← Back
Two stories - detached, small or mid-size
185-15 89 AVENUE
QUEENS · Hollis · BIN 4212816
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,832 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,800 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
Plumbing
Filed — no permit issued1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASKON ARCHITECTS, P.C.105/14/2024
Building Lifecycle
All (8)Filed (1)Violation (6)Special Inspection (1)
01/22/2026
Violation issued (ECB, open)
Construction
01/22/2026
Violation issued (ECB, open)
Construction
05/14/2024
Filed — Alteration
Q01039116-I1
05/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/15/2000
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
05/15/2000
Violation issued (ECB, open)
Quality of Life
11/21/1999
Violation issued (ECB, closed)
Quality of Life
11/21/1999
Violation issued (ECB, closed)
Quality of Life
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/14/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01039116-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q01039116-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01039116-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01039116-I1Open ↗