← Back
BuildNYC
Elevator apt, fireproof without stores
Starrett City
185 ARDSLEY LOOP · BIN 3336173
💬 Discuss this project
1971Year Built
20Stories
D3Building Class
R5Zoning
997,720 sfGross Floor Area
1,092Units
LL97 CoveredRent Stabilized6 Active Violations 5 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC Housing Company · 358,496 sf lot · 2.78 FAR built · Flood zone X500
Locations of Work
StructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP inspection using industrial rope accessUnder Construction1p · 1 filing · 2 docs
Site & exterior185 Ardsley Loop construction fence5p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC Owner603/21/2026
Starrett City503/21/2026
Grenadire Realty403/21/2026
BSC Housing Company310/13/2026
S Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scalar Architecture108/19/2020
Paul Perdek, Prof. Engineering108/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Proto Restoration ConstructionScaffold407/08/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
Advanced P Mechanical SprinklerGeneral Contractor103/22/2026
Building Lifecycle
All (81)Filed (3)Permit Issued (3)Signed Off (2)Facade (FISP) (13)Violation (60)
09/04/2026
Permit issued — Suspended Scaffold
B01429870-I1-SC
08/19/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01429870-I1
04/22/2026
Violation issued (HPD, closed)
C
04/22/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
06/12/2025
Violation issued (HPD, closed)
A
01/28/2025
Violation issued (HPD, closed)
C
01/28/2025
Violation issued (HPD, closed)
B
01/28/2025
Violation issued (HPD, closed)
B
01/28/2025
Violation issued (HPD, closed)
B
12/31/2024
Violation issued (HPD, closed)
C
12/31/2024
Violation issued (HPD, closed)
A
12/31/2024
Violation issued (HPD, closed)
B
12/31/2024
Violation issued (HPD, closed)
B
12/31/2024
Violation issued (HPD, closed)
B
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2024
Violation issued (HPD, closed)
A
03/09/2024
Violation issued (HPD, closed)
A
03/09/2024
Violation issued (HPD, closed)
B
03/09/2024
Violation issued (HPD, closed)
B
03/09/2024
Violation issued (HPD, closed)
A
03/09/2024
Violation issued (HPD, closed)
B
03/09/2024
Violation issued (HPD, closed)
B
09/05/2023
Violation issued (HPD, closed)
B
09/05/2023
Violation issued (HPD, closed)
B
08/14/2023
Violation issued (FDNY_ORDER, closed)
06/21/2023
Violation issued (HPD, closed)
B
06/21/2023
Violation issued (HPD, closed)
C
06/08/2023
Violation issued (HPD, closed)
A
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/05/2023
Violation issued (HPD, closed)
A
02/05/2023
Violation issued (HPD, closed)
C
02/05/2023
Violation issued (HPD, closed)
A
11/27/2022
Violation issued (HPD, closed)
B
11/27/2022
Violation issued (HPD, closed)
B
06/30/2022
Signed off — Alteration
B00381531-I1
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/20/2021
Violation issued (HPD, closed)
B
11/20/2021
Violation issued (HPD, closed)
C
11/20/2021
Violation issued (HPD, closed)
C
11/20/2021
Violation issued (HPD, closed)
C
11/20/2021
Violation issued (HPD, closed)
C
11/20/2021
Violation issued (HPD, closed)
B
11/03/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
A
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
C
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
B
10/09/2021
Violation issued (HPD, closed)
B
10/07/2021
Violation issued (HPD, closed)
B
10/07/2021
Violation issued (HPD, closed)
A
10/07/2021
Violation issued (HPD, closed)
A
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System09/04/2026
DOB NOWConstruction FenceSigned-offProto Restoration Construction08/26/2020
DOB NOWSidewalk ShedSigned-offProto Restoration Construction08/17/2020
BISOTISSUEDPna Contracting09/23/2020
BISOTISSUEDPna Contracting08/07/2020
BISOTISSUEDPna Contracting07/09/2020
BISEQISSUEDRock Scaffolding07/13/2011
BISOTISSUEDAllstate Restoration06/22/2011
BISOTISSUEDAllstate Restoration12/02/2010
BISOTISSUEDAllstate Restoration10/10/2006
BISOTISSUEDNJK Contracting04/17/2002
BISOTISSUEDNJK Contracting10/10/2001
1 project · most recent 05/12/2020
FiledStatusContractorScope
05/12/2020CompleteTop Shelf Electric—
Nothing on file for this building.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00381531-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00381533-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/20/2026B01429870-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION11
02/25/2021322030510Open ↗
02/12/2021322030510Open ↗
11/10/2020322030510Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION5
08/25/2020322030510Open ↗
07/09/2020322030510Open ↗
07/18/2011320337863Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/26/2020322030510Open ↗
01/04/2012320337863Open ↗
09/20/2011320152749Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/26/2020322030510Open ↗
07/18/2011320337863Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/24/2020340726003Open ↗
03/26/2020322030510Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00381533-I1Open ↗
08/13/2026B00381531-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/24/2020340726003Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/14/2011320337863Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/24/2020340726003Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
04/24/2020340726003Open ↗
03/26/2020322030510Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00381531-I1Open ↗
08/13/2026B00381533-I1Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/10/2010320152749Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/19/2009320085171Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/26/2020322030510Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/16/2021322030510Open ↗
04/24/2020340726003Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/16/2021322030510Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/26/2020322030510Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/24/2020340726003Open ↗
▸BISNYCECC ANALYSIS1
04/24/2020340726003Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/16/2021322030510Open ↗
02/12/2021322030510Open ↗
04/24/2020340726003Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/24/2020340726003Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/16/2021322030510Open ↗
01/04/2012320337863Open ↗
09/29/2011320152749Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/14/2011320337863Open ↗
05/10/2010320152749Open ↗
10/19/2009320085171Open ↗
▸BISFINAL1
04/24/2020340726003Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
02/25/2021322030510Open ↗
02/16/2021322030510Open ↗
04/24/2020340726003Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/16/2021322030510Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
03/26/2020322030510Open ↗
07/14/2011320337863Open ↗
05/10/2010320152749Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
02/12/2021322030510Open ↗
06/29/2020340726003Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/24/2020340726003Open ↗
▸BISBOROUGH INTAKE FORM1
02/25/2021322030510Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
12/10/2009320085171Open ↗
▸DOB NOWIRA Certification1
08/20/2026B01429870-I1Open ↗