← Back
Two stories - detached, small or mid-size
185-14 80 ROAD
QUEENS · BIN 4156150
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,576 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof2p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2018$1.3M—Private party → Private party$819/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITISCAPE CONSULTING LTD106/01/2026
HC ARCHITECT, PC107/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PRO PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600107/13/2020
Building Lifecycle
All (42)Filed (2)Permit Issued (2)Signed Off (1)Violation (6)Objection (10)Special Inspection (21)
08/24/2026
Objection raised — Admin
08/24/2026
Objection raised — Zoning
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Structural
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Zoning
08/24/2026
Objection raised — Inspections
08/24/2026
Objection raised — Fire_Protection
07/14/2026
Objection resolved — Addressed
07/06/2026
Objection raised — Scope
06/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Alt application including vertical and horizontal enlargement to existing one family two story with cellar. Interior and exterior work.New fenestration work.New metal deck in front and rear yard.No change in use or occupancy.Increase in bulk and FAR
Q01405840-I1
06/01/2026
Special inspection requirement — Maintenance information
06/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/01/2026
Special inspection requirement — Insulation placement and R values
06/01/2026
Special inspection requirement — Interior lighting power
06/01/2026
Special inspection requirement — Fenestration areas
06/01/2026
Special inspection requirement — Permanent certificate
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/01/2026
Special inspection requirement — Air barrier — testing
06/01/2026
Special inspection requirement — Fenestration air leakage
06/01/2026
Special inspection requirement — Metering
06/01/2026
Special inspection requirement — Air barrier - visual inspection
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/01/2026
Special inspection requirement — Protection of exposed foundation insulation
08/09/2021
Signed off — Alteration
INSTALL NEW COMBO THANKLESS GAS BOILER WITH WATER HEATER AND LAVATORY IN CELLAR FLOOR. THIS APPLICATION IS IN CONJUNCTION WITH BIS APPLICATION 440605436. APPLICATION FILLED TO RESOLVE ECB VIOLATIONS 39023568H & 39023569J
Q00368517-I1
07/21/2021
Permit issued — Plumbing
Q00368517-I1-PL
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2020
Permit issued — Plumbing
Q00368517-I1-PL
07/13/2020
Filed — Alteration
INSTALL NEW COMBO THANKLESS GAS BOILER WITH WATER HEATER AND LAVATORY IN CELLAR FLOOR. THIS APPLICATION IS IN CONJUNCTION WITH BIS APPLICATION 440605436. APPLICATION FILLED TO RESOLVE ECB VIOLATIONS 39023568H & 39023569J
Q00368517-I1
07/09/2020
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
07/09/2020
Special inspection requirement — HVAC insulation and sealing
Hackjong Choi
07/09/2020
Special inspection requirement — HVAC and service water heating equipment
Hackjong Choi
07/09/2020
Special inspection requirement — HVAC and service water heating system controls
Hackjong Choi
07/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
06/05/2020
Violation issued (ECB, closed)
Construction
06/05/2020
Violation issued (ECB, closed)
Construction
06/05/2020
Violation issued (ECB, closed)
Plumbing
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/21/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC08/09/2020
BISOTISSUEDNY DYNAMIC CONSTRUCTION C09/11/2020
BISPLISSUEDDUNDEE PLBG & HTG INC08/11/2003
BISOTISSUEDAHMAD MORADI DESIGN AND CONTR.06/03/2003
1 project · most recent 08/13/2020
General Wiring
FiledStatusContractorScope
08/13/2020Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/01/2026Maintenance information—energy_progress
06/01/2026Electric vehicle service equipment requirements—energy_progress
06/01/2026Insulation placement and R values—energy_progress
06/01/2026Interior lighting power—energy_progress
06/01/2026Fenestration areas—energy_progress
06/01/2026Permanent certificate—energy_progress
06/01/2026Structural Stability – Alterations of existing buildings—special
06/01/2026Fire-Resistant Penetrations and Joints—special
06/01/2026Energy Code Compliance Inspections—progress
06/01/2026Fire-Resistance Rated Construction—progress
06/01/2026Air barrier — testing —energy_progress
06/01/2026Fenestration air leakage—energy_progress
06/01/2026Metering—energy_progress
06/01/2026Air barrier - visual inspection—energy_progress
06/01/2026Fenestration and door U-factor and product ratings—energy_progress
06/01/2026Protection of exposed foundation insulation—energy_progress
07/09/2020Energy Code Compliance InspectionsHackjong Choiprogress
07/09/2020HVAC insulation and sealing Hackjong Choienergy_progress
07/09/2020HVAC and service water heating equipment Hackjong Choienergy_progress
07/09/2020HVAC and service water heating system controls Hackjong Choienergy_progress
07/09/2020Fire-Resistant Penetrations and JointsHackjong Choispecial
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch1
08/15/2026Q01405840-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00368517-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
07/14/2020440605436Open ↗
07/07/2020440605436Open ↗
▸BISWORK PERMIT APPLICATION1
09/11/2020440605436Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01405840-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01405840-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00368517-I1Open ↗
08/25/2026Q00368517-I1Open ↗
08/25/2026Q00368517-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00368517-I1Open ↗
08/16/2026Q01405840-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/07/2020440605436Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/07/2020440605436Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00368517-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/29/2020440605436Open ↗
07/07/2020440605436Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026Q00368517-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/10/2021440605436Open ↗
09/09/2020440605436Open ↗
07/07/2020440605436Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/10/2021440605436Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/22/2020440605436Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/07/2020440605436Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/10/2021440605436Open ↗
09/03/2020440605436Open ↗
09/01/2020440605436Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/10/2021440605436Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/10/2021440605436Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/07/2020440605436Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/05/2021440605436Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
08/26/2020440605436Open ↗
07/29/2020440605436Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/07/2020440605436Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01405840-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01405840-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01405840-I1Open ↗