← Back
Miscellaneous two family
185-01 50 AVENUE
QUEENS · BIN 4127524
💬 Discuss this project
1945Year Built
1.5Stories
B9Building Class
R2AZoning
1,406 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 9,095 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2024$1.1M—Private party → Private party$782/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
3W ENGINEERING LLC104/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJK BUILDING CONSULTINGGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613104/10/2025
Building Lifecycle
All (16)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Objection (2)Special Inspection (9)
10/03/2025
Signed off — Alteration
INSTALL FRONT PORCH, EXTERIOR STAIR TO CELLAR, AND TWO EXTERIOR DOORS AS PER PLAN. REMEDY TO CURE THE ECB VIOLATION #39143111Y. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01208766-I1
09/05/2025
Violation issued (ECB, closed)
Construction
08/25/2025
Permit issued — General Construction
Q01208766-I1-GC-CX
04/24/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Cost
04/10/2025
Filed — Alteration
INSTALL FRONT PORCH, EXTERIOR STAIR TO CELLAR, AND TWO EXTERIOR DOORS AS PER PLAN. REMEDY TO CURE THE ECB VIOLATION #39143111Y. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01208766-I1
04/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
04/10/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Fran Huang
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
04/10/2025
Special inspection requirement — Structural Steel - Details
Fran Huang
04/10/2025
Special inspection requirement — Final
Fran Huang
04/10/2025
Special inspection requirement — Footing and Foundation
Fran Huang
04/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
04/10/2025
Special inspection requirement — Fenestration air leakage
Fran Huang
04/10/2025
Special inspection requirement — Fenestration areas
Fran Huang
03/28/2025
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJJK BUILDING CONSULTING08/25/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/10/2025Concrete - Cast-In-PlaceFran Huangspecial
04/10/2025Excavations - Sheeting, Shoring, and BracingFran Huangspecial
04/10/2025Structural Stability – Alterations of existing buildingsFran Huangspecial
04/10/2025Structural Steel - DetailsFran Huangspecial
04/10/2025FinalFran Huangprogress
04/10/2025Footing and FoundationFran Huangprogress
04/10/2025Fenestration and door U-factor and product ratingsFran Huangenergy_progress
04/10/2025Fenestration air leakageFran Huangenergy_progress
04/10/2025Fenestration areasFran Huangenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01208766-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026Q01208766-I1Open ↗
08/27/2026Q01208766-I1Open ↗
08/27/2026Q01208766-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q01208766-I1Open ↗
08/27/2026Q01208766-I1Open ↗
08/27/2026Q01208766-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01208766-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01208766-I1Open ↗