
31 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCatman Plumbing03/04/2025
DOB NOWGeneral ConstructionSigned-offKale Construction03/04/2025
2 projects · most recent 09/23/2025
General Wiring
FiledStatusContractorScope
09/23/2025CompleteKJK ElectricGeneral Wiring
08/25/2025CompleteKJK Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/10/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/10/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/10/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/10/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/10/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/10/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/18/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/18/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/18/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account