← Back
Other college and university
Edward Guiliano Global Center
1855 BROADWAY · Name © OpenStreetMap contributors · BIN 1027193
💬 Discuss this project
1905Year Built
12Stories
W6Building Class
C4-7Zoning
78,200 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FISP: SWARMP
Other college and university · 7,800 sf lot · 10.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof21p · 5 filings · 20 docs
Penthouse1p · 1 filing · 8 docs
Floor 181p · 1 filing · 8 docs
Floor 17
Floor 16
Floor 15
Floor 141p · 1 filing · 8 docs
Floor 132p · 2 filings · 11 docs
Floor 12
Floor 11
Floor 101p · 1 filing · 4 docs
Floor 924p · 2 filings · 20 docs
Floor 85p · 1 filing · 8 docs
Floor 76p · 1 filing · 8 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 118p · 1 filing · 9 docs
Sub-Basement17p · 1 filing · 9 docs
2 jobs · most recent 08/01/2025
Cooling Towers Others Refrigeration Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/01/2025Permit IssuedPREMIER MECHANICAL SERVICCooling Towers, Others, Refrigeration Systems
Refrigeration
Baltimore Aircoil S15E-1212-09JN 5,345,000 BTU · Condensing Unit ×1
Cooling Tower
Baltimore Aircoil S15E-1212-09JNW 5,345,000 BTU · Condensing Unit ×1
Other
Climaccol UWCS30AHT801200000000000000 189 tons · Water Cooled Chiller ×2
05/22/2025Permit IssuedPREMIER MECHANICAL SERVICAir Conditioning Systems
Cooling
Lg LSN243HLV 30,000 BTU · Fan Coil Indoor ×2
3 jobs · most recent 06/09/2025
FiledStatusContractorScope
06/09/2025——3 heads
04/16/2025Signed-offABCO-PEERLESS SPRKLR CORP69 heads
10/30/2024Signed-offNYC FIRE SPRINKLER CORP124 heads
1 job · most recent 11/27/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/27/2024Signed-offMAC FELDER INCGas, Water/Sanitary
10 jobs · most recent 09/03/2026
General Wiring
FiledStatusContractorScope
09/03/2026Permit IssuedDIANE ELECTRIC INC.General Wiring
02/10/2026CompleteDENALI ELECTRIC CORP—
02/26/2025CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
06/17/2024Permit IssuedSTRAND ELECTRIC CO., INC.General Wiring
05/28/2024CompleteUSIS ELECTRIC INC—
02/06/2024CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
06/07/2023CompletePREMIER ELECTRIC, INCGeneral Wiring
09/09/2021CompleteSRM ELECTRICAL SVCS INC—
01/23/2020CompleteTOP SHELF ELECTRIC CORP—
06/04/2018CompletePRIME LIGHT ELEC'L CONSTRGeneral Wiring
2 jobs · most recent 08/01/2025
Steel Concrete
FiledStatusContractorScope
08/01/2025Permit IssuedPREMIER MECHANICAL SERVICSteel
11/27/2024Signed-offJRM CONSTRUCTION MGMT LLCSteel, Concrete
1 job · most recent 08/17/2021
Scaffold
FiledStatusContractorScope
08/17/2021Permit IssuedTRIERA CONTRACTING INCScaffold
Building Lifecycle
All (234)Filed (36)Permit Issued (31)Signed Off (17)Facade (FISP) (15)Violation (60)Inspection (25)Objection (20)Special Inspection (30)
08/31/2026
Filed — Alteration
AT&T Decom - Removal of existing equipment shelter, cabinets and HVAC on roof. Removal of existing antenna sectors and RRH units on roof. Removal of service connection. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress
M01389300-I1
05/11/2026
Signed off — Alteration
Propose installation of new sprinkler heads. No change in use, egress or occupancy.
M01194776-I1
03/04/2026
Permit issued — Mechanical Systems
M01229283-I1-MS
03/04/2026
Permit issued — Structural
M01229283-S1-ST
11/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/12/2025
Permit issued — Structural
M01229283-S1-ST
11/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/07/2025
Permit issued — Mechanical Systems
M01229283-I1-MS
10/06/2025
Signed off — Alteration
MODIFICAITON OF PLUMBING FIXTURES AND RELATED PIPING ON 9TH FLOOR LAB AS SHOW ON PLANS.
M01040364-S3
09/12/2025
Objection resolved — Addressed
09/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/22/2025
Objection resolved — Addressed
08/14/2025
Objection raised — Other
08/01/2025
Filed — Alteration
Remove existing and replace with new roof mounted cooling tower, exhaust fan in penthouse, chiller in basement and water pumps in basement., and Install new associate piping as shown on drawings.
M01229283-S1
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Structural
07/30/2025
Objection raised — Admin
07/30/2025
Objection raised — Energy
07/28/2025
Permit issued — Mechanical Systems
M01207589-I1-MS
07/23/2025
Filed — Alteration
Remove existing and replace with new roof mounted cooling tower, exhaust fan in penthouse, chiller in basement and water pumps in basement., and Install new associate piping as shown on drawings.
M01229283-I1
07/23/2025
Permit issued — Sprinklers
M01194776-I1-EW-SP
07/17/2025
Cycle 10 facade report signed — SWARMP
06/30/2025
Cycle 10 facade report submitted
06/26/2025
Cycle 10 facade inspection completed
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/09/2025
Filed — Alteration
Propose removal of (3) sprinkler heads and branch line in elevator motor room. No change in use, egress or occupancy.
M01227900-I1
06/06/2025
Objection raised — Mechanical
06/06/2025
Objection raised — Plumbing
06/06/2025
Objection raised — Cost
05/22/2025
Filed — Alteration
Installation of two split DX units to cool an elevator machine room.
M01207589-I1
05/21/2025
Special inspection requirement — Electrical motors and elevators
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — Final
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — Shutoff dampers
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — Maintenance information
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — Mechanical Systems
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — Post-installed Anchors
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT KARPOWICZ
05/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT KARPOWICZ
05/19/2025
Violation issued (ECB, closed)
Local Law
05/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT KARPOWICZ
05/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT KARPOWICZ
05/06/2025
Special inspection requirement — Maintenance information
ROBERT KARPOWICZ
05/06/2025
Special inspection requirement — Post-installed Anchors
ROBERT KARPOWICZ
05/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT KARPOWICZ
05/01/2025
Signed off — Alteration
Install new structural framing wall between buildings as shown on drawings filed herewith.
M01063494-I1
04/30/2025
Signed off — Alteration
M00781303-I1
04/30/2025
Signed off — Alteration
Propose to construct wall opening between structures as shown on drawings filed herewith.
M00784741-I1
04/23/2025
Signed off — Alteration
M00861049-I1
04/16/2025
Filed — Alteration
Propose installation of new sprinkler heads. No change in use, egress or occupancy.
M01194776-I1
04/08/2025
Special inspection requirement — Final
ROBERT KARPOWICZ
Latest 60 of 234 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYIT707/08/2026
TRIERA CONTRACTING INC503/22/2026
T-MOBILE403/22/2026
LINCON SQUARE ASSOCIATES103/22/2026
OWNER OF 1855 BROADWAY103/22/2026
JRM103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE ZONING4803/21/2026
WALTER T GORMAN PE803/21/2026
CONSTRUCTION PERMIT SERVICES503/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.J. REGAN & COMPANY LLCGeneral Contractor907/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor707/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor607/08/2026
PREMIER MECHANICAL SERVICGeneral Contractor507/08/2026
RAMAPO COMMUNICATION CORPGeneral Contractor407/08/2026
HELLMAN CONSTRUCTION COGeneral Contractor307/08/2026
TRIERA CONTRACTING INCGeneral Contractor303/21/2026
WATCH HILL WIRELESS SOLUGeneral Contractor303/21/2026
STANDARD FIRE PROTECT LLCFire Protection207/08/2026
NYC FIRE SPRINKLER CORPFire Protection207/08/2026
MAC FELDER INCPlumbing107/08/2026
HEMNAUTH, SUDESHElectrical103/21/2026
ISAKSEN, CHRISITANElectrical103/21/2026
PRIME LIGHT ELEC'L CONSTRElectrical103/22/2026
SCHLESINGER ELECT'L CONTRElectrical103/22/2026
WALTON, MARCElectrical103/21/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
SAC WIRELESS,LLCGeneral Contractor107/08/2026
ALLIANCE PLUMBING CORPPlumbing107/08/2026
GRILLO, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB DESIGN GROUP, LLC513108/31/2026
SKYTESTING CIVIL LLC84481408/01/2025
WALTER T. GORMAN, P.E., P268606/09/2025
GRANT ENGINEERING CONSULT3512207/12/2023
NAPACH ARCHITECTU2945205/09/2023
BURTNER ENGINEERING SERVI5910211/27/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPREMIER MECHANICAL SERVIC03/04/2026
DOB NOWStructuralPermit IssuedPREMIER MECHANICAL SERVIC03/04/2026
DOB NOWStructuralPermit IssuedPREMIER MECHANICAL SERVIC11/12/2025
DOB NOWMechanical SystemsPermit IssuedPREMIER MECHANICAL SERVIC10/07/2025
DOB NOWMechanical SystemsPermit IssuedPREMIER MECHANICAL SERVIC07/28/2025
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP07/23/2025
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC10/25/2024
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC08/14/2024
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP08/12/2024
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP07/15/2024
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC07/11/2024
DOB NOWStructuralSigned-offW.J. REGAN & COMPANY LLC06/14/2024
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP06/12/2024
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC05/29/2024
DOB NOWPlumbingSigned-offMAC FELDER INC05/29/2024
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC05/24/2024
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC05/23/2024
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC05/23/2024
DOB NOWGeneral ConstructionSigned-offHELLMAN CONSTRUCTION CO02/08/2024
DOB NOWMechanical SystemsSigned-offHELLMAN CONSTRUCTION CO02/08/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE02/08/2024
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC06/22/2023
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP06/21/2023
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU02/17/2023
DOB NOWSupported ScaffoldPermit IssuedTRIERA CONTRACTING INC08/17/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/17/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/24/2020
DOB NOWAntennaPermit IssuedSAC WIRELESS,LLC12/06/2019
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP01/14/2019
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP02/02/2018
BISOTISSUEDHENRY RESTORATION LTD12/03/2021
BISOTISSUEDHENRY RESTORATION LTD12/21/2020
BISOTISSUEDHENRY RESTORATION LTD10/05/2020
BISOTRE-ISSUEDHENRY RESTORATION LTD07/08/2020
BISPLISSUEDNEW ERA MECHANICAL SER IN07/23/2018
BISOTISSUEDW.J. REGAN & COMPANY LLC07/19/2018
BISSPISSUEDSTANDARD FIRE SUPP CORP07/18/2018
BISPLISSUEDNEW ERA MECHANICAL SER IN12/21/2017
BISPLISSUEDNEW ERA MECHANICAL SER IN12/21/2017
+ 41 more permits on file
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
11/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/28/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
05/21/2025Shutoff dampersROBERT KARPOWICZenergy_progress
05/21/2025Electrical motors and elevatorsROBERT KARPOWICZenergy_progress
05/21/2025HVAC-R and service water piping design and insulationROBERT KARPOWICZenergy_progress
05/21/2025HVAC-R and service water heating system controlsROBERT KARPOWICZenergy_progress
05/21/2025HVAC-R and service water heating equipmentROBERT KARPOWICZenergy_progress
05/21/2025FinalROBERT KARPOWICZprogress
05/21/2025Mechanical SystemsROBERT KARPOWICZspecial
05/21/2025Fire-Resistant Penetrations and JointsROBERT KARPOWICZspecial
05/21/2025Post-installed AnchorsROBERT KARPOWICZspecial
05/21/2025Maintenance informationROBERT KARPOWICZenergy_progress
05/06/2025Maintenance informationROBERT KARPOWICZenergy_progress
05/06/2025Post-installed AnchorsROBERT KARPOWICZspecial
05/06/2025HVAC-R and service water piping design and insulationROBERT KARPOWICZenergy_progress
05/06/2025HVAC-R and service water heating equipmentROBERT KARPOWICZenergy_progress
05/06/2025HVAC-R and service water heating system controlsROBERT KARPOWICZenergy_progress
04/08/2025FinalROBERT KARPOWICZprogress
04/08/2025Mechanical SystemsROBERT KARPOWICZspecial
10/31/2024Fire-Resistant Penetrations and JointsROBERT KARPOWICZspecial
10/31/2024Sprinkler SystemsROBERT KARPOWICZspecial
10/31/2024Post-installed AnchorsROBERT KARPOWICZspecial
10/29/2024Sprinkler SystemsROBERT KARPOWICZspecial
10/29/2024Post-installed AnchorsROBERT KARPOWICZspecial
10/29/2024Fire-Resistant Penetrations and JointsROBERT KARPOWICZspecial
09/20/2024Fire-Resistance Rated ConstructionWalter Gormanprogress
09/20/2024FinalWalter Gormanprogress
Latest 25 of 68.
▾Documents — 823 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch34
09/22/2026M01389300-I1Request digital key ↗
09/03/2026M00577777-I1Request digital key ↗
09/01/2026M00784741-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/05/2026M00213528-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00300503-I1Request digital key ↗
▸Applications & Permits138
▸BISPLAN / WORK APPROVAL APPLICATION81
07/27/2021120994692Open ↗
07/21/2021103867781Open ↗
07/09/2021103867781Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION55
07/08/2020140914893Open ↗
07/25/2018123568512Open ↗
07/19/2018123433999Open ↗
Showing 3 of 55 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/30/2018103867781Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications210
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION80
05/23/2019123568512Open ↗
05/23/2019123433999Open ↗
09/12/2018122733328Open ↗
Showing 3 of 80 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/22/2026M01389300-I1Open ↗
09/06/2026M00006792-I1Open ↗
09/05/2026M00213528-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/25/2026M01073265-P1Open ↗
09/23/2026M01229283-I1Open ↗
09/23/2026M01229283-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/25/2026M01073265-P1Open ↗
09/23/2026M01229283-I1Open ↗
09/02/2026M01063494-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
07/13/2017123295237Open ↗
07/13/2017123295246Open ↗
07/03/2017123060588Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
06/22/2020140914893Open ↗
07/13/2017123295237Open ↗
07/13/2017123295246Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/22/2020140914893Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/22/2020140914893Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment44
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
06/19/2019123568512Open ↗
06/04/2019123568512Open ↗
06/06/2018123568512Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
09/05/2019123599533Open ↗
04/30/2018122625542Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
11/17/2022140497745Open ↗
▸Safety & Tenant Protection2
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/06/2018123568512Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
06/22/2020140914893Open ↗
▸Environmental & Asbestos69
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
06/22/2020140914893Open ↗
07/18/2018123433999Open ↗
07/18/2018123433999Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form16
08/31/2026M00864711-I1Open ↗
08/31/2026M00861049-I1Open ↗
08/31/2026M00860990-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/22/2026M01389300-I1Open ↗
09/05/2026M00213528-I1Open ↗
09/01/2026M00784741-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
07/13/2017123295246Open ↗
07/13/2017123060588Open ↗
07/13/2017123295237Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: WORK UNDER 1000 SQFT (DEP ACP7)3
06/19/2018123568512Open ↗
06/19/2018123568512Open ↗
06/19/2018123568512Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance61
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
05/23/2019123568512Open ↗
06/06/2018123568512Open ↗
06/06/2018123568512Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
05/23/2019123568512Open ↗
10/04/2017122886699Open ↗
09/28/2017123060588Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/22/2020140914893Open ↗
Showing 1 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports22
▸BISHYDRAULIC FLOW CALCULATIONS10
05/25/2018123433999Open ↗
05/25/2018123433999Open ↗
06/07/2017122733328Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/10/2020140914893Open ↗
06/22/2020140914893Open ↗
08/10/2017140497745Open ↗
Showing 3 of 7 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
06/21/2021103805107Open ↗
▸BIS* WELDING 27-6161
06/21/2021103805107Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
06/21/2021103805107Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/08/2020140914893Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs60
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
07/06/2021103807007Open ↗
07/06/2021103990709Open ↗
06/21/2021103805107Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/28/2017123060588Open ↗
09/25/2017123295246Open ↗
08/30/2017122986607Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M00577777-I1Open ↗
08/13/2026M01207589-I1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/27/2026M01036448-I1Open ↗
08/13/2026M01073265-I1Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
07/03/2017123060588Open ↗
▸Cost, Insurance & Ownership80
▸BISCOST AFFIDAVIT78
11/23/2021123568512Open ↗
07/02/2021103807007Open ↗
06/22/2020140914893Open ↗
Showing 3 of 78 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/16/2021121129527Open ↗
07/06/2021103990709Open ↗
▸Filing & Intake Forms70
▸BISEFILING COVER SHEET40
06/06/2018123568512Open ↗
05/25/2018123433999Open ↗
05/25/2018123599533Open ↗
Showing 3 of 40 on file for this type
▸BISADDITIONAL INFORMATION13
07/21/2021103867781Open ↗
03/04/2021140914893Open ↗
06/07/2017122733328Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM13
09/05/2019123599533Open ↗
08/06/2019123433999Open ↗
06/19/2019123568512Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
06/22/2020140914893Open ↗
Showing 1 of 4 on file for this type
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION20
05/25/2018123599533Open ↗
07/13/2017123295246Open ↗
07/13/2017123295237Open ↗
Showing 3 of 20 on file for this type
▸BIS* HIGH STRENGTH BOLTS TABLE 10-21
06/21/2021103805107Open ↗
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSD/SP FIRE PUMP TEST : FP-861
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMICROFILM/SCAN: INITIAL1
07/06/2021103990709Open ↗