← Back
BuildNYC
Two stories - detached, small or mid-size
186-05 WEXFORD TERRACE
QUEENS · BIN 4213331
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
1,872 sfGross Floor Area
1Units
5 Active Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,880 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction11p · 1 filing · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
Site & exteriorErect construction fence to safeguard propertyUnder Construction4p · 2 filings · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2019$801K—Private party → Private party$428/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Maz Design503/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maz Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ivr ConstructionGeneral Contractor207/04/2026
Ivr ConstructionScaffold207/04/2026
Trincity ElectricElectrical103/22/2026
Maz 247General Contractor107/08/2026
Maz 247Scaffold107/08/2026
Plumbing-It MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MS Building Design9220203/12/2025
Building Lifecycle
09/16/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
Q00751279-S2-PL
09/03/2026
Work does not conform to approved construction documents and/or approved amendments. Atoi, i observed at exp 1 a wood awning approx 8FT x 8FT. The…
ECB violation · open
09/03/2026
Failure to safequard the public and property affected by the construction operations. Atoi, i observed unsafe conditions at ongoing exterior work…
ECB violation · open
09/03/2026
Failure to maintain adequate housekeeping per section requirements. Atoi, i observed multiple trip / falling hazards. Loose bricks, sand and debris…
ECB violation · open
04/24/2026
Permit renewed — General Construction
Renewed without changes
Q00751279-I1-GC
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIvr Construction04/24/2026
DOB NOWConstruction FencePermit IssuedIvr Construction04/16/2026
DOB NOWPlumbingPermit IssuedJVR Plumbing and Heating09/16/2025
DOB NOWConstruction FencePermit IssuedIvr Construction09/06/2024
DOB NOWGeneral ConstructionPermit IssuedIvr Construction07/05/2024
DOB NOWGeneral ConstructionPermit IssuedMaz 24704/20/2022
DOB NOWConstruction FencePermit IssuedMaz 24703/24/2022
1 project · most recent 03/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/12/2025Permit IssuedPlumbing-It MechanicalGas, Storm, Water/Sanitary
1 project · most recent 08/16/2024
General Wiring
FiledStatusContractorScope
08/16/2024Permit IssuedTrincity ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/04/2025Energy Code Compliance Inspections—progress
02/04/2025HVAC-R and service water heating equipment—energy_progress
02/04/2025HVAC-R and service water heating system controls—energy_progress
02/04/2025Metering—energy_progress
02/21/2024Fire-Resistance Rated ConstructionMD SHAHJADAprogress
02/21/2024Fenestration areasMD SHAHJADAenergy_progress
02/21/2024Fenestration air leakageMD SHAHJADAenergy_progress
02/21/2024Insulation placement and R valuesMD SHAHJADAenergy_progress
02/21/2024Concrete - Cast-In-PlaceMD SHAHJADAspecial
02/21/2024Lighting in dwelling unitsMD SHAHJADAenergy_progress
02/21/2024Fenestration and door U-factor and product ratingsMD SHAHJADAenergy_progress
02/21/2024MeteringMD SHAHJADAenergy_progress
02/21/2024Electric vehicle service equipment requirementsMD SHAHJADAenergy_progress
02/21/2024Air barrier - visual inspectionMD SHAHJADAenergy_progress
02/21/2024Fire-Resistant Penetrations and JointsMD SHAHJADAspecial
02/21/2024Structural Stability – Alterations of existing buildingsMD SHAHJADAspecial
02/21/2024Energy Code Compliance InspectionsMD SHAHJADAprogress
65 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account