← Back
BuildNYC
Walk-up apt, over six families with stores
186 1ST AVENUE
MANHATTAN · East Village · BIN 1005967
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R7AZoning
6,920 sfGross Floor Area
10Units
Rent Stabilized0 Active Violations
Walk-up apt, over six families with stores · Owner of record: 186-188 First Ave · 2,500 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof186-188 First Ave LLC38p · 7 filings · 20 docs
Floor 5186-188 First Ave LLC53p · 5 filings · 20 docs
Floor 4186-188 First Ave LLC47p · 5 filings · 20 docs
Floor 3186-188 First Ave LLC50p · 5 filings · 20 docs
Floor 2186-188 First Ave LLC52p · 6 filings · 20 docs
Floor 1186-188 First Ave LLC55p · 7 filings · 20 docs
Cellar186-188 First Ave LLC59p · 7 filings · 20 docs
Site & exteriorMr Pizza8p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hubb NYC Properties4907/08/2026
188 First Avenue Realty1703/21/2026
MR Pizza703/22/2026
186-188 First Ave503/22/2026
181 Avenue A203/21/2026
1st Ave. Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York Design Architects101/12/2026
Sohail Humayun P E207/16/2025
Howard L Zimmerman Arch & Engineering1304/25/2025
Twig Consulting Engineers112/03/2024
Enthink Engineers207/14/2023
Flushing107/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Howard L Zimmerman Architects1803/21/2026
Hlzae503/21/2026
New York Design Architect203/21/2026
Tri-North Contracting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Miles Glass & Metal Signspecialty_contractor603/21/2026
KC ExpeditingGeneral Contractor607/08/2026
FC Newland General ContractingGeneral Contractor307/08/2026
City PlumbingPlumbing207/08/2026
Metro Contracting NYScaffold207/08/2026
Cross ContractingGeneral Contractor104/09/2026
A + SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957101/12/2026
Amaracon Testing & Inspec58421004/25/2025
Flushing Engineering Service4373107/05/2023
Building Lifecycle
All (122)Filed (20)Permit Issued (15)Signed Off (4)Violation (26)Inspection (9)Objection (18)Special Inspection (30)
03/23/2026
Permit issued — Mechanical Systems
M01342665-I1-MS
01/21/2026
Objection raised — Scope
01/21/2026
Objection resolved — Addressed
01/12/2026
Filed — Alteration
APPLICATION FILED PER NYC DOB REQUEST TO SEPARATE MH SCOPE FOR SEPARATE TAX LOTS REFER TO APP# M01194261-I1 FOR ALL SPECIAL INSPECTION &RELATED MECHANICAL SCOPE THIS APP IS TO SOLELY RESPRESET THE LOCATION OF THE UNITS FOR ( please see comments section)
M01342665-I1
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
01/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
01/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Final
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Maintenance information
Giuseppe Anzalone
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES. NO CHANGE TO USE,EGRESS, OR OCCUPANCY.
M01253016-I1
07/16/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES. NO CHANGE TO USE,EGRESS, OR OCCUPANCY.
M01253016-S1
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/08/2025
Special inspection requirement — Final
07/08/2025
Special inspection requirement — Mechanical Systems
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
04/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
04/30/2025
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
04/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
04/30/2025
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
04/30/2025
Special inspection requirement — Masonry
CONNIE PISANI
04/25/2025
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P4
04/17/2025
Special inspection requirement — Masonry
CONNIE PISANI
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
04/17/2025
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
04/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
04/03/2025
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P3
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/31/2025
Signed off — Alteration
M01149236-I1
01/30/2025
Signed off — Alteration
Full mechanical reconstruction for the entire building. no change in use, egress, or occupancy.
M08026655-I1
01/15/2025
Signed off — Alteration
M00807922-I1
01/06/2025
Filed — Alteration
Full mechanical reconstruction for the entire building. no change in use, egress, or occupancy.
M08026655-P2
12/31/2024
Signed off — Alteration
Plumbing work filed in conjunction with Architectural application #M08014520 to restore fire damaged building. No change to use, egress, or occupancy.
M08027724-I1
12/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/16/2024
Permit issued — Sprinklers
M01149236-I1-EW-SP
12/10/2024
Objection resolved — Addressed
12/03/2024
Filed — Alteration
M01149236-I1
11/25/2024
Objection raised — Scope
11/15/2024
Permit issued — Mechanical Systems
M08026655-I1-MS
11/15/2024
Permit issued — General Construction
M08014520-I1-GC
11/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2024
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P2
10/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2024
Filed — Alteration CO
Fire damage repairs and rehabilitation.
M08014520-P1
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCross Contracting03/23/2026
DOB NOWSprinklersSigned-offA + Sprinkler12/16/2024
DOB NOWMechanical SystemsSigned-offKC Expediting11/15/2024
DOB NOWGeneral ConstructionPermit IssuedKC Expediting11/15/2024
DOB NOWPlumbingSigned-offCity Plumbing05/28/2024
DOB NOWGeneral ConstructionPermit IssuedMiles Glass & Metal Sign12/28/2023
DOB NOWGeneral ConstructionPermit IssuedKC Expediting11/06/2023
DOB NOWStructuralSigned-offKC Expediting10/30/2023
DOB NOWSupported ScaffoldPermit IssuedMetro Contracting NY07/14/2023
DOB NOWSidewalk ShedPermit IssuedMetro Contracting NY07/14/2023
DOB NOWGeneral ConstructionPermit IssuedMiles Glass & Metal Sign07/13/2023
DOB NOWPlumbingSigned-offCity Plumbing02/10/2023
DOB NOWStructuralSigned-offFC Newland General Contracting02/09/2023
DOB NOWGeneral ConstructionPermit IssuedFC Newland General Contracting02/06/2023
DOB NOWMechanical SystemsSigned-offFC Newland General Contracting02/06/2023
BISOTISSUEDBelfor Long Island08/02/2022
BISOTISSUEDBelfor Long Island02/08/2022
BISOTISSUEDBelfor Long Island07/08/2020
BISOTISSUEDBelfor Long Island06/13/2019
BISMHISSUEDG.M. Construction & Waterproof04/11/2016
BISPLISSUEDTW Plumbing & Heating07/01/2015
BISOTISSUEDG.M. Construction & Waterproof06/17/2015
BISPLISSUEDTW Plumbing & Heating12/03/2014
BISOTISSUEDG.M. Construction & Waterproof11/20/2014
BISOTISSUEDPaul Signs03/28/2014
BISEQISSUEDA.russo Wrecking07/16/2013
BISMHISSUEDDeodat Mahadeo D/B/A Pars02/10/2009
BISOTISSUEDThree Star Construction07/29/2008
BISPLISSUEDWasoff Plumbing & Utility Co06/30/2008
BISOTISSUEDThree Star Construction06/03/2008
BISPLISSUEDThe Plumbing Company06/20/2006
BISOTISSUEDAp. Tek Restoration06/07/2006
BISOTISSUEDKing Sha Group03/28/2006
BISPLISSUEDS & L Plumbing03/22/2006
BISOTISSUEDKing Sha Group02/28/2006
BISFBISSUEDPilot Energy03/12/1991
BISPLISSUEDWasoff Plumbing & Utility Co03/06/1991
2 projects · most recent 01/12/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2026Permit IssuedCross ContractingHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric CU-C-1 - CU-1-4 60,000 BTU ×4
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×2
07/16/2025——Ventilation Systems
Ventilation
Captiveaire DMUA18 2,220 CFM · Makeup Air ×1
DU180HFA 2,500 CFM · Kitchen Exhaust ×1
1 project · most recent 07/16/2025
Water/Sanitary
FiledStatusContractorScope
07/16/2025——Water/Sanitary
3 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedDesuze ElectricGeneral Wiring
01/29/2025CompleteWCK ElectricGeneral Wiring
07/14/2023Permit IssuedRichard Neu—
1 project · most recent 07/14/2023
Scaffold
FiledStatusContractorScope
07/14/2023Permit IssuedMetro Contracting NYScaffold
1 project · most recent 07/05/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/05/2023Permit IssuedMiles Glass & Metal SignTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/11/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
01/12/2026Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
01/09/2026Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
01/06/2026Mechanical SystemsGiuseppe Anzalonespecial
01/06/2026Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
01/06/2026Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
01/06/2026Shutoff dampersGiuseppe Anzaloneenergy_progress
01/06/2026Maintenance informationGiuseppe Anzaloneenergy_progress
01/06/2026Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
01/06/2026HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
01/06/2026HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
01/06/2026HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
01/06/2026FinalGiuseppe Anzaloneprogress
07/16/2025Tenant Protection Plan Compliance—special
07/16/2025Tenant Protection Plan Compliance—special
07/14/2025Fire-Resistant Penetrations and Joints—special
07/14/2025Energy Code Compliance Inspections—progress
07/08/2025Mechanical Systems—special
07/08/2025Final—progress
04/30/2025Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
04/30/2025MasonryCONNIE PISANIspecial
04/30/2025Energy Code Compliance InspectionsCONNIE PISANIprogress
04/30/2025Fire-Resistance Rated ConstructionCONNIE PISANIprogress
04/30/2025Insulation placement and R valuesCONNIE PISANIenergy_progress
04/30/2025Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
04/30/2025Air barrier - visual inspectionCONNIE PISANIenergy_progress
Latest 25 of 75.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mr PizzaRestaurant / Food ServiceFloor 1
Project M00895559 Alteration · Permit Entire · 07/05/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/01/2026M08026655-P2Request digital key ↗
09/01/2026M08026655-I1Request digital key ↗
09/01/2026M08026655-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION17
08/01/2019123860777Open ↗
06/14/2019123860777Open ↗
06/13/2016122415804Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
03/07/2023123860777Open ↗
06/17/2022123860777Open ↗
04/01/2019123860777Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026M08014520-P1Open ↗
08/13/2026M08014520-P4Open ↗
08/13/2026M08014520-P3Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications80
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026M08026655-P1Open ↗
09/01/2026M08026655-I1Open ↗
09/01/2026M08026655-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M01342665-I1Open ↗
09/23/2026M01342665-I1Open ↗
09/01/2026M08026655-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
04/01/2019123860777Open ↗
07/05/2016122415804Open ↗
07/05/2016122415804Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01342665-I1Open ↗
09/01/2026M08026655-P1Open ↗
08/27/2026M08014520-P3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
03/28/2014121945495Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/13/2008110339134Open ↗
08/21/2008110321553Open ↗
07/21/2008110294075Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
03/28/2014121945495Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/16/2013140095796Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/16/2013140095796Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE9
07/17/2015122415804Open ↗
01/30/2015122015363Open ↗
01/29/2015122015363Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/01/2019123860777Open ↗
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
▸BISSCHEDULE B - PLUMBING2
07/21/2008110294075Open ↗
05/08/2008110162494Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026M08014520-P2Open ↗
08/13/2026M08014520-P4Open ↗
08/13/2026M08014520-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
04/01/2019123860777Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026M08026655-I1Open ↗
08/25/2026M01149236-I1Open ↗
08/13/2026M08027724-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/09/2019123860777Open ↗
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
07/21/2008110294075Open ↗
07/21/2008110294075Open ↗
07/21/2008110294075Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026M01342665-I1Open ↗
08/13/2026M01253016-I1Open ↗
08/13/2026M01253016-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/13/2008110339134Open ↗
08/21/2008110321553Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/01/2019123860777Open ↗
07/05/2016122415804Open ↗
04/27/2016122015363Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/05/2016122415804Open ↗
04/27/2016122015363Open ↗
03/05/2015121945495Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/08/2023123860777Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/08/2023123860777Open ↗
03/08/2023123860777Open ↗
07/16/2013140095796Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/16/2013140095796Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/08/2023123860777Open ↗
07/05/2016122415804Open ↗
04/27/2016122015363Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/24/2015122415804Open ↗
09/13/2008110339134Open ↗
07/21/2008110294075Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
03/08/2023123860777Open ↗
07/16/2013140095796Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
06/24/2022123860777Open ↗
04/01/2019123860777Open ↗
07/05/2016122415804Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2023123860777Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
06/13/2016122415804Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
04/01/2019123860777Open ↗
06/24/2015122415804Open ↗
11/14/2014122015363Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
07/08/2022123860777Open ↗
06/27/2022123860777Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/16/2013140095796Open ↗
07/21/2008110294075Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/13/2026M08014520-P4Open ↗
08/13/2026M08014520-P3Open ↗
08/13/2026M08014520-P2Open ↗
Showing 3 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
11/25/2014122015363Open ↗