← Back
BuildNYC
One family attached or semi-detached
185-03 DUNLOP AVENUE
QUEENS · St. Albans · BIN 4220386
💬 Discuss this project
1945Year Built
1Stories
A5Building Class
R2Zoning
968 sfGross Floor Area
1Units
Rent Stabilized38 Active Violations 36 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
One family attached or semi-detached · 2,200 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarRemove illegal partition walls, legalize bathrooms10p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
St Design & Consulting206/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H Drummond Exp403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Norman C. Lok818104/15/2023
Building Lifecycle
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
02/13/2025
Occupancy contrary to building department records. At time of inspection, observed, cellar is converted & maintained as class-a apartment with 3PCS…
ECB violation · closed
02/13/2025
Work without a permit. At time of appointment inspection, observed, at cellar level 3PICES bathroom with water & waste line and stove with gas…
ECB violation · closed
02/10/2025
Occupancy contrary to that allowed by the certificate of occupancy or buildings dept records. At time of inspection observed basement converted…
ECB violation · open
02/10/2025
Failure to obey a vacate order from the commissioner per 28-207.4. At time of inspection premises under 2 vacate orders under compliant #4447969…
ECB violation · open
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 06/17/2023
Gas Water/Sanitary
FiledStatusContractorScope
06/17/2023——Gas, Water/Sanitary
1 project · most recent 09/22/2020
General Wiring
FiledStatusContractorScope
09/22/2020CompleteC & A ElectricalGeneral Wiring
Nothing on file for this building.
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account