← Back
BuildNYC
Large suburban residence
186-15 HENLEY ROAD
QUEENS · BIN 4213505
💬 Discuss this project
1950Year Built
1Stories
A3Building Class
R1-2Zoning
3,440 sfGross Floor Area
1Units
Large suburban residence · 10,960 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticResidential alteration7p · 2 filings · 16 docs
Floor 1Residential alteration6p · 1 filing · 14 docs
CellarResidential alteration6p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/18/2022$1.3M—Private party → Private party$378/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ima Engineering304/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ima Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roland Mechanical of NY*specialty_contractor407/08/2026
Bypass MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252204/01/2022
Building Lifecycle
04/27/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00667338-S1-GC
02/02/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00667338-I1-GC
05/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/11/2022
Signed off — Alteration
Q00667353-I1
05/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRoland Mechanical of NY*04/27/2022
DOB NOWGeneral ConstructionPermit IssuedRoland Mechanical of NY*04/26/2022
DOB NOWPlumbingSigned-offBypass Mechanical04/22/2022
2 projects · most recent 06/08/2022
General Wiring
FiledStatusContractorScope
06/08/2022CompleteAll-Rite Electric Corp of NYGeneral Wiring
05/27/2022CompleteAll-Rite Electric Corp of NY—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/17/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
02/17/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account