← Back
BuildNYC
Walk-up apt, over six families with stores
1858 LEXINGTON AVENUE
MANHATTAN · BIN 1052235
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7DZoning
8,940 sfGross Floor Area
10Units
Rent Stabilized5 Active Violations 4 unresolved · 1 paperwork only 6 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: 1858 Lexington Ave Realty · 1,944 sf lot · 4.6 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 51 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 12 filings
Cellar2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1858 Lexington Ave Realty103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Niza Works of Architecture511/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Niza Works of Architecture603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B Y Constructionspecialty_contractor603/21/2026
Watermark PlumbingPlumbing407/08/2026
Symmetrical ConstructionGeneral Contractor406/28/2026
B Y ConstructionGeneral Contractor303/21/2026
HI-Rite ElectricElectrical203/22/2026
BT's Plumbing and HeatingPlumbing107/08/2026
Jte Electrical ServicesElectrical103/21/2026
RDT Home InprovementGeneral Contractor103/21/2026
S&R ElectricalElectrical103/22/2026
Symmetrical Construcspecialty_contractor106/28/2026
Alpha ZK Tekno ContractorGeneral Contractor106/28/2016
Aranda Plumbing & HeatingPlumbing105/30/2018
Medra Exhaust SystemsGeneral Contractor105/29/2018
Mega MechanicalFire Protection108/06/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR Consulting Engineer P4054411/09/2026
Niza Works6101511/09/2026
Building Lifecycle
11/09/2026
Filed — Alteration CO
INTERIOR ALTERATION OF AN EXISTING OLD LAW TENEMENT. APARTMENTS TO BE RENOVATED AT EACH FLOOR. ONE STORE TO BE RENOVATED AT THE FIRST FLOOR AND CELLAR STORAGE. NO CHANGE IN USE OR OCCUPANCY.
M00945004-P2
10/06/2026
Special inspection requirement — Air barrier - visual inspection
Nicolas Zapata
10/06/2026
Special inspection requirement — Maintenance information
Nicolas Zapata
10/06/2026
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
10/06/2026
Special inspection requirement — Lighting in dwelling units
Nicolas Zapata
123 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Symmetrical Construction—
DOB NOW—Symmetrical Construction—
DOB NOW—Watermark Plumbing—
DOB NOW—Symmetrical Construction—
DOB NOW—Symmetrical Construction—
DOB NOW—Watermark Plumbing—
DOB NOW—B Y Construction—
DOB NOW—Watermark Plumbing—
DOB NOW—Watermark Plumbing—
DOB NOW—BT's Plumbing and Heating—
DOB NOW—B Y Construction—
DOB NOW—B Y Construction—
BIS—Mega Mechanical—
BIS—Aranda Plumbing & Heating—
BIS—Medra Exhaust Systems—
BIS—RDT Home Inprovement—
BIS—Alpha ZK Tekno Contractor—
BIS—Vista Media Group—
Nothing on file for this building.
Nothing on file for this building.
97 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account