1848 GUERLAIN STREET
BRONX · Soundview-Bruckner-Bronx River · BIN 2131030
💬 Discuss this project
2022Year Built
—Stories
C1Building Class
R6Zoning
6,199 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 1846-1848 GUERLAIN OPERATING LLC · 2,962 sf lot · 2.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof11p · 2 filings · 20 docs
Floor 411p · 3 filings · 20 docs
Floor 311p · 3 filings · 20 docs
Floor 211p · 3 filings · 20 docs
Floor 111p · 4 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Site & exterior81p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NFS DEVELOPMENT4207/08/2026
1846-1848 GUERLAIN OPERATING LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS701/28/2025
PAUL G. JONES, P.E.203/24/2023
BADALY ENGINEERING PLLC309/26/2022
GEORGE A. RUFFALO, P.E.107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING INC303/21/2026
ALBA CONSULTANTS203/21/2026
CONSOLIDATED SCAFFOLD BRIDGE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZEFI & CO. LLCGeneral Contractor1807/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor507/08/2026
MARTINEZ ELECTRICAL CONTElectrical203/22/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137901/28/2025
Building Lifecycle
All (82)Filed (13)Permit Issued (17)Signed Off (6)Inspection (10)Objection (6)Special Inspection (30)
01/28/2025
Filed — New Building
NB FILED IN CONJUNCTION WITH NB APPLICATION #X00597057-I1
X00596890-P4
01/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/30/2024
Signed off — New Building
NB FILED IN CONJUNCTION WITH NB APPLICATION #X00597057-I1
X00596890-S1
10/21/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Interior lighting power
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Exterior lighting power
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Shutoff dampers
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Fenestration areas
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Footing and Foundation
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Insulation placement and R values
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Final
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Structural Steel - Welding
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Mechanical Systems
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Concrete - Cast-In-Place
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Chimneys and vents
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Subgrade Inspections
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Electrical motors and elevators
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Lighting controls
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Lighting in dwelling units
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Fenestration air leakage
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Structural Steel - Details
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Heating Systems
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Structural Cold-Formed Steel
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Masonry
MOHAMMAD BADALY
09/04/2024
Special inspection requirement — Air barrier - visual inspection
MOHAMMAD BADALY
08/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2024
Filed — New Building
NB FILED IN CONJUNCTION WITH NB APPLICATION #X00597057-I1
X00596890-P3
08/26/2024
Signed off — Alteration
TEMPORARY INSTALLATION OF A PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X08055564-S1
08/26/2024
Signed off — Alteration
TEMPORARY INSTALLATION OF A PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X08055564-I1
08/23/2024
Signed off — Alteration
Provide new plumbing and sprinkler system in conjunction with NB #X00596890.
X00746176-I1
08/07/2024
Signed off — Alteration
X00746725-I1
08/07/2024
Signed off — Alteration
X00550244-I1
08/07/2024
Permit issued — General Construction
X00596890-I1-GC-CX
05/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2024
Permit issued — General Construction
X00596890-I1-MS
02/13/2024
Permit issued — Foundation
X00596890-I1-GC-CX
02/13/2024
Permit issued — Support of Excavation
X00596890-S1-SE
09/15/2023
Filed — Alteration
Provide new plumbing and sprinkler system in conjunction with NB #X00596890.
X00746176-P2
08/14/2023
Permit issued — Mechanical Systems
X00596890-I1-GC-CX
07/28/2023
Permit issued — Structural
X00596890-I1-GC-CX
07/11/2023
Permit issued — Supported Scaffold
X08055564-S1-SF
05/25/2023
Filed — Alteration
Provide new plumbing and sprinkler system in conjunction with NB #X00596890.
X00746176-P1
05/24/2023
Permit issued — Construction Fence
X00746725-I1-FN
04/12/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/24/2023
Filed — Alteration
TEMPORARY INSTALLATION OF A PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X08055564-S1
03/24/2023
Permit issued — Supported Scaffold
X08055564-S1-SF
12/15/2022
Filed — Alteration
TEMPORARY INSTALLATION OF A PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X08055564-I1
12/15/2022
Permit issued — Sidewalk Shed
X08055564-I1-SH
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZEFI & CO. LLC08/07/2024
DOB NOWGeneral ConstructionSigned-offZEFI & CO. LLC03/06/2024
DOB NOWFoundationPermit IssuedZEFI & CO. LLC02/13/2024
DOB NOWSupport of ExcavationSigned-offZEFI & CO. LLC02/13/2024
DOB NOWMechanical SystemsPermit IssuedZEFI & CO. LLC08/14/2023
DOB NOWStructuralPermit IssuedZEFI & CO. LLC07/28/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/11/2023
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC05/24/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING03/24/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING12/15/2022
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN10/24/2022
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND08/24/2022
DOB NOWMechanical SystemsPermit IssuedZEFI & CO. LLC08/02/2022
DOB NOWGeneral ConstructionPermit IssuedZEFI & CO. LLC06/15/2022
DOB NOWSupport of ExcavationSigned-offZEFI & CO. LLC06/02/2022
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC06/02/2022
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC07/20/2021
1 project · most recent 01/28/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2025Permit IssuedZEFI & CO. LLCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Goodman GPHM32441AA 36,000 BTU · Rooftop Unit ×3
Heating
Goodman GPHM32441AA 70,000 BTU · Rooftop Unit ×3
Ventilation
Floaire DDAR10 800 CFM ×24
Ducts & Piping
Floaire DDAR10 36,000 BTU · Ductwork ×24
2 projects · most recent 08/14/2024
General Wiring
FiledStatusContractorScope
08/14/2024CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
12/21/2022CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 01/28/2025
Steel
FiledStatusContractorScope
01/28/2025Permit IssuedZEFI & CO. LLCSteel
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/21/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/12/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
09/04/2024Fire-Resistance Rated ConstructionMOHAMMAD BADALYprogress
09/04/2024Footing and FoundationMOHAMMAD BADALYprogress
09/04/2024FinalMOHAMMAD BADALYprogress
09/04/2024HVAC-R and service water heating system controlsMOHAMMAD BADALYenergy_progress
09/04/2024Insulation placement and R valuesMOHAMMAD BADALYenergy_progress
09/04/2024Shutoff dampersMOHAMMAD BADALYenergy_progress
09/04/2024Exterior lighting powerMOHAMMAD BADALYenergy_progress
09/04/2024Duct leakage testing, insulation and designMOHAMMAD BADALYenergy_progress
09/04/2024HVAC-R and service water heating equipmentMOHAMMAD BADALYenergy_progress
09/04/2024Fenestration areasMOHAMMAD BADALYenergy_progress
09/04/2024Interior lighting powerMOHAMMAD BADALYenergy_progress
09/04/2024Air barrier - visual inspectionMOHAMMAD BADALYenergy_progress
09/04/2024Maintenance informationMOHAMMAD BADALYenergy_progress
09/04/2024MeteringMOHAMMAD BADALYenergy_progress
09/04/2024HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
09/04/2024Concrete - Cast-In-PlaceMOHAMMAD BADALYspecial
09/04/2024Excavations - Sheeting, Shoring, and BracingMOHAMMAD BADALYspecial
09/04/2024Chimneys and ventsMOHAMMAD BADALYspecial
09/04/2024Subgrade InspectionsMOHAMMAD BADALYspecial
09/04/2024Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
09/04/2024Electrical motors and elevatorsMOHAMMAD BADALYenergy_progress
09/04/2024Lighting controlsMOHAMMAD BADALYenergy_progress
09/04/2024Fenestration and door U-factor and product ratingsMOHAMMAD BADALYenergy_progress
09/04/2024Lighting in dwelling unitsMOHAMMAD BADALYenergy_progress
09/04/2024Fenestration air leakageMOHAMMAD BADALYenergy_progress
Latest 25 of 93.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026X00550244-I1Request digital key ↗
08/24/2026X00746725-I1Request digital key ↗
08/23/2026X08055564-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00596890-P4Open ↗
08/13/2026X00596890-P3Open ↗
08/13/2026X00596890-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00596890-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00550244-I1Open ↗
08/24/2026X00746725-I1Open ↗
08/22/2026X00746176-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026X00596890-I1Open ↗
09/01/2026X00596890-I1Open ↗
08/31/2026X00596890-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026X00596890-I1Open ↗
09/01/2026X00596890-I1Open ↗
09/01/2026X00596890-I1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00596890-P4Open ↗
08/13/2026X00596890-P3Open ↗
08/13/2026X00596890-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/20/2026X00596890-I1Open ↗
08/20/2026X00596890-P3Open ↗
08/20/2026X00596890-P4Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00596890-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00596890-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00596890-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00596890-I1Open ↗
08/13/2026X00746176-I1Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification5
08/20/2026X00596890-P2Open ↗
08/20/2026X00596890-P1Open ↗
08/20/2026X00596890-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00596890-P3Open ↗
08/13/2026X00596890-P4Open ↗
08/13/2026X00596890-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X00596890-I1Open ↗
08/13/2026X00596890-P4Open ↗
08/13/2026X00596890-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00596890-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00596890-S1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00596890-I1Open ↗