← Back
Walk-up apt, over six families with stores
186 1 AVENUE
MANHATTAN · BIN 1005967
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R7AZoning
6,920 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: 186-188 FIRST AVE LLC · 2,500 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof12p · 5 filings · 20 docs
Floor 526p · 5 filings · 20 docs
Floor 420p · 4 filings · 20 docs
Floor 323p · 5 filings · 20 docs
Floor 225p · 5 filings · 20 docs
Floor 129p · 6 filings · 20 docs
Cellar33p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUBB NYC PROPERTIES4907/08/2026
METRO CONTRACTING NY707/08/2026
MR PIZZA INC703/22/2026
186-188 FIRST AVE503/22/2026
FIRST AVENUE REALTY803/22/2026
188 FIRST AVENUE REALTY1003/21/2026
1ST AV REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOWARD L ZIMMERMAN ARCHITECTS1803/21/2026
HLZAE503/21/2026
NEW YORK DESIGN ARCHITECT LLP203/21/2026
TRI-NORTH CONTRACTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KC EXPEDITING INCGeneral Contractor607/08/2026
MILES GLASS & METAL SIGNGeneral Contractor603/21/2026
FC NEWLAND GENERAL CONTRAGeneral Contractor307/08/2026
METRO CONTRACTING NY, INC.General Contractor207/08/2026
CITY PLUMBING INCPlumbing207/08/2026
A + SPRINKLER CORPFire Protection107/08/2026
CROSS CONTRACTING INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957101/12/2026
AMARACON TESTING & INSPEC58421004/25/2025
FLUSHING ENGINEERING SERV4373107/05/2023
Building Lifecycle
All (125)Filed (20)Permit Issued (15)Signed Off (4)Violation (26)Inspection (12)Objection (18)Special Inspection (30)
03/23/2026
Permit issued — Mechanical Systems
M01342665-I1-MS
01/21/2026
Objection raised — Scope
01/21/2026
Objection resolved — Addressed
01/12/2026
Filed — Alteration
APPLICATION FILED PER NYC DOB REQUEST TO SEPARATE MH SCOPE FOR SEPARATE TAX LOTS REFER TO APP# M01194261-I1 FOR ALL SPECIAL INSPECTION &RELATED MECHANICAL SCOPE THIS APP IS TO SOLELY RESPRESET THE LOCATION OF THE UNITS FOR ( please see comments section)
M01342665-I1
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
01/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
01/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Final
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Maintenance information
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES. NO CHANGE TO USE,EGRESS, OR OCCUPANCY.
M01253016-S1
07/16/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES. NO CHANGE TO USE,EGRESS, OR OCCUPANCY.
M01253016-I1
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/08/2025
Special inspection requirement — Final
07/08/2025
Special inspection requirement — Mechanical Systems
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
04/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
04/30/2025
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
04/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
04/30/2025
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
04/30/2025
Special inspection requirement — Masonry
CONNIE PISANI
04/25/2025
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P4
04/17/2025
Special inspection requirement — Masonry
CONNIE PISANI
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
04/17/2025
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
04/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
04/03/2025
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P3
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/31/2025
Signed off — Alteration
M01149236-I1
01/30/2025
Signed off — Alteration
Full mechanical reconstruction for the entire building. no change in use, egress, or occupancy.
M08026655-I1
01/15/2025
Signed off — Alteration
M00807922-I1
01/06/2025
Filed — Alteration
Full mechanical reconstruction for the entire building. no change in use, egress, or occupancy.
M08026655-P2
12/31/2024
Signed off — Alteration
Plumbing work filed in conjunction with Architectural application #M08014520 to restore fire damaged building. No change to use, egress, or occupancy.
M08027724-I1
12/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/16/2024
Permit issued — Sprinklers
M01149236-I1-EW-SP
12/10/2024
Objection resolved — Addressed
12/06/2024
Inspection — Pass-Final House Connection
Pass
View inspection ↗
12/03/2024
Filed — Alteration
M01149236-I1
12/02/2024
Inspection — No Access-Final House Connection
No Access
View inspection ↗
11/25/2024
Inspection — Fail-Final House Connection
Fail
View inspection ↗
11/25/2024
Objection raised — Scope
11/15/2024
Permit issued — General Construction
M08014520-I1-GC
11/15/2024
Permit issued — Mechanical Systems
M08026655-I1-MS
11/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2024
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P2
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCROSS CONTRACTING INC03/23/2026
DOB NOWSprinklersSigned-offA + SPRINKLER CORP12/16/2024
DOB NOWGeneral ConstructionPermit IssuedKC EXPEDITING INC11/15/2024
DOB NOWMechanical SystemsSigned-offKC EXPEDITING INC11/15/2024
DOB NOWPlumbingSigned-offCITY PLUMBING INC05/28/2024
DOB NOWGeneral ConstructionPermit IssuedMILES GLASS & METAL SIGN12/28/2023
DOB NOWGeneral ConstructionPermit IssuedKC EXPEDITING INC11/06/2023
DOB NOWGeneral ConstructionSigned-offKC EXPEDITING INC10/30/2023
DOB NOWSidewalk ShedPermit IssuedMETRO CONTRACTING NY, INC.07/14/2023
DOB NOWSupported ScaffoldPermit IssuedMETRO CONTRACTING NY, INC.07/14/2023
DOB NOWGeneral ConstructionPermit IssuedMILES GLASS & METAL SIGN07/13/2023
DOB NOWPlumbingSigned-offCITY PLUMBING INC02/10/2023
DOB NOWStructuralSigned-offFC NEWLAND GENERAL CONTRA02/09/2023
DOB NOWGeneral ConstructionPermit IssuedFC NEWLAND GENERAL CONTRA02/06/2023
DOB NOWMechanical SystemsSigned-offFC NEWLAND GENERAL CONTRA02/06/2023
BISOTISSUEDBELFOR LONG ISLAND LLC08/02/2022
BISOTISSUEDBELFOR LONG ISLAND LLC02/08/2022
BISOTISSUEDBELFOR LONG ISLAND LLC07/08/2020
BISOTISSUEDBELFOR LONG ISLAND LLC06/13/2019
BISMHISSUEDG.M. CONSTRUCTION & WATERPROOF04/11/2016
BISPLISSUEDTW PLUMBING & HEATING INC07/01/2015
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF06/17/2015
BISPLISSUEDTW PLUMBING & HEATING INC12/03/2014
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF11/20/2014
BISOTISSUEDPAUL SIGNS INC03/28/2014
BISMHISSUEDDEODAT MAHADEO D/B/A PARS02/10/2009
BISOTISSUEDTHREE STAR CONSTRUCTION INC07/29/2008
BISPLISSUEDWASOFF PLBG & UTILITY CO06/30/2008
BISOTISSUEDTHREE STAR CONSTRUCTION06/03/2008
BISPLISSUEDTHE PLUMBING COMPANY INC.06/20/2006
BISOTISSUEDAP. TEK RESTORATION INC06/07/2006
BISOTISSUEDKING SHA GROUP INC03/28/2006
BISPLISSUEDS & L PLUMBING INC03/22/2006
BISOTISSUEDKING SHA GROUP INC02/28/2006
BISFBISSUEDPILOT ENERGY CORPORATION03/12/1991
BISPLISSUEDWASOFF PLBG & UTILITY CO03/06/1991
2 projects · most recent 01/12/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2026Permit IssuedCROSS CONTRACTING INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric CU-C-1 - CU-1-4 60,000 BTU ×4
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×2
07/16/2025——Ventilation Systems
Ventilation
Captiveaire DMUA18 2,220 CFM · Makeup Air ×1
DU180HFA 2,500 CFM · Kitchen Exhaust ×1
1 project · most recent 07/16/2025
Water/Sanitary
FiledStatusContractorScope
07/16/2025——Water/Sanitary
2 projects · most recent 01/29/2025
General Wiring
FiledStatusContractorScope
01/29/2025CompleteWCK ELECTRIC CORP.General Wiring
07/14/2023Permit IssuedRICHARD NEU—
1 project · most recent 07/14/2023
Scaffold
FiledStatusContractorScope
07/14/2023Permit IssuedMETRO CONTRACTING NY, INCScaffold
1 project · most recent 07/05/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/05/2023Permit IssuedMILES GLASS & METAL SIGNTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/06/2024Pass-Final House ConnectionPassView ↗
12/02/2024No Access-Final House ConnectionNo AccessView ↗
11/25/2024Fail-Final House ConnectionFailView ↗
11/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/11/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
01/12/2026Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
01/09/2026Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
01/06/2026Maintenance informationGiuseppe Anzaloneenergy_progress
01/06/2026Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
01/06/2026HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
01/06/2026HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
01/06/2026HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
01/06/2026FinalGiuseppe Anzaloneprogress
01/06/2026Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
01/06/2026Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
01/06/2026Mechanical SystemsGiuseppe Anzalonespecial
01/06/2026Shutoff dampersGiuseppe Anzaloneenergy_progress
07/16/2025Tenant Protection Plan Compliance—special
07/16/2025Tenant Protection Plan Compliance—special
07/14/2025Energy Code Compliance Inspections—progress
07/14/2025Fire-Resistant Penetrations and Joints—special
07/08/2025Mechanical Systems—special
07/08/2025Final—progress
04/30/2025Energy Code Compliance InspectionsCONNIE PISANIprogress
04/30/2025Fire-Resistance Rated ConstructionCONNIE PISANIprogress
04/30/2025Insulation placement and R valuesCONNIE PISANIenergy_progress
04/30/2025Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
04/30/2025Air barrier - visual inspectionCONNIE PISANIenergy_progress
04/30/2025MasonryCONNIE PISANIspecial
04/30/2025Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
Latest 25 of 75.
▾Documents — 224 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/01/2026M08026655-P1Request digital key ↗
09/01/2026M08026655-I1Request digital key ↗
09/01/2026M08026655-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits30
▸BISWORK PERMIT APPLICATION16
08/01/2019123860777Open ↗
06/14/2019123860777Open ↗
06/13/2016122415804Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
03/07/2023123860777Open ↗
06/17/2022123860777Open ↗
04/01/2019123860777Open ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026M08014520-P2Open ↗
08/13/2026M08014520-I1Open ↗
08/13/2026M08014520-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026M08026655-P2Open ↗
09/01/2026M08026655-I1Open ↗
09/01/2026M08026655-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M01342665-I1Open ↗
09/23/2026M01342665-I1Open ↗
09/01/2026M08026655-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
04/01/2019123860777Open ↗
07/05/2016122415804Open ↗
07/05/2016122415804Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01342665-I1Open ↗
09/01/2026M08026655-P1Open ↗
08/27/2026M08014520-P3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
03/28/2014121945495Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/13/2008110339134Open ↗
08/21/2008110321553Open ↗
07/21/2008110294075Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
03/28/2014121945495Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE9
07/17/2015122415804Open ↗
01/30/2015122015363Open ↗
01/29/2015122015363Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/01/2019123860777Open ↗
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
▸BISSCHEDULE B - PLUMBING2
07/21/2008110294075Open ↗
05/08/2008110162494Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026M08014520-P1Open ↗
08/13/2026M08014520-P2Open ↗
08/13/2026M08014520-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
04/01/2019123860777Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026M08026655-I1Open ↗
08/25/2026M01149236-I1Open ↗
08/13/2026M00807922-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/09/2019123860777Open ↗
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
07/21/2008110294075Open ↗
07/21/2008110294075Open ↗
07/21/2008110294075Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026M01342665-I1Open ↗
08/13/2026M01253016-S1Open ↗
08/13/2026M01253016-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/13/2008110339134Open ↗
08/21/2008110321553Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/01/2019123860777Open ↗
07/05/2016122415804Open ↗
04/27/2016122015363Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/05/2016122415804Open ↗
04/27/2016122015363Open ↗
03/05/2015121945495Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/08/2023123860777Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/08/2023123860777Open ↗
03/08/2023123860777Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/08/2023123860777Open ↗
07/05/2016122415804Open ↗
04/27/2016122015363Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/24/2015122415804Open ↗
09/13/2008110339134Open ↗
07/21/2008110294075Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
03/08/2023123860777Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
06/24/2022123860777Open ↗
04/01/2019123860777Open ↗
07/05/2016122415804Open ↗
Showing 3 of 14 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/13/2016122415804Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2023123860777Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
04/01/2019123860777Open ↗
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
07/08/2022123860777Open ↗
06/27/2022123860777Open ↗
▸BISeFiling Job Application Cover Sheet1
07/21/2008110294075Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/13/2026M08014520-P3Open ↗
08/13/2026M08014520-I1Open ↗
08/13/2026M08014520-P2Open ↗
Showing 3 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
11/25/2014122015363Open ↗