← Back
BuildNYC
Large suburban residence
185 EYLANDT STREET
STATEN ISLAND · BIN 5082057
💬 Discuss this project
1987Year Built
1Stories
A3Building Class
R3XZoning
5,058 sfGross Floor Area
1Units
Large suburban residence · 12,048 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Attic9p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 147p · 2 filings · 20 docs
Cellar27p · 2 filings · 20 docs
Site & exteriorConstruction fence10p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group802/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jed 74General Contractor207/08/2026
Jed 74Scaffold203/21/2026
K.M.D. Mechanical 1443Plumbing106/28/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738602/06/2026
Building Lifecycle
04/14/2026
Signed off — Alteration CO
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALTCO FOR RENOVATION FROM 1 FAMILY TO 2 FAMILY
S01006019-S2
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/12/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S45826682-S1-PL
03/02/2026
Permit issued — Curb Cut
S01006019-S2-CC
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJED 7403/02/2026
DOB NOWPlumbingPermit IssuedK.M.D. Mechanical 144303/12/2025
DOB NOWPlumbingSigned-offQuality Plumbing05/30/2024
DOB NOWGeneral ConstructionPermit IssuedJED 7405/16/2024
DOB NOWConstruction FenceSigned-offJED 7405/02/2024
1 project · most recent 02/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/06/2026Signed-offQuality PlumbingGas, Storm, Water/Sanitary
1 project · most recent 12/31/2024
General Wiring
FiledStatusContractorScope
12/31/2024CompleteMangi ElectricalGeneral Wiring
1 project · most recent 02/06/2026
Steel Wood
FiledStatusContractorScope
02/06/2026Signed-offJed 74Steel, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
10/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/21/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
02/27/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
02/27/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/27/2026Structural Stability – Alterations of existing buildingsanthony santorospecial
02/27/2026Structural Steel - Weldinganthony santorospecial
02/27/2026Concrete - Cast-In-Placeanthony santorospecial
02/27/2026Subgrade Inspectionsanthony santorospecial
02/27/2026Energy Code Compliance Inspectionsanthony santoroprogress
02/27/2026Finalanthony santoroprogress
02/27/2026Footing and Foundationanthony santoroprogress
02/27/2026Fire-Resistance Rated Constructionanthony santoroprogress
02/27/2026Structural Wood Frameanthony santoroprogress
02/27/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/27/2026Air barrier - visual inspectionanthony santoroenergy_progress
02/27/2026Meteringanthony santoroenergy_progress
02/27/2026Fenestration areasanthony santoroenergy_progress
02/27/2026Interior lighting poweranthony santoroenergy_progress
02/27/2026Insulation placement and R valuesanthony santoroenergy_progress
02/27/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/27/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
02/27/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
02/27/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
02/27/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
02/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
02/27/2026Permanent certificateanthony santoroenergy_progress
02/27/2026Ventilation and air distribution systemanthony santoroenergy_progress
Latest 25 of 60.
70 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account