← Back
Zoned residential, not Manhattan
1850 LAFAYETTE AVENUE
BRONX · BIN 2833957
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
Rent Stabilized165 Open Violations 162 unresolved · 3 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: STEVENSON COMMONS HOUSING COMPANY, INC. · 167,588 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 01/06/2026
Storm
FiledStatusContractorScope
01/06/2026Signed-offIPS PLUMBING CORPStorm
1 job · most recent 08/02/2023
General Wiring Lighting
FiledStatusContractorScope
08/02/2023CompleteGLO ELECTRIC LLCGeneral Wiring, Lighting
1 job · most recent 01/06/2026
FiledStatusContractorScope
01/06/2026Signed-offIPS PLUMBING CORP1 scope_items
Building Lifecycle
All (80)Filed (11)Permit Issued (8)Signed Off (5)Inspection (8)Objection (26)Special Inspection (22)
02/12/2026
Signed off — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S2
02/05/2026
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Final
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Preliminary
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Subgrade Inspections
JOHN MCMONAGLE
02/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JOHN MCMONAGLE
01/06/2026
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-P4
01/02/2026
Signed off — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S5
01/02/2026
Signed off — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S4
01/02/2026
Signed off — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S3
12/31/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/03/2025
Special inspection requirement — Preliminary
JOHN MCMONAGLE
12/03/2025
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
12/03/2025
Special inspection requirement — Subgrade Inspections
JOHN MCMONAGLE
12/03/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JOHN MCMONAGLE
12/03/2025
Special inspection requirement — Final
JOHN MCMONAGLE
11/24/2025
Signed off — Alteration
Temporary Parking Grading as per plans filed.
X00881086-I1
10/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/15/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/28/2025
Permit issued — Plumbing
X00954269-S2-PL
07/17/2025
Special inspection requirement — Preliminary
JOHN MCMONAGLE
06/24/2025
Objection resolved — Addressed
06/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2025
Objection raised — Other
06/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
05/28/2025
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-P1
05/28/2025
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-P3
05/28/2025
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-P2
05/05/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Subgrade Inspections
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Concrete - Precast
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Preliminary
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Preliminary
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
05/05/2025
Special inspection requirement — Final
JOHN MCMONAGLE
04/02/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/10/2025
Permit issued — Curb Cut
X00954269-S3-CC
03/10/2025
Permit issued — Curb Cut
X00954269-S5-CC
03/10/2025
Permit issued — Curb Cut
X00954269-S4-CC
02/14/2025
Permit issued — General Construction
X00954269-I1-GC
02/11/2025
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
05/01/2024
Objection raised — Other
05/01/2024
Objection raised — Other
04/23/2024
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S5
04/23/2024
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S4
04/23/2024
Filed — Alteration CO
NEW PROPOSED CURB CUT FOR PROPOSED PARKING LOT AS PER PLANS FILED.
X00954269-S3
02/16/2024
Permit issued — Earth Work
X00954269-S1-EA
01/24/2024
Objection resolved — Addressed
01/04/2024
Permit issued — General Construction
X00954269-I1-GC
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
Latest 60 of 80 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAMBER PROPERTY GROUP2007/08/2026
STEVENSON COMMONS HOUSING COMPAN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE RBA GROUP1101/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIFTH AVENUE BUILDERS LLCGeneral Contractor807/08/2026
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843501/06/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offIPS PLUMBING CORP08/28/2025
DOB NOWCurb CutSigned-offFIFTH AVENUE BUILDERS LLC03/10/2025
DOB NOWCurb CutSigned-offFIFTH AVENUE BUILDERS LLC03/10/2025
DOB NOWCurb CutSigned-offFIFTH AVENUE BUILDERS LLC03/10/2025
DOB NOWGeneral ConstructionPermit IssuedFIFTH AVENUE BUILDERS LLC02/14/2025
DOB NOWEarth WorkSigned-offFIFTH AVENUE BUILDERS LLC02/16/2024
DOB NOWGeneral ConstructionPermit IssuedFIFTH AVENUE BUILDERS LLC01/04/2024
DOB NOWEarth WorkSigned-offFIFTH AVENUE BUILDERS LLC07/28/2023
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/31/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/15/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/15/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/05/2026Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
02/05/2026FinalJOHN MCMONAGLEprogress
02/05/2026PreliminaryJOHN MCMONAGLEprogress
02/05/2026Subgrade InspectionsJOHN MCMONAGLEspecial
02/05/2026Subsurface Conditions – Fill Placement & In-Place DensityJOHN MCMONAGLEspecial
12/03/2025PreliminaryJOHN MCMONAGLEprogress
12/03/2025Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
12/03/2025Subgrade InspectionsJOHN MCMONAGLEspecial
12/03/2025Subsurface Conditions – Fill Placement & In-Place DensityJOHN MCMONAGLEspecial
12/03/2025FinalJOHN MCMONAGLEprogress
07/17/2025PreliminaryJOHN MCMONAGLEprogress
06/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
05/05/2025Subsurface Conditions – Fill Placement & In-Place DensityJOHN MCMONAGLEspecial
05/05/2025Subgrade InspectionsJOHN MCMONAGLEspecial
05/05/2025Concrete - PrecastJOHN MCMONAGLEspecial
05/05/2025Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
05/05/2025PreliminaryJOHN MCMONAGLEprogress
05/05/2025PreliminaryJOHN MCMONAGLEprogress
05/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
05/05/2025FinalJOHN MCMONAGLEprogress
05/25/2023PreliminaryJOHN MCMONAGLEprogress
05/25/2023FinalJOHN MCMONAGLEprogress
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026X00881086-I1Request digital key ↗
08/21/2026X00954269-S5Request digital key ↗
08/21/2026X00954269-S4Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits6
▸DOB NOWDEP Stormwater Construction Permit5
08/13/2026X00954269-P1Open ↗
08/13/2026X00954269-I1Open ↗
08/13/2026X00954269-P4Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
03/21/2025240359241Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X00954269-P1Open ↗
08/13/2026X00954269-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00954269-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/23/2026X00881086-I1Open ↗
08/21/2026X00954269-I1Open ↗
08/21/2026X00954269-S4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026X00954269-S1Open ↗
09/01/2026X00881086-I1Open ↗
08/31/2026X00954269-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026X00954269-S1Open ↗
08/29/2026X00954269-S2Open ↗
08/28/2026X00954269-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/21/2025240359241Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/21/2025240359241Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026X00954269-P1Open ↗
08/13/2026X00954269-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/21/2025240359241Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/21/2026X00954269-I1Open ↗
08/21/2026X00954269-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/21/2025240359241Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00881086-I1Open ↗