← Back
Elevator apt, semi-fireproof without stores
1854 ADAM C POWELL BLVD
MANHATTAN · BIN 1055117
💬 Discuss this project
1920Year Built
7Stories
D1Building Class
R7-2Zoning
27,510 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized9 Open Violations 7 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: VICLAR REALTY CORPORATION · 5,000 sf lot · 5.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL G CONTRACTING707/08/2026
VICLAR REALTY1103/22/2026
FRIEDMAN MANAGEMENT403/22/2026
ALFRED FRIEDMAN MGMT CORP103/22/2026
193RD STREET APTS LLC103/22/2026
VILLAR RLTY CORP.103/22/2026
AS FRIEDMAN MANAGEMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING110/13/2022
MCRB SERVICE CORP101/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUL & G CONTRACTING INCGeneral Contractor507/08/2026
ZORIA CONSTRUCTION NY INC.General Contractor209/18/2026
MICHAEL OLIVOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARTRIDGE VENTURE ENGINEE7690110/13/2022
Building Lifecycle
All (86)Filed (2)Permit Issued (5)Signed Off (1)Facade (FISP) (14)Violation (60)Special Inspection (4)
09/17/2026
Permit issued — General Construction
M01449634-I1-GC
05/03/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
M00013749-I1
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SWARMP
01/31/2023
Cycle 9 facade inspection completed
11/23/2022
Permit issued — General Construction
M07997436-I1-GC
10/13/2022
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M07997436-I1
10/12/2022
Special inspection requirement — Masonry
ALAN DUDLEY
09/01/2022
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
09/01/2022
Special inspection requirement — Final
ALAN DUDLEY
09/01/2022
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
01/20/2020
Violation issued (HPD, closed)
A
01/20/2020
Violation issued (HPD, closed)
A
08/19/2019
Cycle 8 facade report submitted
08/19/2019
Cycle 8 facade report signed — SAFE
07/01/2019
Cycle 8 facade inspection completed
04/05/2019
Permit issued — Sidewalk Shed
M00013749-I1-SH
12/20/2018
Violation issued (ECB, closed)
Elevators
08/01/2018
Violation issued (ECB, closed)
Local Law
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2018
Permit issued — Sidewalk Shed
M00013749-I1-SH
03/02/2018
Cycle 8 facade report submitted
03/02/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2018
Cycle 8 facade report signed — UNSAFE
02/21/2018
Violation issued (ECB, closed)
Plumbing
02/21/2018
Violation issued (ECB, closed)
Construction
02/21/2018
Violation issued (ECB, closed)
Construction
02/21/2018
Violation issued (ECB, closed)
Unknown
02/19/2018
Cycle 8 facade inspection completed
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/25/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
M00013749-I1
01/25/2018
Permit issued — Sidewalk Shed
M00013749-I1-SH
10/24/2016
Violation issued (HPD, closed)
I
06/27/2016
Violation issued (HPD, closed)
B
05/16/2016
Violation issued (HPD, closed)
B
05/16/2016
Violation issued (HPD, closed)
B
05/16/2016
Violation issued (HPD, closed)
B
05/16/2016
Violation issued (HPD, closed)
B
05/16/2016
Violation issued (HPD, closed)
B
05/16/2016
Violation issued (HPD, closed)
B
01/14/2015
Cycle 7 facade report submitted
12/16/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/15/2014
Cycle 7 facade inspection completed
12/15/2014
Cycle 7 facade report signed — SWARMP
11/10/2014
Violation issued (ECB, closed)
Local Law
03/12/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2013
Violation issued (ECB, closed)
Elevators
10/22/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2013
Violation issued (HPD, closed)
B
09/11/2013
Violation issued (HPD, closed)
C
09/11/2013
Violation issued (HPD, closed)
B
09/11/2013
Violation issued (HPD, closed)
B
09/11/2013
Violation issued (HPD, closed)
C
09/11/2013
Violation issued (HPD, closed)
B
09/11/2013
Violation issued (HPD, closed)
A
09/11/2013
Violation issued (HPD, closed)
C
09/11/2013
Violation issued (HPD, closed)
B
09/11/2013
Violation issued (HPD, closed)
B
09/11/2013
Violation issued (HPD, closed)
C
08/30/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZORIA CONSTRUCTION NY INC.09/17/2026
DOB NOWGeneral ConstructionSigned-offZORIA CONSTRUCTION NY INC11/23/2022
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC04/05/2019
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC03/21/2018
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC01/25/2018
BISOTISSUEDZORIA CONSTRUCTION NY INC.08/07/2018
BISPLISSUEDB & A PLBG & HTG CORP12/07/2015
BISFBISSUEDPETRO INC12/07/2015
BISPLISSUEDB & A PLBG & HTG CORP09/26/2014
BISFBISSUEDPETRO INC09/26/2014
2 projects · most recent 08/22/2018
Boiler Controls
FiledStatusContractorScope
08/22/2018CompleteKEVIN KEAVENY ELEC CO INCBoiler Controls
01/25/2018Permit IssuedMEO ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/12/2022MasonryALAN DUDLEYspecial
09/01/2022Energy Code Compliance InspectionsALAN DUDLEYprogress
09/01/2022FinalALAN DUDLEYprogress
09/01/2022Air barrier - visual inspectionALAN DUDLEYenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/06/2026M00013749-I1Request digital key ↗
09/01/2026M07997436-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION7
08/07/2018140785559Open ↗
01/08/2016122131683Open ↗
01/08/2016122131683Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
07/27/2018140785559Open ↗
09/30/2014122131683Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/31/2019140785559Open ↗
07/31/2019140785559Open ↗
09/30/2014122131683Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026M07997436-I1Open ↗
08/24/2026M07997436-I1Open ↗
08/24/2026M07997436-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/27/2018140785559Open ↗
09/30/2014122131683Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/06/2026M00013749-I1Open ↗
08/13/2026M07997436-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/27/2018140785559Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/30/2014122131683Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/27/2018140785559Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026M07997436-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/30/2015122131683Open ↗
09/30/2014122131683Open ↗
▸BISSCHEDULE B - PLUMBING1
09/30/2014122131683Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/27/2018140785559Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/30/2014122131683Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/27/2018140785559Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M07997436-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/31/2019140785559Open ↗
09/30/2014122131683Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/31/2019140785559Open ↗
04/04/2017122131683Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/27/2018140785559Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/27/2018140785559Open ↗
▸BISNYCECC ANALYSIS1
07/27/2018140785559Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/27/2018140785559Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/04/2017122131683Open ↗
01/08/2016122131683Open ↗
01/08/2016122131683Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/31/2019140785559Open ↗
04/04/2017122131683Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/31/2019140785559Open ↗
07/27/2018140785559Open ↗
04/04/2017122131683Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM1
07/31/2019140785559Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/27/2018140785559Open ↗
▸BISEFILING COVER SHEET1
09/30/2014122131683Open ↗
▸BISADDITIONAL INFORMATION1
12/30/2015122131683Open ↗